← All thesesMARANeutralMedium convictionTuesday 17 November 2026עברית

MARA Holdings

This is the archived full research. Read the story

One of the largest bitcoin miners, holding cash and coins, trying to lease its power sites to AI data centres.

Our viewNeutral Medium conviction
The scores
The profile · 1-4
Growth1/4 ↓

Q3 sales fell 35% as bitcoin's price dropped; 2025's rise was bitcoin's price and more machines, not new demand.

Business quality2/4 →

A price-taker: its share of blocks equals its share of computing power, and rivals offer the same powered sites to AI tenants.

Financial position2/4 ↑

$1.30B of cash and $1.32B of bitcoin, against $924M of note puts in 2027, Long Ridge's cash need and about $420M a year of burn.

Execution record2/4 →

The lease promised in August for this year may now slip into next year; the notes and loans were handled as said.

Per share capture2/4 ↑

Diluted shares rose 14% in 2025 and stock pay runs near $170M a year; a lease would earn MARA only part of each project.

Potential2/4 →

A large prize of powered sites for AI tenants, but nothing is signed, MARA keeps a minority share, and tenants decide the timing.

Risk profile2/4 →

Bitcoin's price sets revenue and the value of the coins held, and Matagorda turns on one ERCOT study.

Valuation3/4 →

About book value marked to today's bitcoin: it pays for the cash, coins and plant, with a modest premium for unsigned leases.

Evidence quality3/4 →

Filed figures for mining, cash and debt; the lease case rests on management's targets and one rival's rent.

The bet · 2-3 years
Priced for success0.8×

If it works 0.8× · if it fails you keep about 59%.

The Verdict

We rate MARA Holdings Neutral. The business is weak: at today's bitcoin price its mining earns less than it costs, and the company uses about $420M of cash a year. But after selling coins it holds cash and bitcoin worth about its notes plus a margin, and the price is about what it owns less what it owes, at today's bitcoin. The price is fair. As a bet it is fragile: one data-centre lease at a rival's rent would not lift the value above today's price. A signed lease of 200 MW or more would argue for owning it.

The long caseMARA owns connected power and a gas plant that AI tenants want, and partners will pay to build on them.

How we weighed it

The price against our value

Cuts both ways

No fair value is drawn: the forecasts show losses every year. The price sits near book marked to today's bitcoin, cheap against rivals who have signed rent.

The business

Against it

Weak

A weak business: a price-taker whose mining loses cash at today's bitcoin price, with no lease to show its sites earn more.

Growth against what the price assumes

Against it

Sales are falling with bitcoin's price, and the leases that would add rent keep slipping.

What could go wrong

Against it

Bitcoin's price drives revenue and the coins held, note puts fall due next year, and the gas plant takes cash before it earns.

Against competitors

Cuts both ways

The cheapest of its filed rivals on book value, because the dearer ones have already signed long leases.

How its group is behaving

Cuts both ways

Miners and AI landlords move together on bitcoin and on news of AI spending.

The latest news and report

Cuts both ways

The last report swapped coins for cash and cleared the loans, but pushed the lease target out again.

The evidence under this - 6 claims
C07inferencehigh confidence
Hashprice, what a petahash earns a day, was $31.89 on 9 November by the Hashrate Index; at bitcoin's $64,849 close of 16 November it is about $27.7, below MARA's Q3 cost of $30.8: mining loses cash at today's price.
against this

MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.

current state · 2026-11-16written 2026-11-17
C27estimatehigh confidence
Counting bitcoin mined as cash received, the business used about $316M in the nine months to September 2026, roughly $420M a year.
against this

Restructuring of $19.0M in Q3 and lower capital spending ahead could shrink the shortfall; a lower bitcoin price would widen it.

historical · 9M 2026written 2026-11-17
C26estimatehigh confidence
Marked to bitcoin's 16 November price, MARA holds about $1.30B of cash and 20,415 bitcoin worth about $1.32B against $2.30B of notes, so net financial assets are about $0.33B and book value is about $1.94B, which the price is about 1.33 times.
against this

Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.

current state · 2026-11-16written 2026-11-17
C16management claimhigh confidence
Management targets two data-centre leases before year-end 2026 and says the timing could slip into next year; in August it was confident of at least one.
against this

The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.

forwardwritten 2026-11-17
C25facthigh confidence
At the 16 November close of $6.64 MARA's market value was $2.57B, 1.09 times September book value against a cohort median of 2.9 (IREN 1.3 to WULF 6.8), and 3.6 times sales against 9.75.
current state · 2026-11-16written 2026-11-17
C23inferencehigh confidence
Riot's lease implies about $1.98M of rent per megawatt a year, the best public price for a converted Texas mining site.
against this

Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.

current state · 2026-11-04written 2026-11-17
01

The company

Bitcoin is created by computers racing to solve a puzzle; about every ten minutes the network pays 3.125 new bitcoin, plus fees, to whoever solves it first. MARA runs tens of thousands of these machines on its own sites and in other companies' buildings, and won about 5.4% of all rewards in the third quarter.

