A former bitcoin miner in New York that now builds data centres and rents them, whole, to AI companies on long leases, with Google standing behind most of the rent.
The scores
Growth3/4 ↑
Lease revenue went from $7.2M to $63.0M a quarter in a year and total revenue rose 51% in Q3; mining is shrinking.
Business quality3/4 →
Connected power won ten- and twenty-year leases with Google's credit, but rivals sign the same tenants and buyers build most capacity themselves.
Financial position2/4 →
$5.7B of notes against negative EBITDA; Justified's debt is still to raise and Muskie is unfunded, though $2.4B of cash covers what is signed.
Execution record3/4 →
CB-3 delivered and Lake Mariner near $8.9M per MW inside guidance; CB-5 moved from 2026 into early 2027 under amended leases.
Per share capture2/4 ↓
Shares up 19% in ten months, about 110M more potential shares, stock pay above revenue and a related-party trust on capital spending.
Potential3/4 →
Bounded and committed: 839 MW signed with about $27B of rent. Not a 4: Muskie and the pipeline have power but no tenant.
Risk profile2/4 →
Two tenants tied to one AI lab hold 93% of contracted capacity, and Justified's build and financing carry most of the value.
Valuation3/4 ↑
About 9 times contracted NOI with Justified financed, under the ten we treat as fair for Google-backed rent. Not a 4: most halls unbuilt.
Evidence quality3/4 →
Leases, debt, warrants and the power approvals are filed or regulator facts; the NOI and contracted totals are presentation figures.
If it works 2.2× · if it fails you keep about 1%.
The Verdict
We rate TeraWulf Neutral. A former bitcoin miner, it now builds data centres and rents them whole to Fluidstack, Core42 and Anthropic on long leases, with Google standing behind most of the rent. The business is mixed for now: the first campus bills and is on budget, but one building slipped, the second campus is unbuilt and pay in shares exceeded sales. After the shares halved, the price is about what the signed rent supports once the Kentucky campus's debt is counted, so it is fair rather than cheap. As a bet it is speculative: much higher if Muskie leases, and the lenders come first if not.
The long caseAI needs new buildings with power already connected, and TeraWulf holds sites the grid has approved; filling them on long Google-backed leases turns that power into steady rent.
How we weighed it
The price against our value
Cuts both ways
No fair value is drawn: forecasts show no lasting profit after stock pay. The signed rent is priced close to what it is worth once the Kentucky debt is counted.
The business
Cuts both ways
Mixed
Connected power and Google-backed tenants, but the same tenants sign with rivals and the record is short.
Growth against what the price assumes
In its favour
Rent is rising fast as Lake Mariner's halls open, and Kentucky doubles it from late in the coming year if built on time.
What could go wrong
Against it
Most rent rests on one AI lab with Google behind it, the second campus is unbuilt, and new shares may fund the next.
Against competitors
Cuts both ways
No filed rival compares cleanly; Cipher and Applied Digital offer the same product to the same buyers.
How its group is behaving
Cuts both ways
AI hosting names move together on AI spending and credit news, and the group has fallen hard since summer.
The latest news and report
In its favour
Google's support for the Anthropic lease and Fluor's contract made the second campus financeable; the quarter's rent rose.
The evidence under this - 10 claims
The backstop starts only at each lease's commencement and is limited to 'certain obligations'; the size of the termination fee is not filed.
Before the last hall commences there is no Google support, and Google's termination fee falls over time and is capped by the project financing; Google may then take equity in the landlord subsidiary.
In February the full-year release described Fluidstack's capacity as commencing in 2026; CB-5 now falls into 2027 under amended leases (C23).
The amendment also raised the contracted load from 162 MW to 168 MW and added rent for tenant-requested scope, so the move was negotiated rather than missed.
The NOI is management's average over the lease life, not today's, and Justified's project debt is not yet in the net debt (C17).
Management says the equity required is already in hand, so the rest is debt on Google-supported credit; the range rests on its own $10-12M per MW.
The second 500 MW needs a new 760 MW gas plant and Commission approval expected only by mid-2027.
About $300M of the parent's cash collateralises letters of credit for Muskie, and the secured notes sit at Wulf Compute, ahead of the common on Lake Mariner's cash flow.
The company
TeraWulf finds sites with big grid connections, builds data centres on them and rents each building to one tenant for ten years or more. The tenant brings its own computers; TeraWulf supplies the power, the cooling and the shell.
