Cipher is a bitcoin miner turning into a data-centre landlord
Texas
where its sites and grid connections are
Whole buildings
each rented to one tenant
Ten years+
the length of its leases
Cipher finds land with a grid connection, builds the shell, power and cooling, and rents the whole building for ten years or more. The tenant brings its own computers.
The company · 2 · What exactly does it sell?
Today nearly all sales still come from mining bitcoin
Each $1 of filed sales
$20.8 millionfrom mining bitcoin, third quarter
$5.9 millionof rent from the first data hall
Mining is being wound down. Rent, which started in August 2026, is the business Cipher is becoming.
The company · 3 · How does it make money?
Rent from long leases, once the buildings are finished
About $955 millionof yearly rent once all is built
About $864 millionof it left after running costs
August 2026when the first hall started paying
The three signed leases, with Amazon, a Google-backed tenant and a large cloud company, add up to that rent only if every building is finished.
Is it a good business? · 4 · What gives it an edge?
What it holds is a place in the power queue
438,000 MW
of requests to join the Texas grid
700 MW
approved and largely built at its three leased sites
Power is the scarce thing. That is why big tenants signed with a company that had never finished a data hall. It wins on speed, not on price.
Is it a good business? · 5 · What is the catch?
The buyers build their own, and rivals sell the same
Almost 60%of space the largest buyers build themselves
TeraWulfrents to Cipher's own tenant
Applied Digitalsigns 15-year leases with the same buyers
Cipher competes on speed and long terms, not on lower rent. Other former miners chase the same tenants.
Is it a good business? · 6 · What does its record show?
Mining pays today; rent is just starting
Sales, $M
3.0
126.8
151.3
223.9
146.1
Dec 2022Dec 2023Dec 2024Dec 2025last 12 mo
Sales$223.9Msales in 2025, nearly all mining
Mining$20.8 millionmining in the third quarter, being wound down
Rent$5.9 millionthe first quarter of rent
The sales record says little about the future, because the business is switching from mining to renting.
Is it a good business? · 7 · How much room is there to grow?
Demand doubled, but Texas's grid is the limit
25 GWtaken up by North American data centres, first half of 2026
95%of what is being built is spoken for in advance
Texas has paused its grid queue for an audit, and there is no date for the next study, which holds back Cipher's sites beyond the signed three.
Is it a good business? · 8 · Who is in charge?
Paid on megawatts signed, not rent collected
Since 2021Tyler Page, founder and chief executive
About 3%of the shares owned by insiders
37 salesby insiders in a year, no purchases
The largest holder, Bitfury's group, has been selling. Nothing in pay rewards value per share.
The story right now · 9 · Why do tech giants rent buildings?
Tech giants need powered buildings faster than they can build
Under 1,500 MWfree in the main US markets in mid-2026, about six months of demand
Amazonone of Cipher's three tenants
AI computers need buildings with huge power supplies now. Building their own takes years, so tech companies rent from landlords with a grid connection.
The story right now · 10 · How does a landlord pay to build?
New buildings are paid for partly with new shares
A tenant signs a leaseRent starts when the hall is done.
Cipher borrows to build$850 million of notes in October.
Some debt can become sharesAbout 205 million possible new shares.
Each share owns lessUnless rent grows faster.
The signed rent is real, but new shares spread it over more owners. That is why growth beyond the signed sites can cost shareholders.
The story right now · 11 · What changed lately?
The first rent arrived; no new lease did
$26.7 millionthird-quarter sales
51 MWready for service at Barber Lake
$127 milliona paper gain on Google's warrants
477 MWoffered for 2027, in talks since May, none signed
Mixed quarter
The shares more than halved in a month. Barber Lake, the first campus, slipped with a bill attached: $359.3 million on Cipher.
The story right now · 12 · What is everyone arguing about?
Is the pipeline worth what analysts think?
