← All thesesVSTAttractiveMedium convictionFriday 13 November 2026עברית

Vistra

This is the archived full research. Read the story

An American power producer: it runs gas, coal and nuclear plants, sells the electricity to 5 million homes and businesses, and uses each side to hedge the other.

Our viewAttractive Medium conviction
The scores
The profile · 1-4
Growth3/4 ↑

Ongoing Operations Adjusted EBITDA is up over 30% YoY, but a material part is Energy Harbor/Lotus/Cogentrix M&A and hedge/price timing, not pure organic volume growth.

Business quality3/4 →

Irreplaceable licensed nuclear/coal plus an integrated retail hedge command real premiums, but untested by the emerging behind-the-meter substitution wave.

Financial position3/4 →

Investment-grade at two of three agencies with $6.3B of liquidity, but net debt rose about $3B in six months as acquisitions and buybacks ran together.

Execution record3/4 →

Guidance held through an ERCOT pullback and the buyback target was hit early, but the post-2021 restructured entity's clean record is still short.

Per share capture4/4 →

171 million shares retired against one small Cogentrix-related issuance - buybacks dominate the share-count trend by a wide margin.

Potential3/4 ↑

A large upside on observable steps - Batch Zero, Cogentrix, uprates - with one piece, the Meta PPA, already committed and in progress.

Risk profile3/4 →

A real regulatory dependency (Batch Zero, PJM tariff filings) and hedge-driven earnings volatility, but diversified across ERCOT/PJM/other ISOs and survivable if either resolves unfavorably.

Valuation4/4 →

About 30% under a base-case fair value of about $173 at an 8% required return: cheap, past the 20% margin of safety.

Evidence quality3/4 →

Central claims are mostly primary filings and transcript, cross-checked externally, but the cohort is thin and the TTM EBITDA figure is hand-computed, not filed.

The Verdict

We rate Vistra Attractive. It runs gas, coal and nuclear plants that nobody can build again soon and sells their power wholesale and to its own retail customers, a solid business. Hedges swing reported profit, but the cash business grew more than 50% in the September quarter. Valued on guided profit, with debt paid first, the shares are worth about $173 against $135. The cushion is thin: part of the growth came from purchases, Texas power prices are softening and new demand may route around the grid. The 2027 range holding is the test.

The long caseAI data centres, factories and a growing population are raising power demand in Texas and the eastern grid faster than in decades, and Vistra's existing plants sell into it.

How we weighed it

The price against our value

In its favour

Price at 78% of our value

The price is still under four-fifths of our value on the guided profit after a quiet rise, with growth slowing and debt paid first, though the cushion has thinned.

The business

In its favour

Solid

Plants nobody can build again soon, supplying power both wholesale and to its own retail customers.

Growth against what the price assumes

Cuts both ways

The guide rose, but partly from plants bought and contracted; new signed data-centre demand is still small.

What could go wrong

Against it

Data centres may make their own power, Texas prices are softening, borrowing rose with buybacks and the grid queue is paused.

Against competitors

Cuts both ways

Rivals' reported profit is distorted by hedges, so the comparison proves little either way.

How its group is behaving

Cuts both ways

Power producers move together on AI demand news; its own fact is its plant base and retail arm.

The latest news and report

In its favour

The latest report passed our test with a higher range; the new signed demand behind it is small.

The evidence under this - 9 claims
C01facthigh confidence
Vistra's generation fleet totals about 43,600 MW: 62% natural gas, 20% coal/lignite, 15% nuclear, 3% solar/battery.
historical · as of 2025-12-31written 2026-09-15
C50facthigh confidence
Q3 2026 Ongoing Operations Adjusted EBITDA was $2,378M versus $1,581M in Q3 2025, up 50.4%; net income was $1,140M including a $559M unrealized hedge gain, and nine-month Ongoing Operations Adjusted EBITDA was $5,639M versus $4,170M.
historical · Q3 2026written 2026-11-06
C05management claimmedium confidence
On 6 November 2026 Vistra initiated 2027 guidance of $7.7-8.5B Ongoing Operations Adjusted EBITDA (midpoint $8.1B) and $4.3-5.1B Ongoing Operations Adjusted FCF before growth, above the $7.4-7.8B midpoint opportunity it had kept in August; that aim excluded Cogentrix and the Meta PPA contributions, and the CFO said on the call that the new range does include the expected Cogentrix contribution and the Meta PPA for the operating capacity at the Perry nuclear plant; neither company gave the split, so how much of the rise over the old aim is acquired is not stated.
against this