Buyers come to it because powered space is scarce: under 1,500 megawatts was free across the main U.S. markets in mid-2026, about six months of demand. The alternative is to build it themselves, which the largest buyers do for almost 60% of their space.
The evidence under this - 3 claims
How it makes money
Rent is now most of the money. Third-quarter 2026 revenue was $76.2 million: $63.0 million from leasing, $46.0 million of it rent, and $13.2 million from mining bitcoin, which is being shut down hall by hall.
Only 102 of the 839 leased megawatts were paying rent at the end of September. Management says the leases total about $27 billion, about $1.5 billion a year of profit after running costs once all is built.
The evidence under this - 4 claims
In February the full-year release described Fluidstack's capacity as commencing in 2026; CB-5 now falls into 2027 under amended leases (C23).
No lessor payment schedule in the filings sums to $27B; the figures are presentation numbers, and NOI is a non-GAAP measure whose definition the deck does not reconcile.
Where the money comes from, stream by stream
| Stream | Share of sales (nine months to 30 September 2026) | How it earns it |
|---|---|---|
| HPC data centre leasing | 75% | Rent, tenant fit-out and power pass-through on ten-year leases to Core42 and Fluidstack at Lake Mariner; rent alone was $46.0M of the third quarter's $63.0M. |
| Bitcoin mining | 25% | Mining bitcoin for the Foundry USA pool on Lake Mariner's remaining 145 MW of miners, paid in bitcoin and sold; shrinking as buildings convert. |
Who runs it
Paul Prager co-founded TeraWulf and has run it since 2021; the finance chief has been in post since 2022. Insiders own about 16%. The chief executive was paid $39.4 million in 2025, much of it on share-price targets of about $6. A trust for staff of Prager's private company takes 2% of data-centre spending, and the New York land is leased from a company he controls.
The evidence under this - 4 claims
Why it wins, and who could beat it
Why customers come back
What TeraWulf holds is power already connected. Lake Mariner has an approved plan to grow to about 750 megawatts, and the Kentucky campus sits on the wires of a closed aluminium smelter, with the state regulator's approval for 482 megawatts.
That is why Google-backed tenants and Anthropic signed long leases with a company that finished its first data hall only in 2025. It buys a place in line, not pricing power: nobody publishes what each megawatt rents for.
The evidence under this - 5 claims
Rivals hold powered sites too and sign the same tenants (C39, C40), and the buyers build most of their own capacity (C36).
Residents opposed the agreement at the July hearing, and the contract lets the utility curtail the campus in a MISO emergency.
Both totals are presentation figures (C03), and Justified's rent per MW is higher than Lake Mariner's, so a new lease could land anywhere in that range.
The threat
The biggest buyers mostly build their own data centres, and rivals sell the same thing: Cipher rents halls to Fluidstack, TeraWulf's own main tenant, and Applied Digital signs 15-year leases with the same kind of buyer. TeraWulf's answer is speed, long terms and Google's credit, not lower rent.
The evidence under this - 4 claims
Before the last hall commences there is no Google support, and Google's termination fee falls over time and is capped by the project financing; Google may then take equity in the landlord subsidiary.
The rivals: AMZN, GOOGL, MSFT, META, CIFR, APLD, MARA, RIOT, CORZ.
Who else does this, rival by rival
| Ticker | Rival | Where it competes | How far along | Priced against it |
|---|---|---|---|---|
| AMZN · GOOGL · MSFT · META | Amazon, Google, Microsoft and Meta building their own capacityPriced against it: Different product | HPC data center leasing | On sale | Different product |
| CIFR | Cipher Digital Inc.Priced against it: One segment only | HPC data center leasing | On sale | One segment only |
| APLD | Applied Digital CorporationPriced against it: Same product | HPC data center leasing | On sale | Same product |
| MARA · RIOT | MARA Holdings, Riot Platforms and the other listed bitcoin minersPriced against it: Not checked | Bitcoin mining | On sale | Not checked |
| CORZ | Core ScientificPriced against it: One segment only | - | On sale | One segment only |
How big it could get
How big this could get
Demand is running hot. North American data centres absorbed 25 gigawatts in the first half of 2026, double a year earlier, and 95% of what is being built was spoken for in advance.
