MARA Holdings
This is the archived full research. Read the story
One of the largest bitcoin miners, holding cash and coins, trying to lease its power sites to AI data centres.
The scores
Growth1/4 ↓
Q3 sales fell 35% as bitcoin's price dropped; 2025's rise was bitcoin's price and more machines, not new demand.
Business quality2/4 →
A price-taker: its share of blocks equals its share of computing power, and rivals offer the same powered sites to AI tenants.
Financial position2/4 ↑
$1.30B of cash and $1.32B of bitcoin, against $924M of note puts in 2027, Long Ridge's cash need and about $420M a year of burn.
Execution record2/4 →
The lease promised in August for this year may now slip into next year; the notes and loans were handled as said.
Per share capture2/4 ↑
Diluted shares rose 14% in 2025 and stock pay runs near $170M a year; a lease would earn MARA only part of each project.
Potential2/4 →
A large prize of powered sites for AI tenants, but nothing is signed, MARA keeps a minority share, and tenants decide the timing.
Risk profile2/4 →
Bitcoin's price sets revenue and the value of the coins held, and Matagorda turns on one ERCOT study.
Valuation3/4 →
About book value marked to today's bitcoin: it pays for the cash, coins and plant, with a modest premium for unsigned leases.
Evidence quality3/4 →
Filed figures for mining, cash and debt; the lease case rests on management's targets and one rival's rent.
If it works 0.8× · if it fails you keep about 59%.
The Verdict
We rate MARA Holdings Neutral. The business is weak: at today's bitcoin price its mining earns less than it costs, and the company uses about $420M of cash a year. But after selling coins it holds cash and bitcoin worth about its notes plus a margin, and the price is about what it owns less what it owes, at today's bitcoin. The price is fair. As a bet it is fragile: one data-centre lease at a rival's rent would not lift the value above today's price. A signed lease of 200 MW or more would argue for owning it.
The long caseMARA owns connected power and a gas plant that AI tenants want, and partners will pay to build on them.
How we weighed it
The price against our value
Cuts both ways
No fair value is drawn: the forecasts show losses every year. The price sits near book marked to today's bitcoin, cheap against rivals who have signed rent.
The business
Against it
Weak
A weak business: a price-taker whose mining loses cash at today's bitcoin price, with no lease to show its sites earn more.
Growth against what the price assumes
Against it
Sales are falling with bitcoin's price, and the leases that would add rent keep slipping.
What could go wrong
Against it
Bitcoin's price drives revenue and the coins held, note puts fall due next year, and the gas plant takes cash before it earns.
Against competitors
Cuts both ways
The cheapest of its filed rivals on book value, because the dearer ones have already signed long leases.
How its group is behaving
Cuts both ways
Miners and AI landlords move together on bitcoin and on news of AI spending.
The latest news and report
Cuts both ways
The last report swapped coins for cash and cleared the loans, but pushed the lease target out again.
The evidence under this - 6 claims
MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.
Restructuring of $19.0M in Q3 and lower capital spending ahead could shrink the shortfall; a lower bitcoin price would widen it.
Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.
The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.
Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.
The company
Bitcoin is created by computers racing to solve a puzzle; about every ten minutes the network pays 3.125 new bitcoin, plus fees, to whoever solves it first. MARA runs tens of thousands of these machines on its own sites and in other companies' buildings, and won about 5.4% of all rewards in the third quarter.
Its new plan is to use the same power for AI data centres: Starwood would build halls on MARA's sites and find tenants, and MARA would keep 10% to 50% of each project.
The evidence under this - 3 claims
How it makes money
Almost all revenue is bitcoin mined: $159.0M of $164.2M in the third quarter. It rises and falls with bitcoin's price and with how much computing power the rest of the network adds. MARA's cost was $30.8 per petahash a day, a unit of mining power, and the electricity alone cost $39,674 per coin mined.
Exaion, its French cloud unit, signed a four-year $79M contract to rent out AI chips, its first in the United States.
The evidence under this - 4 claims
Where the money comes from, stream by stream
| Stream | Share of sales (Q3 2026) | How it earns it |
|---|---|---|
| Bitcoin mining | 96.8% | Block rewards and fees earned by its own machines through MARA Pool. |
| Other services | 3.2% | Exaion's cloud services, hosting and pool fees from outside miners. |
Who runs it
Fred Thiel has run MARA since April 2021 and also chairs the board. Directors and officers own under 1% of the shares. Only about a fifth of votes backed executive pay in 2025; bonuses pay on how much computing power is running and long-term awards on hashrate, megawatts and the share price against rivals.
Insiders sold steadily under plans set in advance and bought nothing in the past year.