Its new plan is to use the same power for AI data centres: Starwood would build halls on MARA's sites and find tenants, and MARA would keep 10% to 50% of each project.

The evidence under this - 3 claims
C01facthigh confidence
MARA mines bitcoin for its own account: 71.2 EH/s energized at 30 September 2026; at the end of 2025 its owned sites ran 779 MW of 1,324 MW built, with 536 MW more at hosts' sites.
current state · 2026-09-30written 2026-11-17
C04facthigh confidence
MARA produced 2,247 bitcoin in Q3 2026 and won 644 blocks, a 5.4% share of the rewards paid to all miners.
historical · Q3 2026written 2026-11-17
C15facthigh confidence
Under the Starwood venture MARA contributes sites and keeps 10% to 50% of each project while Starwood builds, finds hyperscale tenants and operates; at 30 September no site had been contributed and no lease signed.
current state · 2026-09-30written 2026-11-17

How it makes money

Almost all revenue is bitcoin mined: $159.0M of $164.2M in the third quarter. It rises and falls with bitcoin's price and with how much computing power the rest of the network adds. MARA's cost was $30.8 per petahash a day, a unit of mining power, and the electricity alone cost $39,674 per coin mined.

Exaion, its French cloud unit, signed a four-year $79M contract to rent out AI chips, its first in the United States.

The evidence under this - 4 claims
C03facthigh confidence
Q3 2026 revenue was $164.2M against $252.4M a year earlier, $159.0M of it mining; the average price of each bitcoin mined fell to $71,688 from $114,440.
historical · Q3 2026written 2026-11-17
C04facthigh confidence
MARA produced 2,247 bitcoin in Q3 2026 and won 644 blocks, a 5.4% share of the rewards paid to all miners.
historical · Q3 2026written 2026-11-17
C06facthigh confidence
MARA's cost per petahash a day was $30.8 in Q3 2026, and its purchased energy cost per bitcoin mined was $39,674.
historical · Q3 2026written 2026-11-17
C17facthigh confidence
Exaion, MARA's majority-owned French cloud unit, signed a four-year $79M GPU-as-a-service contract on 100% take-or-pay terms; its $3B pipeline is not contracted.
current state · 2026-11-09written 2026-11-17
Where the money comes from, stream by stream
StreamShare of sales (Q3 2026)How it earns it
Bitcoin mining96.8%Block rewards and fees earned by its own machines through MARA Pool.
Other services3.2%Exaion's cloud services, hosting and pool fees from outside miners.

Who runs it

Fred Thiel has run MARA since April 2021 and also chairs the board. Directors and officers own under 1% of the shares. Only about a fifth of votes backed executive pay in 2025; bonuses pay on how much computing power is running and long-term awards on hashrate, megawatts and the share price against rivals.

Insiders sold steadily under plans set in advance and bought nothing in the past year.

The evidence under this - 3 claims
C30facthigh confidence
Fred Thiel has been chief executive since April 2021 and chairs the board; he owned 2,113,876 shares, and directors and officers together held 3,707,325, under 1%.
current state · 2026-04-30written 2026-11-17
C31facthigh confidence
Only 21.6% of votes supported executive pay in 2025; the bonus rests on a hashrate-hours target and two thirds of long-term awards on hashrate, exahash, megawatts and relative share return.
historical · 2025 pay yearwritten 2026-11-17
C32facthigh confidence
Insiders made 31 open-market sales of 660,497 shares in the year to November 2026, all under pre-arranged 10b5-1 plans, and bought none.
historical · 2025-11-17 to 2026-11-17written 2026-11-17
02

Why it wins, and who could beat it

Why customers come back

There is no protection on the mining side. Every miner sells the same coin at the same price, and the network pays each one in proportion to its computing power: MARA's 5.4% share of rewards is simply its share of the machines. When bitcoin falls, every miner earns less at once.

Connected power is scarce, which is what an AI tenant pays for, but MARA has not yet turned any of it into a lease.

