Riot runs computers that earn new bitcoin, and builds data-centre halls that AI companies rent for space, cooling and power.
The company · 2 · What exactly does it sell?
Today nearly all sales still come from mining
Each $1 of sales, latest quarter
89.0%from mining bitcoin
2.8%rent from data-centre tenants
Engineering work and tenant fit-outs make up the rest. Rent from the signed leases starts in December 2027.
The company · 3 · How does it make money?
Mining loses money; rent should dwarf it
$663.2Mloss in 2025, on 72% more sales
80 to 90 centsof each rent dollar expected as profit
2,418bitcoin left to sell, a cushion
Mining earns less per machine as more miners join, and loses money once machines wear out. A tenant's rent costs little to serve, so most of it is profit.
Is it a good business? · 4 · What gives it an edge?
Power that is already connected
About 474 GW
requested on the Texas grid
5.9 GW
actually switched on
241 MW
signed by two tenants in seven months
Its sites run on existing grid agreements, outside the queue that hands out new power from 2028.
Tenants can also build their own once Texas hands out new power.
Is it a good business? · 6 · What does its record show?
Growth has not made Riot profitable
Sales, $M
213.2
259.2
280.7
376.7
647.4
675.7
Dec 2021Dec 2022Dec 2023Dec 2024Dec 2025last 12 mo
Sales+72%sales growth in 2025
Loss$663.2Mloss the same year
Cushion2,418bitcoin left to sell
Mining earns less per machine as the network grows; rent is still a sliver of revenue.
Is it a good business? · 7 · How much room is there to grow?
The market is not the limit
About $65Ba year of rent on Texas large users, at most
29.9 GWcleared to connect by 2027
Under 1%Riot's 241 MW of that
Finding the power, the tenant and the money is the limit.
Is it a good business? · 8 · Who is in charge?
Jason Les signed both leases
Since 2021Jason Les in charge
About 7.8%owned by directors and officers
2025shareholders rejected the pay plan
This year's bonus rewards bitcoin output, profit against peers and data-centre revenue.
The story right now · 9 · Why do AI firms rent from bitcoin miners?
AI needs power that is already switched on
474 GWrequested on the Texas grid
5.9 GWactually switched on
About $28BRiot's biggest lease, 15 years
AI labs need huge amounts of electricity now, but new grid connections take years. Miners already hold connected power, so they can host AI computers sooner.
The story right now · 10 · Why is financing the open question?
The rent is signed; the money to build is not
A tenant signs for 15 yearsAbout $28B of rent.
Riot must build firstBefore any rent.
A short loan is due$573M on 31 December.
Long-term lenders neededOr new shares and bitcoin.
If long-term lenders sign without new shares, the gap closes. If not, Riot sells bitcoin or shares to build.
The story right now · 11 · What changed lately?
A 910 MW lease worth about $28B
About $28Bof rent over 15 years
September 2027first 400 MW due
$181.4Mquarterly sales, flat
About 97%of rent from one AI lab
Mixed quarter
It took one half of the route to Attractive and left the financing open. The shares then fell 40% in three weeks with no news.
The story right now · 12 · What is everyone arguing about?
Can Riot fund the build without new shares?
Many investors think
A miner turning into an AI landlord
We think
The leases are real; the build is not financed
Rent starts in December 2027 and the large hall runs on a loan due this December. If long-term lenders sign without new shares, we are too cautious.
The price and our view · 13 · What is a share worth?
No single value here: it is priced as a bet
7.1×if it works
68%kept if it fails
Multiples of the company's value when the bet was last struck, 3 Nov 2026.
We put no single value on a share here, because the business does not yet earn a lasting profit. Instead we ask what the shares pay if the plan works, and what is left if it fails.
The price and our view · 14 · How could we be wrong?
Financing, one tenant and two big builds
The financing slipsBiggest
Then bitcoin sales or new shares fund it.
One tenantWatch
About 97% of the contracted rent.
Delivering two buildsShowing now
Only one 25 MW hall delivered.
Who backs the debtUnknown
Lenders and terms not named.
Loans due in 2030 can turn into about 40 million shares if the stock rises.
The price and our view · 15 · How will we know?
February shows whether the build is funded
The AMD loan closed, mining profit of $40M or moreGood sign
Long-term loans cover 80% of the build, no new sharesWe turn positive
No lender named and weaker miningBad sign
FEB 202726
Fourth-quarter 2026 results, 26 February. Companies report every three months; each report is a test of the story.
Our view also changes on price alone: we turn positive if the company's value falls to 5 times its yearly sales, about where pure miners trade.
The price and our view · 16 · So, what do we think?