The evidence under this - 3 claims
Why it wins, and who could beat it
Why customers come back
There is no protection on the mining side. Every miner sells the same coin at the same price, and the network pays each one in proportion to its computing power: MARA's 5.4% share of rewards is simply its share of the machines. When bitcoin falls, every miner earns less at once.
Connected power is scarce, which is what an AI tenant pays for, but MARA has not yet turned any of it into a lease.
The evidence under this - 4 claims
MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.
Requests are not demand: ERCOT counts every application, and much of the queue may never be built.
Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.
The threat
Other converted miners already offer the same thing: Riot signed a 910 MW, 15-year lease, and Hut 8, TeraWulf, IREN and Core Scientific describe leasing powered sites to AI tenants. The biggest tenants can also buy land and power themselves. In mining, every new machine added anywhere in the world cuts the share of rewards MARA's machines earn.
The evidence under this - 5 claims
Requests are not demand: ERCOT counts every application, and much of the queue may never be built.
MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.
The rivals: RIOT, HUT, WULF, IREN, CORZ, CLSK, and 1 more that is private, in-house or listed abroad.
Who else does this, rival by rival
| Ticker | Rival | Where it competes | How far along | Priced against it |
|---|---|---|---|---|
| RIOT · HUT · WULF · IREN · CORZ · CLSK | Converted miners and AI landlords: Riot, Hut 8, TeraWulf, IREN, Core Scientific, CleanSparkPriced against it: Yes | Digital Infrastructure | On sale | Yes |
| In-house | Hyperscalers and AI labs building their own campusesPriced against it: In-house | Digital Infrastructure | On sale | In-house |
| CLSK · RIOT · IREN | Every other bitcoin miner and poolPriced against it: Yes | Bitcoin Mining | On sale | Yes |
How big it could get
How big this could get
Texas's grid operator was tracking more than 438 GW of requests from large users in June 2026, nearly 89% data centres; many will never be built. Riot's lease shows what a converted site can earn: about $1.98M of rent per megawatt a year. MARA's largest Texas option, a 2,000 MW power letter at Matagorda, is about half a percent of those requests, and none of it is leased.
The evidence under this - 3 claims
Requests are not demand: ERCOT counts every application, and much of the queue may never be built.
Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.
The results
What growth costs
Growth has not made the business more profitable. Sales rose in 2025 while a profit turned into a $1.31B loss, and in 2026 sales are falling with bitcoin while machine wear, hosting fees and overheads stay fixed: $150.9M of depreciation and $75.8M of overheads in one quarter.
The evidence under this - 3 claims
The last report (9 Nov)
Quarter ended September 2026, filed figures.
In the third quarter of 2026 sales fell 35% to $164.2M as the price of each bitcoin mined dropped from $114,440 to $71,688. Reported profit of $632.1M came from the rise in the value of bitcoin held during the quarter, not from mining.
After the quarter MARA sold 13,597 bitcoin for about $1.1B, repaid all $750M of loans backed by its coins and approved a $500M share buyback. It now targets two data-centre leases by year-end but says they could slip into next year.
What it did to the thesisIt made the downside safer: the loans backed by coins are gone and cash is up. It did nothing for the case for more, because mining earns less and the lease promised for this year may slip.
The quarter in detail
Sales growth from the previous quarter, filed figures. The company has restated its own history, so a quarter either side of the restatement may describe a different business; n/c marks one that does not compare.
Earnings per share $1.28 against $-0.39 expected; $1.28 as filed, with no adjustments.
The evidence under this - 5 claims
The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.
What management did with the money
In 2025 MARA spent heavily on machines and bitcoin, partly with new shares: diluted shares rose 14%. In 2026 it reversed course, selling about 40,500 coins to buy back about $1.0B of notes, repay its loans and approve a buyback. It sold only $46.5M of new shares this year and has about $1.5B more it could sell.
Insiders in 2026Q3: 0 purchases and 23 sales, from their Form 4 filings.
The evidence under this - 4 claims
The price, and where we disagree
In short. Fair. The price is about what MARA owns less what it owes, at today's bitcoin, plus a modest premium for leases not yet signed.
The shares fell 48% in a year, to $6.64 on 16 November, as bitcoin fell to about $65,000. Nearly a third of the shares available to trade are sold short. Regulators approved the $1.5B purchase of the Long Ridge gas plant in Ohio on 4 November, and it should close within weeks.
The next test is the fourth-quarter report, due around 25 February 2027: whether a lease is signed, how much cash Long Ridge took, and how many coins are left.
The evidence under this - 4 claims
The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.
How we value it
No fair value: the analysts' forecasts show an operating loss in every year to 2029 and the business has no lasting profit after stock pay, so the bet and book value price it.
How we read the multiple
The company earns no profit to price, so we compare the price with what it owns less what it owes, its book value.
- At $6.64 the shares are worth $2.57B.
- In September MARA's assets less its debts were $2.35B, so the price was 1.09 times that.