The evidence under this - 4 claims
C04facthigh confidence
MARA produced 2,247 bitcoin in Q3 2026 and won 644 blocks, a 5.4% share of the rewards paid to all miners.
historical · Q3 2026written 2026-11-17
C07inferencehigh confidence
Hashprice, what a petahash earns a day, was $31.89 on 9 November by the Hashrate Index; at bitcoin's $64,849 close of 16 November it is about $27.7, below MARA's Q3 cost of $30.8: mining loses cash at today's price.
against this

MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.

current state · 2026-11-16written 2026-11-17
C21facthigh confidence
ERCOT, the Texas grid operator, was tracking more than 438 GW of large-load requests in June 2026, nearly 89% from data centres, and will connect them in batches.
against this

Requests are not demand: ERCOT counts every application, and much of the queue may never be built.

current state · 2026-06-18written 2026-11-17
C23inferencehigh confidence
Riot's lease implies about $1.98M of rent per megawatt a year, the best public price for a converted Texas mining site.
against this

Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.

current state · 2026-11-04written 2026-11-17

The threat

Other converted miners already offer the same thing: Riot signed a 910 MW, 15-year lease, and Hut 8, TeraWulf, IREN and Core Scientific describe leasing powered sites to AI tenants. The biggest tenants can also buy land and power themselves. In mining, every new machine added anywhere in the world cuts the share of rewards MARA's machines earn.

The evidence under this - 5 claims
C34facthigh confidence
Hut 8, TeraWulf and IREN each describe in their own annual reports building or leasing powered data-centre sites from former mining power, the same route MARA proposes.
current state · 2026-08-27written 2026-11-17
C22facthigh confidence
Riot Platforms signed a 15-year lease for 910 MW at Corsicana with a frontier AI lab, about $28B in total and about $1.8B of average yearly rent.
current state · 2026-11-04written 2026-11-17
C21facthigh confidence
ERCOT, the Texas grid operator, was tracking more than 438 GW of large-load requests in June 2026, nearly 89% from data centres, and will connect them in batches.
against this

Requests are not demand: ERCOT counts every application, and much of the queue may never be built.

current state · 2026-06-18written 2026-11-17
C04facthigh confidence
MARA produced 2,247 bitcoin in Q3 2026 and won 644 blocks, a 5.4% share of the rewards paid to all miners.
historical · Q3 2026written 2026-11-17
C07inferencehigh confidence
Hashprice, what a petahash earns a day, was $31.89 on 9 November by the Hashrate Index; at bitcoin's $64,849 close of 16 November it is about $27.7, below MARA's Q3 cost of $30.8: mining loses cash at today's price.
against this

MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.

current state · 2026-11-16written 2026-11-17

The rivals: RIOT, HUT, WULF, IREN, CORZ, CLSK, and 1 more that is private, in-house or listed abroad.

Who else does this, rival by rival
TickerRivalWhere it competesHow far alongPriced against it
RIOT · HUT · WULF · IREN · CORZ · CLSKConverted miners and AI landlords: Riot, Hut 8, TeraWulf, IREN, Core Scientific, CleanSparkPriced against it: YesDigital InfrastructureOn saleYes
In-houseHyperscalers and AI labs building their own campusesPriced against it: In-houseDigital InfrastructureOn saleIn-house
CLSK · RIOT · IRENEvery other bitcoin miner and poolPriced against it: YesBitcoin MiningOn saleYes
03

How big it could get

How big this could get

Texas's grid operator was tracking more than 438 GW of requests from large users in June 2026, nearly 89% data centres; many will never be built. Riot's lease shows what a converted site can earn: about $1.98M of rent per megawatt a year. MARA's largest Texas option, a 2,000 MW power letter at Matagorda, is about half a percent of those requests, and none of it is leased.

The evidence under this - 3 claims
C21facthigh confidence
ERCOT, the Texas grid operator, was tracking more than 438 GW of large-load requests in June 2026, nearly 89% from data centres, and will connect them in batches.
against this

Requests are not demand: ERCOT counts every application, and much of the queue may never be built.

current state · 2026-06-18written 2026-11-17
C23inferencehigh confidence
Riot's lease implies about $1.98M of rent per megawatt a year, the best public price for a converted Texas mining site.
against this

Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.

current state · 2026-11-04written 2026-11-17
C20facthigh confidence
At Matagorda, Texas, MARA holds a utility letter for up to 2,000 MW and owes up to $600M of milestone payments, none paid; the site awaits ERCOT's Batch Zero study, which a state audit may delay.
current state · 2026-11-09written 2026-11-17
04

The results

What growth costs

Growth has not made the business more profitable. Sales rose in 2025 while a profit turned into a $1.31B loss, and in 2026 sales are falling with bitcoin while machine wear, hosting fees and overheads stay fixed: $150.9M of depreciation and $75.8M of overheads in one quarter.