A bitcoin miner with signed AI leases, not yet financed
Speculationthe kind of bet this is
NeutralMedium conviction
Riot mines bitcoin at a loss once machines wear out, but it has signed data-centre leases whose rent should dwarf the price. What holds us back is the money to build. Neutral.
↑ ↓ to move · C for contents
What it does
More about the company
Who it is
Riot sells what its power can make. Most of it runs about 44 EH/s of bitcoin-mining machines at Rockdale, Corsicana and in Kentucky. A growing part goes into data-centre halls built for AI companies, which bring their own chips and pay rent for space, cooling and power.
The tenants' alternative is to find land and wait for a new grid connection in Texas, which the state now hands out in batches from 2028. Riot's sites already have theirs.
How it makes money
Today almost all money comes from bitcoin: Riot's machines win new coins and it sells them every month, so revenue rises and falls with the bitcoin price. Its engineering arm also sells switchgear and power rooms.
The new money is rent. A tenant signs for 10 or 20 years, pays a base rent that rises each year, and pays for its power at cost. Management expects about 80 to 90 cents of each rent dollar to be profit.
Growth and profit
What growth costs
Growth has not made Riot more profitable. Sales rose 72% in 2025 while the company swung to a large loss, and this year more sales came with less gross profit, because mining earns less per machine as the network grows. Rent should change that, but so far it is a sliver of revenue.
Its record
The numbers
Is it growing?Slow
Sales grew 6.1% over the twelve months to Sep 2026, slower than the 72% in the year to Dec 2025.
Is it profitable?Losing
Operating margin is −211%, down from −22% in the year to Dec 2023.
How steady is it?Swingy
Yearly sales growth has ranged from +8.3% to +17× over the last 5 years.
Does it earn good returns?Poor
Shareholders' money lost 51% a year, down from −1.9% in the year to Dec 2021.
How long can it keep going?Short
It used $901M of cash over the last twelve months, so the $669M it holds lasts about 0.7 years at that pace.
Is the balance sheet safe?Net cash
It holds $669M of cash against $657M of debt, $12.4M more cash than it owes.
Are shares being diluted?Diluting
The share count rose 303% in 4.8 years, and pay in shares costs 19% of sales.
Why it wins
The evidence
The advantage is power that is already connected. ERCOT, which runs the Texas grid, counts about 474 GW of requests from large users, mostly data centres, against 5.9 GW actually switched on, and now studies new requests in batches with allocations from 2028.
Riot's Rockdale and Corsicana sites run on existing agreements, which the chief executive says keeps them outside that queue. That is why two tenants signed 241 MW within seven months.
Who could beat it
The rivals in full
Riot is not alone. TeraWulf, Cipher, IREN, Core Scientific and Hut 8 converted their own mines and lease them to the same AI tenants, and Applied Digital builds about 150 MW campuses for hyperscalers. The tenants can also build their own once Texas hands out new power. The engineering arm competes with makers such as Powell Industries.
Each rival
Other converted miners: TeraWulf, Cipher, IREN, Core Scientific, Hut 8WULFCIFRIRENCORZHUT
Offer the same powered sites to the same AI tenants, several already leased to hyperscalers.
Sells the same custom switchgear, power control rooms and electrical houses that Riot's engineering arm builds, in competitive bids.
How big it could get
The market and who has signed
The market
ERCOT counts 29.9 GW of large users cleared to connect by 2027. Charged at the rent Riot's two leases imply, about $2.16M a megawatt a year, that would be roughly $65B a year, an upper bound since not all of it is data centres.
Riot's 241 MW is under 1% of that, so the market is not the limit; finding the power, the tenant and the money is.
Who has signed
AMD has signed for 50 MW over 10 years and the frontier lab for 191 MW over 20, both firm leases described in the filings. The lab is unnamed by Riot; Bloomberg reported Anthropic. Corsicana's whole site is under a letter of intent with one tenant, which binds nobody.
Who runs it
Leaders, pay and the cash
Who runs it
Jason Les has run Riot since 2021 and signed both leases this year. Directors and officers own about 7.8% of the company; their sales in the past year were all pre-arranged. Shareholders rejected the pay plan in 2025 after large one-time awards. This year's bonus rewards bitcoin output and profit against peers and data-centre revenue and profit; long-term awards ride on the share price against the market.
What they did with the money
Management sold 9,665 bitcoin in the first half of 2026 to pay for building and repaid a $200M loan in September. It sold no new shares in 2026, but stock awards still lifted the share count 8% in fifteen months.
The last report
The latest report
Riot signed a 910 MW lease for all of Corsicana worth about $28B
What it did to the thesis Mixed quarter
It took one half of the route to Attractive and left the other, the financing, open, so the view stays Neutral. The lease also makes one lab nearly all of the rent, which raises the stakes on the build.