Many investors think
A large AI landlord with a long pipeline
We think
Signed rent is real; the pipeline is slower and costlier
Every analyst says buy. We are wrong if Barber Lake pays fully by March 2027 at no extra cost.
The price and our view · 13 · What is a share worth?
No single value here: it is priced as a bet
4.8×if it works
4%kept if it fails
Multiples of the company's value when the bet was last struck, 6 Nov 2026.
We put no single value on a share here, because the business does not yet earn a lasting profit. Instead we ask what the shares pay if the plan works, and what is left if it fails.
The price and our view · 14 · How could we be wrong?
Slips, cancellable leases and new shares
A slip becomes a patternBiggest
Barber Lake moved, with $359.3 million on Cipher.
Your slice can shrinkShowing now
Over 200 million possible new shares.
Texas holds the pipelineWatch
The grid queue is under audit.
Rent per megawattUnknown
Only the totals are public.
A tenant may end a lease after a serious delay, and that would not trigger the guarantee behind it.
The price and our view · 15 · How will we know?
February shows whether Barber Lake pays on budget
A signed lease on the 477 megawatts ready for 2027Good sign
Every Barber Lake hall paying by March 2027, no extra costWe turn positive
Barber Lake slips past June 2027 or costs moreWe turn negative
FEB 202723
Fourth-quarter 2026 results and the annual report. Companies report every three months; each report is a test of the story.
Our view moves on these business events, not on a price line, since we put no single value on a share here.
The price and our view · 16 · So, what do we think?
Signed rent from Amazon, and a pipeline nobody has signed
Speculationthe kind of bet this is
NeutralMedium conviction
Cipher, a former bitcoin miner, rents Texas data centres whole on long leases. Its first campus slipped with a bill attached. As a bet, the price pays well if new sites are leased and leaves almost nothing if not. Neutral.
↑ ↓ to move · C for contents
What it does
More about the company
Who it is
Cipher Digital finds land with a grid connection, builds a data centre on it, and rents the whole building to one tenant for ten years or more. The tenant brings its own computers; Cipher supplies the power, the cooling and the shell.
Buyers come to it because powered space is scarce: under 1,500 megawatts was free across the main U.S. markets in mid-2026, about six months of demand. The alternative is to build it themselves, which the largest buyers do for almost 60% of their space.
How it makes money
Today almost all revenue still comes from mining bitcoin at one Texas site, Odessa: $20.8 million in the third quarter of 2026, against $5.9 million of rent from the first data hall.
The new money is rent. The three leases add up to about $955 million a year once every building is finished, of which about $864 million should be left after running costs. The first hall started paying rent in August 2026.
Growth and profit
What growth costs
It is too early to say whether growth will make Cipher more profitable. Today's sales come from bitcoin mining, which is shrinking, while the rent has barely started, so costs look huge against sales. Office costs and pay in shares are rising; the bet is that they stay small next to the rent once all three campuses pay.
Its record
The numbers
Is it growing?Shrinking
Sales fell 29% over the twelve months to Sep 2026, slower than the 48% in the year to Dec 2025.
Is it profitable?Losing
Operating margin is −387%, down from −16% in the year to Dec 2023.
Does growth pay off?Unclear
Running costs take 438¢ of each sales dollar, down from 1308¢ in the year to Dec 2022.
Does it earn good returns?Poor
Shareholders' money lost 157% a year, down from −11% in the year to Dec 2022.
How long can it keep going?Short
It used $3.08B of cash over the last twelve months, so the $656M it holds lasts about 0.2 years at that pace.
Is the balance sheet safe?Strained
It owes $5.02B more than the cash it holds, and its operations bring in no cash to repay it.
Are shares being diluted?Diluting
The share count rose 77% in 3.8 years, and pay in shares costs 75% of sales.
Why it wins
The evidence
What Cipher holds is a place in line. Texas's grid operator is tracking more than 438,000 megawatts of requests to connect, and Cipher's three leased sites already have their connections approved.