The call confirmed the higher range includes the Cogentrix plants closed on 30 October and the Meta PPA, which the old aim excluded, so some of the rise is acquired or contracted rather than a higher view of the old fleet; the 2027 interest expense in the guidance reconciliation is $1,430M, against $829M in the first nine months of 2026 (S24).

  1. 2026-11-06editedthe 6 November release initiated 2027 guidance above the $7.4-7.8B aim
  2. 2026-11-09editedThe Q3 call answered the open question: the 2027 range includes Cogentrix and the Meta Perry PPA, with no split given
forwardwritten 2026-09-15
C06facthigh confidence
Q2 2026 GAAP net income of $305M absorbed a $472M unrealized loss from hedges expected to settle in future years.
historical · Q2 2026written 2026-09-15
C11estimatemedium confidence
Implied EV/TTM Ongoing Operations Adjusted EBITDA is approximately 9.1x ($67.2B over $7,381M), about 21% below the vendor's own reported five-year prior-period median EV/EBITDA of 11.51x; the figure counts Cogentrix debt and cash but not its profit, so it is high.
derivedC09 and C10; the 11.51x prior-period median is the vendor market-tier figure (S16).
against this

The comparison leans on a vendor-reported five-year prior-period median (11.51x) that the pack itself does not fully audit the way it audits current-period figures, and on a hand-computed TTM Adjusted EBITDA (C09) rather than a single disclosed number.

  1. 2026-11-06editedre-struck on the Q3 trailing figure and the 5 November enterprise value: 10.0 became 8.6
  2. 2026-11-09editedRe-struck at the 6 November close when the fair value was added.
current state · 2026-11-06written 2026-09-15
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C19facthigh confidence
Vistra owns six nuclear units at four sites totaling 6,448 MW: Comanche Peak 1&2 in ERCOT (2,400 MW, licensed to 2050/2053), Beaver Valley 1&2, Perry and Davis-Besse in PJM (4,048 MW combined, licensed 2036-2047).
historical · as of 2025-12-31written 2026-09-15
C36factmedium confidence
No nuclear reactors are under construction in the United States today; Vogtle Units 3 and 4 were the only large reactors completed in the US in the past decade, and a stated 2030 policy goal for new reactor construction has not yet resulted in any breaking ground.
current state · 2026-08-24written 2026-09-15
C53inferencemedium confidence
On a three-stage fair value at an 8% required return Vistra is worth about $173 a share against $134.51 at the 12 November close, about 78% of it. Base case: 2025 sales of $17.74B grow 23%, 8% and 5% over three years, then move toward 4% by year ten, each year closing 30% of the gap; the operating margin moves from 20.6% to 27% over five years; each added dollar of sales needs about $1.10 of capital, the average the filings show; a 21% tax rate; then 4% growth for ever at a 12% return on new capital; less debt, preferred and minority interest at 30 June. Bear (no growth after 2026, an 18% margin, new capital earning 8%) gives about $50, bull (12% and 8%, a 31% margin) about $259. As a risk check, at the 10% return asked of a cyclical or indebted business the base case gives about $95.
against this

Trailing GAAP operating income carries hedge marks (C06), so the 20.6% starting margin is itself noisy, and the debt ahead of the shares makes the value sensitive: with no growth after 2026 and an 18% margin it is about $50. Low cash taxes from nuclear credits would lift it above the base case.