The government's energy statisticians expect servers to take a growing share of the power used by commercial buildings for decades. The limit on TeraWulf is power it can deliver and money to build, not tenants.
The evidence under this - 3 claims
Who has signed
Fluidstack signed for 378 megawatts at Lake Mariner for 10 years, with Google promising to pay if Fluidstack fails. Core42 took 60 megawatts there. Anthropic signed for about 401 megawatts in Kentucky for 20 years, with Google's support starting once the last hall opens. Some New York halls moved into early 2027.
The evidence under this - 4 claims
The backstop starts only at each lease's commencement and is limited to 'certain obligations'; the size of the termination fee is not filed.
Before the last hall commences there is no Google support, and Google's termination fee falls over time and is capped by the project financing; Google may then take equity in the landlord subsidiary.
The amendment also raised the contracted load from 162 MW to 168 MW and added rent for tenant-requested scope, so the move was negotiated rather than missed.
The results
The numbers
Sales grew 14% over the twelve months to Sep 2026, slower than the 20% in the year to Dec 2025.
Operating margin is −250%, down from −42% in the year to Dec 2023.
Running costs take 276¢ of each sales dollar, up from 96¢ in the year to Dec 2023.
Shareholders' money lost 140% a year, down from −33% in the year to Dec 2023.
It used $3.11B of cash over the last twelve months, so the $1.60B it holds lasts about 0.5 years at that pace.
The share count rose 173% in 2.8 years, and pay in shares costs 116% of sales.
All the numbers
Filed figures from the company's 10-K and 10-Q, read 2026-11-17. Fiscal years end in December.
| Dec 2023 | Dec 2024 | Dec 2025 | 12 mo to Sep 2026 | |
|---|---|---|---|---|
| Size and growth | ||||
| Sales | $69.2M | $140M | $168M | $191M |
| Sales growth | - | +102% | +20% | +14% |
| Profit | ||||
| Gross margin | 53% | 50% | 39% | 26% |
| Operating margin | −42% | −54% | −111% | −250% |
| Net margin | −106% | −52% | −393% | −411% |
| What growth costs, per sales dollar | ||||
| Pay in shares | 8.5% | 22% | 30% | 116% |
| Capital spending | 109% | 191% | 629% | 15× |
| Cash | ||||
| Cash from operations | $4.26M | −$24.4M | −$123M | −$267M |
| Free cash flow | −$70.9M | −$292M | −$1.18B | −$3.11B |
| Balance sheet | ||||
| Cash and short-term investments | $54.4M | $274M | $3.27B | $1.60B |
| Debt | $124M | $0 | $3.10B | - |
| Net cash | −$69.1M | $274M | $168M | - |
| Returns and shares | ||||
| Shares (diluted) | 210M | 351M | 398M | 574M |
What growth costs
It is too early to say whether growth will make TeraWulf more profitable. Building costs billions while rent has barely started, and pay in shares runs above sales. Management says the leasing profit will reach about 85% of rent once the halls fill; today it is 17%.
The evidence under this - 4 claims
The 83% is management's adjustment and removes $18M of development and $11.1M of pre-revenue costs that recur while the company keeps building.
No lessor payment schedule in the filings sums to $27B; the figures are presentation numbers, and NOI is a non-GAAP measure whose definition the deck does not reconcile.
The last report (6 Nov)
Quarter ended September 2026, filed figures.
The third-quarter 2026 report, out on 6 November, showed leasing taking over. Revenue was $76.2 million, $63.0 million of it from leasing. The business still lost $88.2 million before interest, and net income of $709.9 million came from a $728.4 million accounting gain on Google's warrants, not from operations.
On the call management said the Lake Mariner build cost about $8.9 million a megawatt, inside its guidance, and that cash on hand finishes the New York campus and pays its part of Kentucky without selling shares. Pay in shares was $215.4 million in nine months, more than revenue.
What it did to the thesisThe rent is real and the build is on budget, but one building slipped, stock pay stays heavy and Muskie has no tenant, so the case holds without getting stronger.
The quarter in detail
Sales growth from the previous quarter, filed figures.
Earnings per share $-0.03 against $-0.18 expected; $-0.03 as filed, with no adjustments.
The evidence under this - 5 claims
The figure is management's, on the call; the 10-Q gives construction payables and commitments but no cost per MW.