That is why Amazon, a Google-backed tenant and a large cloud company signed long leases with a company that had never finished a data hall, and why the Barber Lake tenant has now committed to twenty years. It buys a seat at the table, not pricing power.
Who could beat it
The rivals in full
The biggest buyers mostly build their own data centres, and rivals sell the same thing: TeraWulf rents space to Fluidstack, Cipher's own tenant, and Applied Digital signs 15-year leases with the same kind of buyer. Cipher's answer is speed and long terms, not lower rent.
Each rival
Amazon, Google, Microsoft and Meta building their own capacityAMZNGOOGLMSFTMETA
The buyer stops leasing a powered shell and builds the substation, hall and cooling itself on its own balance sheet, as it does for almost 60% of its capacity.
The same product to the same buyer: approximately 15-year leases to investment-grade hyperscalers on a standardised design, already billing on its first campus.
MARA Holdings, Riot Platforms and the other listed miners Cipher used to name as its competitorsMARARIOT
The same fixed issuance of bitcoin: every exahash a rival adds lowers Odessa's share of each day's reward, whatever Cipher's power costs.
How big it could get
The market and who has signed
The market
Demand is running hot. North American data centres absorbed 25 gigawatts in the first half of 2026, double a year earlier, and 95% of what is being built was spoken for in advance.
But in Texas the limit is now the grid, not the buyers: the grid operator's first group of applicants is being audited, with a report due in December, and no date yet for the study after it.
Who has signed
Amazon signed for 300 megawatts at Black Pearl for 15 years, with Amazon's parent guaranteeing the rent. Fluidstack took 300 megawatts at Barber Lake for 10 years, with Google backing part of it, and an unnamed AI lab committed to 10 more after that. A third large cloud company signed for 100 megawatts at Stingray for 15 years.
Who runs it
Leaders, pay and the cash
Who runs it
Tyler Page founded Cipher in 2021 and still runs it; a former banker became finance chief in October 2025. Insiders own about 3%, most of it Page's, while the largest holder, Bitfury's group, has been selling. Bonuses ride on megawatts powered, built and signed; the share awards ride on the stock price. Nothing pays on rent actually collected or on value per share.
The last report
The latest report
Cipher booked its first data centre rent; Barber Lake's first 51 megawatts are ready
What it did to the thesis Mixed quarter
The first rent and the ready notice fit the case, but talks are not leases, the overrun stands and the filing is not out, so the view stays Neutral.
The report
The third-quarter 2026 report, out on 2 November, showed a business changing lives. Revenue was $26.7 million, $20.8 million from mining and $5.9 million from the first rent at Black Pearl, and net income of $31.6 million came from a $127 million accounting gain on Google's warrants, not from operations.
On the call management said it had told the Barber Lake tenant the first 51 megawatts were ready for service and that it was in advanced talks on about a gigawatt of new leases. None was signed. Extra Barber Lake cost was blamed on tenant design changes and a tight labour market.
What's happening now
The background
The 10-Q matched the share count and cost cap the figures use. The next test is the fourth-quarter report, due about 23 February: whether Barber Lake rent has started within the $359.3 million, and whether any of the 477 megawatts ready for 2027 is leased.
Where we disagree
Both sides in full
The market
Every analyst rates it a buy, with targets near twice the price: they see a large AI landlord with a long pipeline.
We believe
The signed rent is worth about today's price; the pipeline is real but slower, costlier and paid for partly in new shares.
The argument
The difference is in the filings: the first campus slipped with a bill attached, Google's warrants carry a top-up if the price is low, and about 205 million possible new shares sit above today's count.
We would be wrong if Barber Lake is fully paying rent by March 2027 with no further cost, and the 477 megawatts are leased at better rent than the first three.
What it's worth
How we value it
No fair value: the analysts' forecasts show no lasting operating profit after stock pay, so a value built on earnings would rest on a guess; the bet prices it instead.