- Re-marking the coins left to today's bitcoin brings it to about $1.94B, or 1.33 times.
- Cash and coins, about $2.62B, cover the $2.30B of notes with about $0.33B to spare.
- So the price pays about $0.6B extra for leases nobody has signed.
Against its own history. Buyers pay a little more than half their usual price for each dollar MARA owns less owes, and about a third of the usual for each dollar of sales.
The evidence under this - 4 claims
Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.
Priced against its rivals
The competitors its own annual report names, each confirmed against the rival's filing. Measured on price for each $1 of net worth, cheapest first:
| Ticker | Company | price for each $1 of net worth |
|---|---|---|
| MARA | MARA Holdings | 1.1× |
| IREN | IREN Limited | 1.3× |
| CLSK | CleanSpark | 2.2× |
| RIOT | Riot Platforms | 2.9× |
| HUT | Hut 8 | 4.2× |
| WULF | TeraWulf | 6.8× |
The middle of the other 5 is 2.9. MARA Holdings, Inc. is cheapest of 6.
Rivals' figures come from a data provider, so read the spread of the group rather than any single pair.
The cheapest of its rivals on what it owns less owes; the dearer ones have signed long leases, so the gap is MARA's own, not the group's.
The bet: what it pays if it works
This bet is on the data-centre business. If one 200 MW lease is signed at Riot's rent and MARA keeps half of it, its share of rent would be about $198M a year. Added to what MARA owns after another year of mining losses, that is still worth less than today's price.
If no lease comes, shareholders keep the cash, the coins and a mine that loses money: about three fifths of today's value.
| Digital Infrastructure revenue in two to three years | Megawatts of data-centre capacity leased needed | At the stated multiple |
|---|---|---|
| $99.00M | about 100 at 50% kept | 0.7× |
| $198.00M (the big win) | about 200 at 50% kept | 0.8× |
| $396.00M | about 400 at 50% kept | 1.1× |
To pay 2× (a Fair bet) it would need about $1.21B of Digital Infrastructure revenue (about 1.2K megawatts of data-centre capacity leased at 50% kept); to pay 5× (a Cheap bet), about $3.78B of Digital Infrastructure revenue (about 3.8K megawatts of data-centre capacity leased at 50% kept), at the same multiple.
Each row is Digital Infrastructure alone, plus the rest of the company (Bitcoin mining, the cash and bitcoin held, and the plant) counted at about $1.52B.
The steps it has to take
- Done Venture with Starwood formed
- Done Exaion's first take-or-pay GPU contract signed
- Done FERC approves the Long Ridge purchase
- Slipped First data-centre lease signed through Starwood due 2026-12
- In progress Long Ridge purchase closed due 2026-12
- Not started AI build begins at Long Ridge due 2027-06
- Not started First Long Ridge AI capacity ready for service due 2028-06
The detail behind the label
The evidence under this - 4 claims
Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.
Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.
Restructuring of $19.0M in Q3 and lower capital spending ahead could shrink the shortfall; a lower bitcoin price would widen it.
Where we disagree with the market
A cheap miner on its way to becoming an AI landlord, held back by bitcoin's fall.
A loss-making mine on a cushion of cash and coins; the AI plan is real but unsigned, so fair rather than cheap.
Bears see a miner losing money as bitcoin falls; bulls see the next Riot, the cheapest of its rivals and ready to sign leases. We see both halves: the coins cushion the downside, but nothing is signed, so the price is fair rather than cheap.
The evidence against us: if a lease of 200 MW or more is signed at a rent near Riot's, today's price would look low.
What analysts say, and the evidence
The evidence under this - 5 claims
Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.
The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.
MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.
What could go wrong, and how we would know
The risks
- Bitcoin falls further. Mining revenue and the value of the coins held both drop at once.
- Notes fall due. Holders can ask for about $924M back in 2027, paid from cash and coins.
- The plant takes cash first. Long Ridge needs about $0.6B and carries its own debt before any AI tenant pays.
- Rivals sign first. Riot and others are already leasing sites to the same tenants.
- One Texas study. Matagorda's power waits on the grid operator's batch study, which a state audit may delay.
The evidence under this - 5 claims
MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.
What we still do not know
- Which site MARA contributes to Starwood first, and how much of each project it keeps.
- Whether Exaion's $3B of interest turns into more signed contracts.
- Whether an AI tenant signs for Long Ridge before the build starts in 2027.
The evidence under this - 3 claims
No tenant has signed for the site, and the plant's power is today sold under hedges rather than to a data centre.