The report
Riot signed a 15-year lease with a frontier AI lab for all of its Corsicana site, 910 MW worth about $28B of rent, with the first 400 MW due in September 2027. The tenant owns the computers; Riot builds the land and power for about $6M a megawatt.
The quarter itself was flat: sales of $181.4M, with mining down and engineering up, and a profit of one cent a share. The financing for the Rockdale hall was still not closed, and the segment profits await the full filing.
What's happening now
The background
The test now is financing: the $573M Rockdale loan falls due on 31 December with $20.8M drawn at the end of September, and the long-term lenders and the AMD loan were not yet announced as closed.
Where we disagree
Both sides in full
The market
A miner turning into an AI landlord: 21 of 22 analysts rate it a buy after two big leases.
We believe
The leases are real and nearly cover the price, but the building is not yet financed and mining burns cash meanwhile.
The argument
Bulls count the rent. The filings show it starts in December 2027, the large hall runs on a loan due this December, and the bitcoin paying the gap is being sold down. If the long-term lenders sign without new shares, the gap closes and we are too cautious.
What it's worth
How we value it
No fair value: the analysts' forecasts show no lasting operating profit after stock pay, so a value built on earnings would rest on a guess; the bet prices it instead.
The bet
The bet is the data-centre business. If all three signed leases are built and financed, it could be worth several times what today's price pays for the whole company, and more if AMD's options follow.
If the large leases fail, shareholders keep AMD's halls, the mining business, the engineering arm and the bitcoin, which on miners' prices is a large part of today's value.
The bet
Seen as a bet
The bet is the data-centre business. If all three signed leases are built and financed, it could be worth several times what today's price pays for the whole company, and more if AMD's options follow.
If the large leases fail, shareholders keep AMD's halls, the mining business, the engineering arm and the bitcoin, which on miners' prices is a large part of today's value.
What could go wrong
Every risk
The risks
The financing slips
If lenders lend less than planned, Riot must sell more bitcoin or issue shares to fund its part; the deck says lenders are more selective.
One tenant
The frontier lab is about 97% of the contracted rent across Rockdale and Corsicana; a delay or dispute with it moves almost the whole case.
Delivering two big builds
Riot has delivered one 25 MW hall; it must now deliver 191 MW at Rockdale and 910 MW at Corsicana on dates from September 2027.
More shares
Stock awards keep adding shares, and the 2030 notes become about 40 million shares above about $14.86.
Bitcoin falls
Mining revenue moves with bitcoin; a lower price means less cash from selling the 2,418 coins left.
Rivals with new power
Once Texas hands out new grid capacity from 2028, sites like Riot's become less scarce.
What we still do not know
Who backs the 191 MW project's long-term debt, and on what terms?
Whether the Corsicana project debt of billions is raised on the terms Riot shows, or the tenant funds it through rent credits at about 12% a year.
Whether the Corsicana tenant is the same lab as at Rockdale.
Whether any 2030 notes were converted into shares during Q3 2026.
What changes our view
Every route to a new view
Every route to a new view
→ Attractive
Long-term loans cover at least 80% of the 191 MW build, with no new shares sold.
→ Attractive
The company's value falls to 5 times its yearly sales, about where pure miners trade.
The next test
It supports the case if
Long-term financing of at least $1.5B for the 191 MW project is closed or committed, or the AMD term loan closed and mining segment gross profit is $40M or more, with Corsicana's financing process on schedule.
It pressures the case if
No long-term financing is in place, the bridge is extended with no lender named, mining segment gross profit is below $40M, or Riot says it will issue equity to fund an announced project.
We would also be wrong if
The bridge loan is repaid with new shares or extended past mid-2027.
The first 400 MW at Corsicana is not delivered by March 2028.
Shares outstanding pass 430 million before the lab's hall opens.
The verdict
Scores and how we weighed it
The scores
Growth
2 of 4
Business quality
2 of 4
Financial position
2 of 4
Execution record
3 of 4
Per share capture
2 of 4
Potential
3 of 4
Risk profile
2 of 4
Valuation
3 of 4
Evidence quality
3 of 4
How we weighed it
ValueMixed
No fair value is drawn: the forecasts show no lasting profit after stock pay, so the bet prices it.
BusinessNegative
A mixed business near the weak end: mining loses money after wear.
GrowthPositive
Signed leases give large rent growth once built.
RisksNegative
The financing may slip, one lab is nearly all of the rent, two large builds must be delivered and more shares may come.
RivalsMixed
Priced between pure miners and converted landlords, which fits its stage.
The groupMixed
AI hosting names move together on AI spending and funding news.
Latest newsMixed
The last report took one half of the route to Attractive and left the financing open.