  1. 2026-11-09editedRe-struck on the upgraded method: every view read at 9%, the return on new capital set by the moat, and capital per dollar of sales read from the filings.
  2. 2026-11-09editedRe-struck at the 8% required return the owner chose after the roll-out screen: the market priced the median name on the roster at about 7.7%, so 9% on top of a 20% margin read most of it Unattractive.
  3. 2026-11-09editedRe-struck on the decaying fade the owner chose on 9 November: after the stated path each year closes 30% of the gap to 4%, and an analysts' margin is cut by their gap to the filed operating profit.
  4. 2026-11-10editedre-valued on the owner's rules of 10 November: the return on new capital glides to its terminal level over years six to ten
  5. 2026-11-13editedPrice re-read at the 12 November close of $134.51, about 78% of the unchanged base case: still inside the 20% margin of safety.
current state · 2026-11-12written 2026-11-09
01

The company

Vistra's fleet is 62% gas, 20% coal, 15% nuclear and 3% solar and batteries, selling into six American wholesale power markets, mainly Texas's grid, ERCOT, and PJM in the mid-Atlantic and Midwest.

It also sells electricity and gas directly to about 5 million homes and businesses in 18 states and Washington, DC. A buyer who does not use Vistra buys from a rival generator on the same grid, or builds its own plant.

The evidence under this - 2 claims
C01facthigh confidence
Vistra's generation fleet totals about 43,600 MW: 62% natural gas, 20% coal/lignite, 15% nuclear, 3% solar/battery.
historical · as of 2025-12-31written 2026-09-15
C02facthigh confidence
Vistra sells into six US wholesale markets (principally ERCOT and PJM) and serves about 5 million retail electricity and gas customers across 18 states and DC.
current state · 2025-12-31written 2026-09-15

How it makes money

It earns the gap between what it costs to run its plants and what power sells for. Owning both the plants and the customers lets it lock in prices years ahead: when wholesale prices fall, retail margins cushion the blow. The contracts that do that are revalued every quarter, which is why reported profit jumps around while cash does not.

The evidence under this - 3 claims
C02facthigh confidence
Vistra sells into six US wholesale markets (principally ERCOT and PJM) and serves about 5 million retail electricity and gas customers across 18 states and DC.
current state · 2025-12-31written 2026-09-15
C06facthigh confidence
Q2 2026 GAAP net income of $305M absorbed a $472M unrealized loss from hedges expected to settle in future years.
historical · Q2 2026written 2026-09-15
C07facthigh confidence
FY2025 operating revenue growth of $514M (to $17,738M) was reported net of a $1.8B increase in unrealized mark-to-market losses on commodity derivatives embedded in that revenue line.
historical · FY2025written 2026-09-15
Where the money comes from, stream by stream
StreamShare of sales (FY2025)How it earns it
Retail electricity in Texas (ERCOT)50.5%Energy charges billed to homes and businesses through TXU Energy and other brands, per kilowatt-hour delivered.
Retail electricity in the Northeast and Midwest22.9%The same retail service sold under several brands in the deregulated states outside Texas.
Wholesale generation sold into grid markets18.0%Power from its gas, coal, nuclear and solar plants sold to grid operators such as ERCOT and PJM at market prices.
Other wholesale contracts6.5%Ancillary services, auction revenue and sales to other retailers, municipalities and wholesale buyers.
Capacity payments1.3%Net payments from grid operators, mostly PJM, for keeping plants available, after capacity Vistra buys.
Hedging, tax credits and other0.9%Realized hedge gains and transferable nuclear tax credits, offset in 2025 by unrealized hedge losses.

Who runs it

Jim Burke has run Vistra since 2022, after years as its finance and operations chief; Kris Moldovan, a company veteran, has run the money since the same year. On their watch Vistra bought more power plants, signed long nuclear contracts with big tech buyers and beat its own profit forecast. Insiders own under 1% of the company. Bonuses ride on adjusted profit and cash flow; long-term shares on cash flow per share and the stock against the market.