The evidence under this - 3 claims
C02facthigh confidence
Revenue was $907.1M in 2025 against $656.4M in 2024, and the year ended in a net loss of $1,311.9M against net income of $541.0M.
historical · FY2025written 2026-11-17
C05facthigh confidence
Q3 2026 costs: purchased energy $48.1M, third-party hosting $71.5M, operations and maintenance $21.5M, general and administrative $75.8M with $28.4M of stock pay, and depreciation and amortisation $150.9M.
historical · Q3 2026written 2026-11-17
C08facthigh confidence
In the nine months to September 2026 the net loss was $1,241.6M and the operating loss $1,406.0M; operating cash flow was minus $642.7M and capital spending $186.4M.
historical · 9M 2026written 2026-11-17

The last report (9 Nov)

Quarter ended September 2026, filed figures.

-13%
Sales growth
against the same quarter a year earlier
5.7%
Growth from the quarter before
against -20.7% the quarter before that
1209¢
Operating profit
per dollar of sales

In the third quarter of 2026 sales fell 35% to $164.2M as the price of each bitcoin mined dropped from $114,440 to $71,688. Reported profit of $632.1M came from the rise in the value of bitcoin held during the quarter, not from mining.

After the quarter MARA sold 13,597 bitcoin for about $1.1B, repaid all $750M of loans backed by its coins and approved a $500M share buyback. It now targets two data-centre leases by year-end but says they could slip into next year.

What it did to the thesisIt made the downside safer: the loans backed by coins are gone and cash is up. It did nothing for the case for more, because mining earns less and the lease promised for this year may slip.

The quarter in detail

Sales growth from the previous quarter, filed figures. The company has restated its own history, so a quarter either side of the restatement may describe a different business; n/c marks one that does not compare.

Earnings per share $1.28 against $-0.39 expected; $1.28 as filed, with no adjustments.

The evidence under this - 5 claims
C03facthigh confidence
Q3 2026 revenue was $164.2M against $252.4M a year earlier, $159.0M of it mining; the average price of each bitcoin mined fell to $71,688 from $114,440.
historical · Q3 2026written 2026-11-17
C04facthigh confidence
MARA produced 2,247 bitcoin in Q3 2026 and won 644 blocks, a 5.4% share of the rewards paid to all miners.
historical · Q3 2026written 2026-11-17
C09facthigh confidence
Q3 2026 net income was $632.1M, $1.28 a diluted share, and it included an $885.3M gain on the bitcoin held as its price rose in the quarter.
historical · Q3 2026written 2026-11-17
C11facthigh confidence
After the quarter MARA sold 13,597 bitcoin for about $1.1B, repaid all $750M of bitcoin-backed loans, released 17,477 pledged bitcoin and authorised a $500M share buyback.
current state · 2026-11-09written 2026-11-17
C16management claimhigh confidence
Management targets two data-centre leases before year-end 2026 and says the timing could slip into next year; in August it was confident of at least one.
against this

The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.

forwardwritten 2026-11-17
What management did with the money

In 2025 MARA spent heavily on machines and bitcoin, partly with new shares: diluted shares rose 14%. In 2026 it reversed course, selling about 40,500 coins to buy back about $1.0B of notes, repay its loans and approve a buyback. It sold only $46.5M of new shares this year and has about $1.5B more it could sell.

Insiders in 2026Q3: 0 purchases and 23 sales, from their Form 4 filings.

The evidence under this - 4 claims
C38facthigh confidence
In the nine months to September 2026 MARA bought back about $1.0B of convertible notes for a $70.6M gain, repaid its $350M credit line and sold 26,984 bitcoin for $1.9B.
historical · 9M 2026written 2026-11-17
C11facthigh confidence
After the quarter MARA sold 13,597 bitcoin for about $1.1B, repaid all $750M of bitcoin-backed loans, released 17,477 pledged bitcoin and authorised a $500M share buyback.
current state · 2026-11-09written 2026-11-17
C13facthigh confidence
387,406,403 shares were outstanding on 29 October 2026; diluted shares averaged 355.2M in 2025 against 311.8M in 2024.
current state · 2026-10-29written 2026-11-17
C14facthigh confidence
MARA sold 3.84M shares for $46.5M under its at-the-market programme in July 2026 and about $1.5B of that programme remains unused.
current state · 2026-09-30written 2026-11-17
05

The price, and where we disagree

In short. Fair. The price is about what MARA owns less what it owes, at today's bitcoin, plus a modest premium for leases not yet signed.