The bet
This is a bet that Cipher leases the sites it says are ready for 2027 on the same terms as its first three, without new shares. Even then, at a fair value for the rent, the gain is limited by the extra debt and shares that new leases bring.
If leasing fails, a tenant walks away after a delay, or the pipeline never signs, little is left for shareholders: the lenders and the convertible notes are paid first, and the mining site's cheap power ends in 2027.
The bet
Seen as a bet
This is a bet that Cipher leases the sites it says are ready for 2027 on the same terms as its first three, without new shares. Even then, at a fair value for the rent, the gain is limited by the extra debt and shares that new leases bring.
If leasing fails, a tenant walks away after a delay, or the pipeline never signs, little is left for shareholders: the lenders and the convertible notes are paid first, and the mining site's cheap power ends in 2027.
What could go wrong
Every risk
The risks
A slip becomes a pattern
Barber Lake was called on schedule in February and May, then moved with $359.3 million of cost on Cipher.
A late campus can be cancelled
Tenants may end a lease after a serious delay, and that would not trigger the guarantee behind it.
Texas holds the pipeline
Every Texas site beyond the 700 megawatts waits on a grid queue now under audit, and the state has stopped data-centre permits.
Your slice can shrink
Over 200 million possible new shares could join 414 million, and Google's warrant top-up grows as the price falls.
Insiders sell, none buy
Insiders sold 37 times and bought never in a year; the founding holder sold about 7.9 million shares at its own choice.
What we still do not know
What rent each lease pays per unit of power; only the totals are public.
How much of the Barber Lake lease Google still guarantees, and whether that covers the extra ten years.
Fluidstack's own finances: it is private and publishes no accounts.
Which Cipher sites Texas's grid operator has provisionally let into its first group; only totals have been published.
What changes our view
Every route to a new view
Every route to a new view
→ Attractive
Every Barber Lake hall is paying rent by 31 March 2027, with no extra cost to Cipher beyond the agreed $359.3 million. A lease signed on some of the 477 megawatts, at rent per megawatt as good as the first three, without new shares.
→ Unattractive
Barber Lake slips past June 2027 or needs more than $359.3 million, or another campus runs over budget. Any tenant ends its lease, or a guarantor refuses to pay, at any campus.
The next test
It supports the case if
Barber Lake rent has started in the fourth quarter with no cost beyond $359.3M and the last halls dated by 31 March 2027, and a lease is signed on some of the 477 MW without new common equity.
It pressures the case if
Barber Lake's first rent or its last halls move later, any further cost falls on Cipher, the 477 MW is still unsigned with nothing dated, or cash overhead keeps rising above the third quarter's $153M a year.
We would also be wrong if
None of the 477 megawatts offered for 2027 is leased by the end of 2027.
The verdict
Scores and how we weighed it
The scores
Growth
1 of 4
Business quality
3 of 4
Financial position
2 of 4
Execution record
2 of 4
Per share capture
2 of 4
Potential
3 of 4
Risk profile
2 of 4
Valuation
3 of 4
Evidence quality
3 of 4
How we weighed it
ValueMixed
No fair value is drawn: the forecasts show no lasting profit after stock pay, so the bet prices it.
BusinessNegative
A weak business for now: the first campus slipped and the execution record is poor.
GrowthMixed
Signed leases give growth, but anything beyond them waits on new tenants and grid access.
RisksNegative
A further slip could let a tenant cancel, Texas grid queues are under review, and new shares may dilute holders.
RivalsMixed
No filed rival compares cleanly; its own past ratios describe a miner.
The groupMixed
AI hosting names move together on AI spending and funding news.
Latest newsMixed
The first rent and the ready notice fit the case, but talks are not leases and the overrun stands.
In plain words
Selling new shares
A company can raise money by creating new shares and selling them. The company gets cash, but the same business is now divided into more slices, so each existing share owns a little less of it. This is called dilution.