Justified's project debt has not been raised; the plan rests on a financing not yet priced, and the April offering came five months after a similar assurance.
What management did with the money
Insiders in 2026Q3: 12 purchases and 9 sales, from their Form 4 filings.
The price, and where we disagree
In short. Fair. The price pays about what the signed rent is worth once the Kentucky debt is counted, while new shares, heavy pay in shares and an unbuilt campus keep it from cheap.
The shares have fallen from $29.84 at the top to $11.88, about 44% in the last six months, as AI data-centre stocks sold off and the share count kept growing. In early November Google agreed to stand behind the Anthropic lease, Fluor signed to build the Kentucky campus, and Kentucky's utility doubled Muskie's power to a gigawatt, still with no tenant.
The next test is the fourth-quarter report, due about 25 February 2027: whether the fourth building is paying rent, the fifth is on course for March, and the Kentucky campus's debt is raised without new shares.
The evidence under this - 7 claims
Before the last hall commences there is no Google support, and Google's termination fee falls over time and is capped by the project financing; Google may then take equity in the landlord subsidiary.
The guaranteed maximum price is 'being established' rather than set, and other builders in the sector have reported overruns, which an analyst raised on the call.
The second 500 MW needs a new 760 MW gas plant and Commission approval expected only by mid-2027.
In February the full-year release described Fluidstack's capacity as commencing in 2026; CB-5 now falls into 2027 under amended leases (C23).
Justified's project debt has not been raised; the plan rests on a financing not yet priced, and the April offering came five months after a similar assurance.
How we value it
No fair value: the analysts' forecasts show no lasting operating profit after stock pay, so a value built on earnings would rest on a guess; the bet prices it instead.
How we read the multiple
Count what a buyer of the whole company takes on: the shares and the debt, less the cash. About $9.4 billion.
Against about $1.5 billion of yearly rent profit once everything is built, that is about 6.2 times. But the Kentucky campus still needs $3.5 to $4.3 billion, mostly borrowed; counting that, it is about 8.6 to 9.1 times.
Nothing is paid for Muskie or the rest of the pipeline. Google's warrants and unvested awards would add about 110 million shares to the 501.5 million already out.
Against its own history. Its own past ratios describe a bitcoin miner, not a landlord, so this comparison carries little weight.
The evidence under this - 5 claims
The NOI is management's average over the lease life, not today's, and Justified's project debt is not yet in the net debt (C17).
Management says the equity required is already in hand, so the rest is debt on Google-supported credit; the range rests on its own $10-12M per MW.
No lessor payment schedule in the filings sums to $27B; the figures are presentation numbers, and NOI is a non-GAAP measure whose definition the deck does not reconcile.
About $300M of the parent's cash collateralises letters of credit for Muskie, and the secured notes sit at Wulf Compute, ahead of the common on Lake Mariner's cash flow.
Priced against its rivals
Only Applied Digital sells the same thing to the same buyers as a large part of what it does. A price comparison needs at least two, so the price is judged against its own history instead.
Also checked and set aside: IREN (a substitute, not the same product); Digital Realty Trust (a substitute, not the same product).
The bet: what it pays if it works
This is a bet that TeraWulf leases Muskie's first phase on the same terms as its first three leases, without new shares. Then the company could be worth about twice today's price, though new leases bring new debt.
If leasing fails, a tenant walks before Google's support starts, or the Kentucky campus is stranded half built, little is left for shareholders: the noteholders are paid first, and mining is being shut down.
| HPC data center leasing revenue in two to three years | Leased critical IT megawatts needed | At the stated multiple |
|---|---|---|
| $800.00M | about 383 at 100% kept | 0.7× |
| $2.59B (the big win) | about 1.2K at 100% kept | 2.2× |
| $3.76B | about 1.8K at 100% kept | 3.2× |
To pay 2× (a Fair bet) it would need about $2.37B of HPC data center leasing revenue (about 1.1K leased critical IT megawatts); to pay 5× (a Cheap bet), about $5.95B of HPC data center leasing revenue (about 2.8K leased critical IT megawatts), at the same multiple.
Each row is HPC data center leasing alone, plus the rest of the company (Bitcoin mining) counted at about $52.00M.