Share price
$6.64
close,
Price for each $1 of net worth
1.1
rivals' middle 2.9 · its 6-year normal 1.9

The shares fell 48% in a year, to $6.64 on 16 November, as bitcoin fell to about $65,000. Nearly a third of the shares available to trade are sold short. Regulators approved the $1.5B purchase of the Long Ridge gas plant in Ohio on 4 November, and it should close within weeks.

The next test is the fourth-quarter report, due around 25 February 2027: whether a lease is signed, how much cash Long Ridge took, and how many coins are left.

The evidence under this - 4 claims
C29facthigh confidence
The shares fell 48% over the last 252 sessions and 41% over the last 60, to a close of $6.64 on 16 November.
historical · 2025-11-13 to 2026-11-16written 2026-11-17
C28facthigh confidence
Of the analysts in the pack 9 rate MARA a buy, 11 a hold and 2 a sell; short interest was 29.8% of the float at the 30 October settlement.
current state · 2026-11-16written 2026-11-17
C18facthigh confidence
MARA agreed to buy Long Ridge, a 505 MW nameplate gas plant in Ohio, for about $1.5B including up to about $900M of its debt; the plant had about $144M of annualised adjusted EBITDA, and FERC approved the deal on 4 November.
current state · 2026-11-09written 2026-11-17
C16management claimhigh confidence
Management targets two data-centre leases before year-end 2026 and says the timing could slip into next year; in August it was confident of at least one.
against this

The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.

forwardwritten 2026-11-17
The betPriced for success
If it works
0.8×
from today's value, at the stated multiple
If it fails
keep 59%
of today's market value: the rest of the company, less its debt
How we value it

No fair value: the analysts' forecasts show an operating loss in every year to 2029 and the business has no lasting profit after stock pay, so the bet and book value price it.

How we read the multiple

The company earns no profit to price, so we compare the price with what it owns less what it owes, its book value.

  1. At $6.64 the shares are worth $2.57B.
  2. In September MARA's assets less its debts were $2.35B, so the price was 1.09 times that.
  3. Re-marking the coins left to today's bitcoin brings it to about $1.94B, or 1.33 times.
  4. Cash and coins, about $2.62B, cover the $2.30B of notes with about $0.33B to spare.
  5. So the price pays about $0.6B extra for leases nobody has signed.

Against its own history. Buyers pay a little more than half their usual price for each dollar MARA owns less owes, and about a third of the usual for each dollar of sales.

The evidence under this - 4 claims
C26estimatehigh confidence
Marked to bitcoin's 16 November price, MARA holds about $1.30B of cash and 20,415 bitcoin worth about $1.32B against $2.30B of notes, so net financial assets are about $0.33B and book value is about $1.94B, which the price is about 1.33 times.
against this

Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.

current state · 2026-11-16written 2026-11-17
C25facthigh confidence
At the 16 November close of $6.64 MARA's market value was $2.57B, 1.09 times September book value against a cohort median of 2.9 (IREN 1.3 to WULF 6.8), and 3.6 times sales against 9.75.
current state · 2026-11-16written 2026-11-17
C10facthigh confidence
At 30 September 2026 MARA held $946.5M of cash and 34,012 bitcoin valued at $83,556 each, about $2.8B; 17,852 were pledged against loans and 1,408 lent out.
current state · 2026-09-30written 2026-11-17
C12facthigh confidence
Convertible notes total about $2,297M: $48.1M due December 2026, $632.5M puttable on 1 December 2027, $291.6M puttable on 4 June 2027, $300M puttable in March 2029 and $1,025M puttable in January 2030; conversion prices run $18.89 to $76.17.
current state · 2026-09-30written 2026-11-17
Priced against its rivals

The competitors its own annual report names, each confirmed against the rival's filing. Measured on price for each $1 of net worth, cheapest first:

TickerCompanyprice for each $1 of net worth
MARAMARA Holdings1.1×
IRENIREN Limited1.3×
CLSKCleanSpark2.2×
RIOTRiot Platforms2.9×
HUTHut 84.2×
WULFTeraWulf6.8×

The middle of the other 5 is 2.9. MARA Holdings, Inc. is cheapest of 6.

Rivals' figures come from a data provider, so read the spread of the group rather than any single pair.

The cheapest of its rivals on what it owns less owes; the dearer ones have signed long leases, so the gap is MARA's own, not the group's.