The evidence under this - 3 claims
C47facthigh confidence
James Burke has been president and chief executive since August 1, 2022, after serving as president and chief financial officer from December 2020 and chief operating officer from October 2016; Kristopher Moldovan has been chief financial officer since August 2022, after five years as treasurer; Scott Helm has chaired the board since October 2017.
current state · 2026-03-18written 2026-10-04
C46facthigh confidence
Vistra's 2025 annual bonus paid on Adjusted EBITDA (25%), Adjusted free cash flow before growth (25%), total cost (10%) and generation, retail and stakeholder indices (40%), and funded at 130%; long-term awards are 65% PSUs on three-year Adjusted FCF before growth per share with a plus-or-minus 25% modifier for return against the S&P 500, and 35% RSUs. The 2023 PSUs paid 200% of target.
against this

Both bonus profit metrics exclude unrealized hedge losses and were targeted at the guidance midpoint, which Vistra beat; nothing pays on the return earned on acquisitions, the main use of growth capital.

historical · FY2025written 2026-10-04
C45facthigh confidence
As of March 3, 2026 the 15 directors and executive officers as a group beneficially owned 3,103,579 shares, under 1% of the 338,549,292 outstanding (about 0.9%); chief executive James Burke held 1,513,011 including 331,685 vested options, the largest insider; Vanguard (12.6%), BlackRock (8.4%), Qatar Investment Authority (5.5%) and FMR (5.1%) were the holders above 5%. Vistra has one class of common stock.
current state · 2026-03-03written 2026-10-04
02

Why it wins, and who could beat it

Why customers come back

Its six nuclear reactors, 6,448 MW licensed to run into the 2030s and beyond, cannot be copied: no large reactor is under construction anywhere in the United States, and only two were finished in the past decade.

That scarcity is why a technology company wanting steady, carbon-free power for decades came to Vistra's existing plants, at a price the finance chief called above market, instead of waiting for someone to build new ones.

The evidence under this - 3 claims
C19facthigh confidence
Vistra owns six nuclear units at four sites totaling 6,448 MW: Comanche Peak 1&2 in ERCOT (2,400 MW, licensed to 2050/2053), Beaver Valley 1&2, Perry and Davis-Besse in PJM (4,048 MW combined, licensed 2036-2047).
historical · as of 2025-12-31written 2026-09-15
C36factmedium confidence
No nuclear reactors are under construction in the United States today; Vogtle Units 3 and 4 were the only large reactors completed in the US in the past decade, and a stated 2030 policy goal for new reactor construction has not yet resulted in any breaking ground.
current state · 2026-08-24written 2026-09-15
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15

The threat

Data-centre owners are starting to build their own power. About 2 GW of off-grid generation was running by mid-2026, most of it gas turbines at xAI's sites, and Microsoft and Oracle are pursuing on-site power too. Every data centre powered that way is demand that never reaches Vistra's grid.

The evidence under this - 1 claim
C35factmedium confidence
Behind-the-meter, off-grid generation for data centers is scaling: about 2 GW was online by mid-2026, the vast majority of it xAI's Colossus gas-turbine sites, with other hyperscalers including Microsoft and Oracle (via a large Bloom Energy contract) separately pursuing on-site power for new capacity.
against this

Behind-the-meter capacity (about 3 GW by year-end 2026) remains a small fraction of the 12-15 GW of realistic new ERCOT load alone (C29), and cannot serve Vistra's 5-million-customer retail book or offer investment-grade counterparty risk transfer the way a PPA does (machine.threat.not_substituted).

current state · 2026-08-24written 2026-09-15

The rivals: SPCX, BE, MSFT, NRG, CEG, TLN.

Who else does this, rival by rival
TickerRivalHow far alongPriced against it
SPCXxAI (Colossus 1 and 2 gas-turbine sites near Memphis)Priced against it: Different productOn saleDifferent product
BEBloom Energy (fuel-cell systems; 2.8 GW master agreement with Oracle within $7.65B of 2026 data-center contracts)Priced against it: Different productOn saleDifferent product
MSFTMicrosoft (announced gas-turbine-powered data-center sites)Priced against it: Different productAnnouncedDifferent product
NRGNRG EnergyPriced against it: YesOn saleYes
CEGConstellation EnergyPriced against it: YesOn saleYes
TLNTalen EnergyPriced against it: No usable figureOn saleNo usable figure
03

How big it could get

How big this could get

Demand is rising after decades of flat growth. Texas's grid peaked at 83.7 GW in 2025 and above 91 GW in July 2026, and its planners point to about 152 GW by 2030.