The steps it has to take
- Done 839 MW leased to Core42, a Google-backed Fluidstack and Anthropic
- Done Lake Mariner's notes raised and CB-3 billing
- Done Google credit support and Fluor contract for Justified
- Slipped CB-4 and CB-5 paying rent: Lake Mariner fully billing due 2027-03
- In progress Justified project debt raised without new shares due 2027-06
- In progress Kentucky PSC approves Muskie's 1 GW agreement due 2027-06
- Not started A Muskie lease signed due 2027-12
- In progress Justified's first halls delivered to Anthropic due 2027-12
The detail behind the label
The evidence under this - 6 claims
The second 500 MW needs a new 760 MW gas plant and Commission approval expected only by mid-2027.
Nothing has been signed since the Anthropic lease in July; the pipeline includes an unclosed acquisition and an unpermitted site (Lake Hawkeye).
About $300M of the parent's cash collateralises letters of credit for Muskie, and the secured notes sit at Wulf Compute, ahead of the common on Lake Mariner's cash flow.
Before the last hall commences there is no Google support, and Google's termination fee falls over time and is capped by the project financing; Google may then take equity in the landlord subsidiary.
Where we disagree with the market
Every analyst rates it a buy, with targets near twice the price: they see a large AI landlord with a long pipeline.
The signed rent is worth about today's price; the pipeline is real but unsigned, and paying for it may take new shares.
The difference is in the filings: 19% more shares in ten months, pay in shares above revenue, one building already moved later, and most of the rent sitting on a campus not yet built.
We would be wrong if the Kentucky debt is raised on Google's support with no new shares and Muskie leases to a strong tenant without new equity.
What analysts say, and the evidence
The evidence under this - 6 claims
The NOI is management's average over the lease life, not today's, and Justified's project debt is not yet in the net debt (C17).
The amendment also raised the contracted load from 162 MW to 168 MW and added rent for tenant-requested scope, so the move was negotiated rather than missed.
Management says the equity required is already in hand, so the rest is debt on Google-supported credit; the range rests on its own $10-12M per MW.
What could go wrong, and how we would know
The risks
- A slip becomes a pattern. Lake Mariner's tenant space was due in 2026 and was moved hall by hall into early 2027.
- Two tenants carry the rent. Fluidstack and Anthropic hold almost all of it, and Anthropic is not yet rated investment grade.
- Your slice can shrink. Shares rose 19% this year, and Google's warrants, unvested awards and convertible notes sit above today's count.
- Muskie brings bills first. TeraWulf pays $100 million of bill credits and a gas plant's financing cost before any tenant signs.
- Insiders mostly sell. Insiders sold 17 times in a year, nine by choice, including the finance chief at $16.14.
The evidence under this - 6 claims
The amendment also raised the contracted load from 162 MW to 168 MW and added rent for tenant-requested scope, so the move was negotiated rather than missed.
What we still do not know
- What rent each lease pays per unit of power; only the totals are public.
- What Justified will finally cost: Fluor's maximum price is still being set.
- Fluidstack's and Anthropic's own finances in detail: neither publishes full accounts.
- Who, if anyone, will lease Muskie, and on what terms.
The evidence under this - 4 claims
Both totals are presentation figures (C03), and Justified's rent per MW is higher than Lake Mariner's, so a new lease could land anywhere in that range.
The guaranteed maximum price is 'being established' rather than set, and other builders in the sector have reported overruns, which an analyst raised on the call.
The second 500 MW needs a new 760 MW gas plant and Commission approval expected only by mid-2027.
What would change our view
- Neutral→AttractiveJustified funded cleanly and Muskie leased
It needs all of:
- ○The Kentucky campus's debt raised on Google's support with no new shares, and the fifth New York building paying rent by 31 March 2027.watched as it happens
- ○A Muskie lease signed with a strong tenant or backer, paid for without new shares.watched as it happens
- Neutral→UnattractiveThe build, the funding or a tenant gives way
It needs any of:
- ○Kentucky slips past mid-2028 or costs over $12 million a megawatt, or the fifth New York building is not paying rent by June 2027.watched as it happens
- ○New shares sold to pay for Kentucky or Muskie.watched as it happens
- ○A tenant stops paying, or Google's promise is called on, at either campus.watched as it happens
We would also be wrong if
- Muskie still has no tenant at the end of 2027.
What is coming
- 31 December 2026 CB-4's four halls all paying rent at Lake Mariner: Whether the amended schedule holds; it also moves the revolver to $400M and frees the parent cash backing Muskie's letters of credit.