The bet: what it pays if it works

This bet is on the data-centre business. If one 200 MW lease is signed at Riot's rent and MARA keeps half of it, its share of rent would be about $198M a year. Added to what MARA owns after another year of mining losses, that is still worth less than today's price.

If no lease comes, shareholders keep the cash, the coins and a mine that loses money: about three fifths of today's value.

Digital Infrastructure revenue in two to three yearsMegawatts of data-centre capacity leased neededAt the stated multiple
$99.00Mabout 100 at 50% kept0.7×
$198.00M (the big win)about 200 at 50% kept0.8×
$396.00Mabout 400 at 50% kept1.1×

To pay 2× (a Fair bet) it would need about $1.21B of Digital Infrastructure revenue (about 1.2K megawatts of data-centre capacity leased at 50% kept); to pay 5× (a Cheap bet), about $3.78B of Digital Infrastructure revenue (about 3.8K megawatts of data-centre capacity leased at 50% kept), at the same multiple.

Each row is Digital Infrastructure alone, plus the rest of the company (Bitcoin mining, the cash and bitcoin held, and the plant) counted at about $1.52B.

The steps it has to take

  • Done Venture with Starwood formed
  • Done Exaion's first take-or-pay GPU contract signed
  • Done FERC approves the Long Ridge purchase
  • Slipped First data-centre lease signed through Starwood due 2026-12
  • In progress Long Ridge purchase closed due 2026-12
  • Not started AI build begins at Long Ridge due 2027-06
  • Not started First Long Ridge AI capacity ready for service due 2028-06
The detail behind the label
Rating
Expensive
the big win's payoff against the 2× and 5× lines
Cheap bet at about
$1.09
84% below the price (close, )
The option
0.6×
what Digital Infrastructure is worth if it works, against what the price pays for it
The evidence under this - 4 claims
C15facthigh confidence
Under the Starwood venture MARA contributes sites and keeps 10% to 50% of each project while Starwood builds, finds hyperscale tenants and operates; at 30 September no site had been contributed and no lease signed.
current state · 2026-09-30written 2026-11-17
C23inferencehigh confidence
Riot's lease implies about $1.98M of rent per megawatt a year, the best public price for a converted Texas mining site.
against this

Riot's lease is triple-net on a built campus; MARA's share under Starwood would sit behind venture debt and carry 10% to 50% of the rent, not all of it.

current state · 2026-11-04written 2026-11-17
C26estimatehigh confidence
Marked to bitcoin's 16 November price, MARA holds about $1.30B of cash and 20,415 bitcoin worth about $1.32B against $2.30B of notes, so net financial assets are about $0.33B and book value is about $1.94B, which the price is about 1.33 times.
against this

Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.

current state · 2026-11-16written 2026-11-17
C27estimatehigh confidence
Counting bitcoin mined as cash received, the business used about $316M in the nine months to September 2026, roughly $420M a year.
against this

Restructuring of $19.0M in Q3 and lower capital spending ahead could shrink the shortfall; a lower bitcoin price would widen it.

historical · 9M 2026written 2026-11-17

Where we disagree with the market

The market believes

A cheap miner on its way to becoming an AI landlord, held back by bitcoin's fall.

We believe

A loss-making mine on a cushion of cash and coins; the AI plan is real but unsigned, so fair rather than cheap.

Bears see a miner losing money as bitcoin falls; bulls see the next Riot, the cheapest of its rivals and ready to sign leases. We see both halves: the coins cushion the downside, but nothing is signed, so the price is fair rather than cheap.

The evidence against us: if a lease of 200 MW or more is signed at a rent near Riot's, today's price would look low.

What analysts say, and the evidence
Analysts positive
60%
of 15, 1 Nov
Four months earlier
57%
of 14, 1 Jul
The evidence under this - 5 claims
C28facthigh confidence
Of the analysts in the pack 9 rate MARA a buy, 11 a hold and 2 a sell; short interest was 29.8% of the float at the 30 October settlement.
current state · 2026-11-16written 2026-11-17
C25facthigh confidence
At the 16 November close of $6.64 MARA's market value was $2.57B, 1.09 times September book value against a cohort median of 2.9 (IREN 1.3 to WULF 6.8), and 3.6 times sales against 9.75.
current state · 2026-11-16written 2026-11-17
C26estimatehigh confidence
Marked to bitcoin's 16 November price, MARA holds about $1.30B of cash and 20,415 bitcoin worth about $1.32B against $2.30B of notes, so net financial assets are about $0.33B and book value is about $1.94B, which the price is about 1.33 times.
against this