What would change our view
- Neutral→AttractiveA lease is signed
It needs:
- ○A data-centre lease of 200 MW or more is signed through Starwood with a creditworthy tenant.watched as it happens
- Neutral→UnattractiveThe cushion runs down
It needs any of:
- ○Bitcoin held falls below 10,000 coins with no lease signed.checked at the next results, due by 25 Feb
- ○New shares are sold to meet the note repayments or close Long Ridge.watched as it happens
- Neutral→UnattractiveA price that assumes the leases
It needs:
- ○The company's value rises to 1.8 times what it owned less what it owed in September, with no lease signed.about $10.97 today, 65% above the last close
We would also be wrong if
- The coins held fall below 15,000 by the fourth-quarter report.
- Long Ridge closes but leaves under $0.6B of cash.
What is coming
- 31 December 2026 Long Ridge closing: How much cash the plant takes and what it earns under MARA.
Every dated event ahead
- 31 December 2026 Long Ridge closing: How much cash the plant takes and what it earns under MARA.
- 31 March 2027 First Starwood data-centre lease: Whether MARA's sites can earn rent, at what price per megawatt and what share MARA keeps.
- 4 June 2027 First note put date: Whether $291.6M of notes is paid from cash without new shares.
Since we wrote this
- 17 NovThesis writtenNeutral, medium convictionWritten a week after the Q3 2026 results, with the shares down 48% in a year as bitcoin fell to about $65,000.
Sources 19
Sources - 19
Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.
- S01primarycompany filing2026-03-02the business, sites and megawatts, competition classes, one segment, headcount, 2025 revenue and loss, site purchase pricesbacksC01C02C13C33C39
- S02primarycompany filing2026-11-09costs, cash flow, bitcoin held and pledged, convertible notes and puts, shares, the Starwood venture, Matagorda, Long Ridge terms, FERC approval, hosting expiriesbacksC03C05C08C09C10C11C12C13C14C15C17C18C20C24C25C26C27C38
- S03primarycompany release2026-11-09the quarter's revenue, bitcoin produced, cost per petahash, the bitcoin sale and loan repayment, the buyback, the lease target and the Exaion contractbacksC01C03C04C06C07C09C11C15C16C17C26C27
- S04primarytranscript2026-11-09MARA Q3 2026 earnings call transcript (FMP), held 9 November 2026the funding plan for the note puts, the Long Ridge site's size and the Kearney delays
The strategy for us is capital light
backsC36C37 - S05primarycompany release2026-08-06the earlier lease promise and the Q2 revenuebacksC16
- S06primarycompany release2026-04-30the plant's size, its annualised adjusted EBITDA, the debt assumed and the AI build timetablebacksC18C36
- S07primarycompany filing2026-09-25the Matagorda milestone paymentsbacksC20
- S08primarycompany filing2026-11-16the $185M 8.75% note add-on and Long Ridge's nine-month results and debtbacksC19
- S09primarycompany filing2026-04-30the leaders, insider and institutional ownership, the say-on-pay vote and the pay designbacksC30C31
- S10primaryvendor data2026-11-16Research pack for MARA (FMP market tier, FINRA short interest, filed cohort), fetched 17 November 2026the 16 November close, market value, the cohort's price to book and sales, ratings, short interest and the returnsbacksC25C26C28C29C32
- S11primaryregulator2026-06-18ERCOT news release: PUCT approves ERCOT's Batch Zero process for connecting large electricity users ERCOTthe large-load requests and the batch process for connecting them
ERCOT is tracking more than 438,000 MW of large load requests, nearly 89 percent from data centers alone
backsC21 - S12primarycompany filing2026-11-04Riot Platforms Q3 2026 results release (8-K exhibit 99.1) Riot Platformsa rival's 910 MW, 15-year lease and its average yearly rentbacksC22C23
- S14primaryindustry data2026-11-09Hashrate Index (Luxor) weekly roundup, 9 November 2026 Luxor Hashrate Indexhashprice in dollars and in bitcoin, and the network's 30-day average hash rate
USD hashprice moved -2.8% from $32.82 per PH/s/Day to a current $31.89 per PH/s/Day.
backsC07 - S15primaryvendor data2026-11-16FMP daily bitcoin price (BTCUSD), close of 16 November 2026bitcoin's close of $64,849 on 16 NovemberbacksC07C26
- S16primarycompany filing2026-11-04Form 4 filings by MARA insiders, read for the Rule 10b5-1 flag (scripts/insider_fetch.py)31 open-market sales in the year, all under pre-arranged plans, and no purchasesbacksC32
- S17primarycompany filing2026-02-26a former self-miner that builds and leases powered data-centre sitesbacksC34
- S18primarycompany filing2026-02-27a converted miner leasing AI infrastructure on reused industrial sitesbacksC34
- S19primarycompany filing2026-08-27a miner running its own grid-connected sites for AI cloud customersbacksC34
- S20primarycompany release2026-06-25the existing 200 MW of MARA capacity at the Long Ridge site and Long Ridge's adjusted EBITDA bridgebacksC36