Every dated event ahead
- 31 December 2026 CB-4's four halls all paying rent at Lake Mariner: Whether the amended schedule holds; it also moves the revolver to $400M and frees the parent cash backing Muskie's letters of credit.
- 25 February 2027 Q4 2026 results and the 2026 annual report: CB-4 rent in the quarter, CB-5 on course, the Abernathy $150M received, Justified's financing and any Muskie lease.
- 31 March 2027 CB-5 commences, Lake Mariner fully billing: About $700M of annualised lease revenue at Lake Mariner if management's run rate holds.
- 30 June 2027 Kentucky PSC decision on the 1 GW Muskie agreement: Whether Muskie's second 500 MW and the Big Sandy plant go ahead on the terms TeraWulf pays for.
- 31 December 2027 First Justified halls ready for Anthropic: Whether Fluor's schedule holds and the cost stays within $10-12M per MW.
Since we wrote this
- 17 NovThesis writtenFirst thesis: fair for signed rent, a gigawatt unleasedNeutral with medium conviction: 839 MW is leased with Google's credit behind most of it, but the Kentucky campus is unbuilt, shares rose 19% this year and Muskie has no tenant.
Sources 21
Sources - 21
Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.
- S01primarycompany filing2026-02-27Item 1: the Lake Mariner campus and its NYPA power, the Competition section naming classes of rival and no company, 141 employees, the 49,400 miners at 9.3 EH/s, the related-party ground lease from Somerset, and the 2025 revenue split of $151.6M digital assets against $16.9M of HPC lease revenuebacksC25C26C34C43C52
- S02primarycompany filing2026-11-06the leases (Core42, Fluidstack, Anthropic) and their terms, the Google backstop and warrant terms, the Anthropic credit support of 4 November, the debt note (secured notes, three convertibles), the April 2026 offering at $19.00 and the ATM sales, the Abernathy sale, the Justified and Muskie acquisitions, concentration, and 501,521,605 shares outstanding on 2 NovemberbacksC01C02C04C05C09C10C11C12C20C23C24C30C43C46C48C49
- S03primarycompany release2026-11-06the statements of operations and cash flows, the balance sheet, adjusted EBITDA of negative $12.8M and its reconciliation, and the revolver upsized to $400MbacksC06C07C08C09C25C27C47C49C51C53
- S04primarycompany release2026-11-06839 MW contracted, about $27B of contracted revenue and about $1.5B of average annualised NOI by campus, 102 MW operating and 737 MW under construction, the 2.1 GW pipeline, net debt of $3.4B, the Muskie milestones and the estimated diluted share count at prices from $10 to $24backsC01C02C03C09C10C12C18C21
- S05primarytranscript2026-11-06TeraWulf third-quarter 2026 earnings call transcriptLake Mariner's cost at about $8.9M per MW against $8-10M guidance, Justified's $10-12M per MW, the $550M of Justified equity contributed, the funding plan without equity markets, the 17% reported HPC margin against an 85% target, the Muskie gas-plant arrangement, and analyst turns from Northland, KBW, Wells Fargo, William Blair, Morgan Stanley and B. Riley
we will not sign 1 of the biggest leases that the company has ever signed and be forced to dilute our shareholders at these levels. We just will not do it.
backsC02C06C13C14C15C18C21C22C24C44C47 - S06primarycompany release2026-11-04Google's credit support for the debt behind about $19B of Anthropic lease commitments, Alphabet's AA+ and Aa2 ratings, and Fluor's guaranteed-maximum-price EPC agreement with first delivery in late 2027backsC05C14
- S07primarycompany release2026-10-05the amended Kentucky Power agreement for 1 GW, the second 500 MW moved from 2030 to 2029 subject to the PSC, and the first 500 MW ramping in 2028backsC18
- S08primarycompany release2026-10-05the counterparty's own account of the Muskie agreement: 1 GW, $100M of residential bill credits funded by TeraWulf, the gas plant's financing cost, and collateral requirements; read through press_fetch.py
TeraWulf has agreed to pay the estimated financing costs associated with construction of Kentucky Power's planned 760-MW combined-cycle generation facility at Big Sandy
backsC19 - S09primaryregulator2026-06-02Kentucky Public Service Commission, Case No. 2026-00115, Big Rivers and Kenergy informal conference handout on the TeraWulf (Justified Data) agreement, 2 June 2026 Kentucky Public Service Commissionthe regulator's docket: a 482 MW service agreement on a retired smelter's existing transmission, with the customer carrying all MISO market energy and capacity risk; read with curl and pdftotext
Located at retired Century Hawesville aluminum smelter. Existing transmission infrastructure already in place. 482 MW project size. 15-year Initial Term with five-year rolling extensions.