Closing Long Ridge will spend about $0.6B of the cash, and the buyback and note puts will use more; the figure is a snapshot.

current state · 2026-11-16written 2026-11-17
C16management claimhigh confidence
Management targets two data-centre leases before year-end 2026 and says the timing could slip into next year; in August it was confident of at least one.
against this

The chief executive said on the call that delays at Kearney sit on the customer side, so the target rests on tenants MARA does not control.

forwardwritten 2026-11-17
C07inferencehigh confidence
Hashprice, what a petahash earns a day, was $31.89 on 9 November by the Hashrate Index; at bitcoin's $64,849 close of 16 November it is about $27.7, below MARA's Q3 cost of $30.8: mining loses cash at today's price.
against this

MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.

current state · 2026-11-16written 2026-11-17
06

What could go wrong, and how we would know

The risks

  • Bitcoin falls further. Mining revenue and the value of the coins held both drop at once.
  • Notes fall due. Holders can ask for about $924M back in 2027, paid from cash and coins.
  • The plant takes cash first. Long Ridge needs about $0.6B and carries its own debt before any AI tenant pays.
  • Rivals sign first. Riot and others are already leasing sites to the same tenants.
  • One Texas study. Matagorda's power waits on the grid operator's batch study, which a state audit may delay.
The evidence under this - 5 claims
C07inferencehigh confidence
Hashprice, what a petahash earns a day, was $31.89 on 9 November by the Hashrate Index; at bitcoin's $64,849 close of 16 November it is about $27.7, below MARA's Q3 cost of $30.8: mining loses cash at today's price.
against this

MARA's cost per petahash includes hosting fees on about 29% of capacity; its owned sites run cheaper, so part of the fleet still earns cash at this price.

current state · 2026-11-16written 2026-11-17
C12facthigh confidence
Convertible notes total about $2,297M: $48.1M due December 2026, $632.5M puttable on 1 December 2027, $291.6M puttable on 4 June 2027, $300M puttable in March 2029 and $1,025M puttable in January 2030; conversion prices run $18.89 to $76.17.
current state · 2026-09-30written 2026-11-17
C18facthigh confidence
MARA agreed to buy Long Ridge, a 505 MW nameplate gas plant in Ohio, for about $1.5B including up to about $900M of its debt; the plant had about $144M of annualised adjusted EBITDA, and FERC approved the deal on 4 November.
current state · 2026-11-09written 2026-11-17
C34facthigh confidence
Hut 8, TeraWulf and IREN each describe in their own annual reports building or leasing powered data-centre sites from former mining power, the same route MARA proposes.
current state · 2026-08-27written 2026-11-17
C20facthigh confidence
At Matagorda, Texas, MARA holds a utility letter for up to 2,000 MW and owes up to $600M of milestone payments, none paid; the site awaits ERCOT's Batch Zero study, which a state audit may delay.
current state · 2026-11-09written 2026-11-17
What we still do not know
  • Which site MARA contributes to Starwood first, and how much of each project it keeps.
  • Whether Exaion's $3B of interest turns into more signed contracts.
  • Whether an AI tenant signs for Long Ridge before the build starts in 2027.
The evidence under this - 3 claims
C15facthigh confidence
Under the Starwood venture MARA contributes sites and keeps 10% to 50% of each project while Starwood builds, finds hyperscale tenants and operates; at 30 September no site had been contributed and no lease signed.
current state · 2026-09-30written 2026-11-17
C17facthigh confidence
Exaion, MARA's majority-owned French cloud unit, signed a four-year $79M GPU-as-a-service contract on 100% take-or-pay terms; its $3B pipeline is not contracted.
current state · 2026-11-09written 2026-11-17
C36management claimhigh confidence
Management plans an initial AI build at Long Ridge from the first half of 2027, ready for service in mid-2028, with up to 600 gross MW for AI and about a gigawatt in total on the site.
against this

No tenant has signed for the site, and the plant's power is today sold under hedges rather than to a data centre.

forwardwritten 2026-11-17

What would change our view

  1. Neutral→AttractiveA lease is signed

    It needs:

    • ○A data-centre lease of 200 MW or more is signed through Starwood with a creditworthy tenant.watched as it happens
  2. Neutral→UnattractiveThe cushion runs down

    It needs any of:

    • ○Bitcoin held falls below 10,000 coins with no lease signed.checked at the next results, due by 25 Feb
    • ○New shares are sold to meet the note repayments or close Long Ridge.watched as it happens
  3. Neutral→UnattractiveA price that assumes the leases

    It needs:

    • ○The company's value rises to 1.8 times what it owned less what it owed in September, with no lease signed.about $10.97 today, 65% above the last close
We would also be wrong if
  • The coins held fall below 15,000 by the fourth-quarter report.
  • Long Ridge closes but leaves under $0.6B of cash.

What is coming

  • 31 December 2026 Long Ridge closing: How much cash the plant takes and what it earns under MARA.
Every dated event ahead
  • 31 December 2026 Long Ridge closing: How much cash the plant takes and what it earns under MARA.
  • 31 March 2027 First Starwood data-centre lease: Whether MARA's sites can earn rent, at what price per megawatt and what share MARA keeps.
  • 4 June 2027 First note put date: Whether $291.6M of notes is paid from cash without new shares.
Since we wrote this
Written
17 Nov
Price the thesis read
$6.64
16 Nov
  • 17 NovThesis writtenNeutral, medium convictionWritten a week after the Q3 2026 results, with the shares down 48% in a year as bitcoin fell to about $65,000.

Sources 19

Where this came from

Sources - 19

Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.

  1. S01primarycompany filing2026-03-02
    the business, sites and megawatts, competition classes, one segment, headcount, 2025 revenue and loss, site purchase prices
    backsC01C02C13C33C39
  2. S02primarycompany filing2026-11-09
    costs, cash flow, bitcoin held and pledged, convertible notes and puts, shares, the Starwood venture, Matagorda, Long Ridge terms, FERC approval, hosting expiries
    backsC03C05C08C09C10C11C12C13C14C15C17C18C20C24C25C26C27C38
  3. S03primarycompany release2026-11-09
    the quarter's revenue, bitcoin produced, cost per petahash, the bitcoin sale and loan repayment, the buyback, the lease target and the Exaion contract
    backsC01C03C04C06C07C09C11C15C16C17C26C27
  4. S04primarytranscript2026-11-09
    MARA Q3 2026 earnings call transcript (FMP), held 9 November 2026
    the funding plan for the note puts, the Long Ridge site's size and the Kearney delays
    The strategy for us is capital light
    backsC36C37
  5. S05primarycompany release2026-08-06
    the earlier lease promise and the Q2 revenue
    backsC16
  6. S06primarycompany release2026-04-30
    the plant's size, its annualised adjusted EBITDA, the debt assumed and the AI build timetable
    backsC18C36
  7. S07primarycompany filing2026-09-25
    the Matagorda milestone payments
    backsC20
  8. S08primarycompany filing2026-11-16
    the $185M 8.75% note add-on and Long Ridge's nine-month results and debt
    backsC19
  9. S09primarycompany filing2026-04-30
    the leaders, insider and institutional ownership, the say-on-pay vote and the pay design
    backsC30C31
  10. S10primaryvendor data2026-11-16
    Research pack for MARA (FMP market tier, FINRA short interest, filed cohort), fetched 17 November 2026
    the 16 November close, market value, the cohort's price to book and sales, ratings, short interest and the returns
    backsC25C26C28C29C32
  11. S11primaryregulator2026-06-18
    the large-load requests and the batch process for connecting them
    ERCOT is tracking more than 438,000 MW of large load requests, nearly 89 percent from data centers alone
    backsC21
  12. S12primarycompany filing2026-11-04
    a rival's 910 MW, 15-year lease and its average yearly rent
    backsC22C23
  13. S14primaryindustry data2026-11-09
    hashprice in dollars and in bitcoin, and the network's 30-day average hash rate
    USD hashprice moved -2.8% from $32.82 per PH/s/Day to a current $31.89 per PH/s/Day.
    backsC07
  14. S15primaryvendor data2026-11-16
    FMP daily bitcoin price (BTCUSD), close of 16 November 2026
    bitcoin's close of $64,849 on 16 November
    backsC07C26
  15. S16primarycompany filing2026-11-04
    Form 4 filings by MARA insiders, read for the Rule 10b5-1 flag (scripts/insider_fetch.py)
    31 open-market sales in the year, all under pre-arranged plans, and no purchases
    backsC32
  16. S17primarycompany filing2026-02-26
    a former self-miner that builds and leases powered data-centre sites
    backsC34
  17. S18primarycompany filing2026-02-27
    a converted miner leasing AI infrastructure on reused industrial sites
    backsC34
  18. S19primarycompany filing2026-08-27
    a miner running its own grid-connected sites for AI cloud customers
    backsC34
  19. S20primarycompany release2026-06-25
    the existing 200 MW of MARA capacity at the Long Ridge site and Long Ridge's adjusted EBITDA bridge
    backsC36