backsC20 - S10secondarynews2026-08-21the Commission's approval on 21 August and the curtailment term in a MISO emergency, reported by a public broadcaster; read through press_fetch.py
The PSC approved TeraWulf to use an existing 482-megawatt connection to the grid. The electricity would be sourced from the Midcontinent Independent System Operator, or MISO.
backsC20 - S11primarycompany filing2026-04-28the directors and officers and their tenure, the beneficial ownership table at 17 April 2026, the 2025 summary compensation table, the PSU price hurdles, and the related-party employee benefit trust funded at 2% of HPC capital spendingbacksC32C33C34C54
- S12primaryvendor data2026-11-17Research pack, frozen at content/WULF/research-pack.jsonthe 16 November close of $11.88, the 52-week range and returns, the price-move decomposition, the analyst rating series and target drift, FINRA consolidated short interest, the insider base rate and the analysts' revenue pathbacksC28C29C30C48
- S13primarycompany filing2026-11-1717 open-market sales (9 discretionary, 8 under a Rule 10b5-1 plan) and 12 small purchases by one director, read off each Form 4's own checkboxbacksC31
- S14primarygovernment data2026-09-15the underlying rate of change, measured by a statistical agency rather than the industry; quote as frozen by the Applied Digital and Cipher theses' read of the same page
Servers alone accounted for an estimated 7% of commercial sector electricity consumption in 2025. Data center server electricity use grows to 22%-33% of commercial building electricity use by 2050 across our cases.
backsC38 - S15secondaryindustry data2026-09-15Synergy Research Group - hyperscale operators to account for 67% of all data center capacity by 2031 Synergy Research Groupthe size of the substitute: how much of their own capacity the buyers build rather than lease
Almost 60% of that hyperscale capacity is now in own-built, owned data centers with the balance being in leased facilities … they now account for 48% of the worldwide capacity of all data centers … by 2031 hyperscale operators will account for 67% of all capacity
backsC36 - S16primaryindustry data2026-08-11a broker's North American absorption, capacity under construction and the owner-occupied part of it
North America data center demand reached an all-time high in the first half of 2026 with 25 GW of absorption, double the level from a year ago and five times that of two years prior. … North America now has 66 GW under construction, 95% of which is pre-committed. … Hyperscalers remain the dominant force, accounting for 59% of 2026 data center tenant demand while meeting capacity needs through both leasing and self-building, with 28 GW of owner-occupied capacity currently under construction.
backsC35 - S17secondaryindustry data2026-09-15vacancy at 1.4%, 80.4% of capacity under construction pre-committed, under 1,500 MW available: the scarcity the moat rests on, measured outside the company
primary market vacancy fell to a record low of 1.4% in H1 … commitments made on 80.4% of all under-construction capacity … Total under-construction capacity across primary markets increased by 24.8% in H1 to a record high of 7,481.1 MW … Less than 1,500 MW of future capacity across all primary markets remains available, representing approximately six months of demand
backsC37 - S18primarycompany release2026-11-02a competitor selling the same product to the same tenants: 700 MW leased to Amazon, a Google-backed Fluidstack and a hyperscaler, about $16.6bn of contracted revenuebacksC39
- S19primarycompany filing2026-07-29a named competitor selling the same product to the same buyer: approximately 15-year leases to investment-grade hyperscalersbacksC40
- S20primarycompany release2025-11-12the end buyer behind Fluidstack's New York leasing, in its own words: a $50bn commitment to build with Fluidstack in Texas and New York
building data centers with Fluidstack in Texas and New York, with more sites to come. These facilities are custom built for Anthropic with a focus on maximizing efficiency for our workloads
backsC41 - S21primarycompany release2026-02-26522 critical IT MW contracted at year end, Fluidstack's 380 MW described as commencing in 2026, full-year revenue of $168.5M and adjusted EBITDA of negative $23.1MbacksC23C26