The queue of requests to connect large new users there is reported near 410 GW, mostly data centres. Vistra's own chief executive thinks only 12 GW to 15 GW of that is realistic by 2030.

The evidence under this - 4 claims
C26facthigh confidence
ERCOT's 2025 peak demand was about 83,707 MW serving roughly 27 million Texas customers (about 90% of the state's load); ERCOT set a new all-time peak above 91 GW in July 2026.
historical · 2025 and July 2026written 2026-09-15
C31factmedium confidence
ERCOT's own transmission planning has pointed to systemwide new load reaching roughly 152 GW by 2030.
forwardwritten 2026-09-15
C28factmedium confidence
ERCOT's large-load interconnection queue has been reported at 410 GW of requests, about 87% of which are data centers.
current state · 2026-04-01written 2026-09-15
C29management claimlow confidence
Vistra's CEO reiterated the company's unchanged May-2024 forecast of 115-120 GW of total ERCOT load by 2030, and stated his own view that only about 12-15 GW of the queue reflects realistic, contractable load by 2030 - calling the headline queue overstated by more than 20 times.
against this

This 12-15 GW figure is Vistra's own filtering of the queue and is not independently verifiable; ERCOT and the Public Utility Commission of Texas's own Batch Zero audit (C32) exists precisely because nobody outside the generators has published a verified conversion rate from queue to real load (see machine.prize.composed_route).

forwardwritten 2026-09-15

Who has signed

One large buyer. Meta signed 20-year agreements for 2,609 MW from Vistra's nuclear plants in the PJM region, starting late 2026. Everything else in the data-centre story, including all of Texas, is still in negotiation.

The evidence under this - 1 claim
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15
04

The results

The numbers

Is it growing?Steady

Sales grew 20% over the twelve months to Sep 2026, faster than the 3.0% in the year to Dec 2025.

Dec 2021: $12.1BDec 2022: $13.7BDec 2023: $14.8BDec 2024: $17.2BDec 2025: $17.7B12 mo to Sep 2026: $20.6B$12.1B$20.6B
Is it profitable?Strong

Operating margin is 21%, up from 18% in the year to Dec 2023.

Dec 2021: −13%Dec 2022: −8.6%Dec 2023: 18%Dec 2024: 24%Dec 2025: 11%12 mo to Sep 2026: 21%−13%21%
How steady is it?Steady

Yearly sales growth has ranged from +3.0% to +17% over the last 5 years.

Dec 2021: +5.5%Dec 2022: +14%Dec 2023: +7.7%Dec 2024: +17%Dec 2025: +3.0%+5.5%+3.0%
Does it earn good returns?Decent

Each dollar put into the business earns 14% a year after tax, about where it was (11%) in the year to Dec 2023.

Dec 2023: 11%Dec 2024: 16%Dec 2025: 7.0%12 mo to Sep 2026: 14%11%14%
Is it making cash?Solid

It turned 13% of sales into free cash, $2.61B over the last twelve months, after spending 15% of sales on buildings and equipment.

Dec 2021: −$1.24BDec 2022: −$816MDec 2023: $3.78BDec 2024: $2.48BDec 2025: $1.32B12 mo to Sep 2026: $2.61B−$1.24B$2.61B
Is the balance sheet safe?Heavy debt

It owes $18.4B more than the cash it holds, about 3.2 years of the cash its operations bring in.

Dec 2021: −$9.41BDec 2022: −$12.2BDec 2023: −$10.9BDec 2024: −$15.1BDec 2025: −$18.1B12 mo to Sep 2026: −$18.4B−$9.41B−$18.4B
Are shares being diluted?Shrinking

The share count fell 30% in 4.8 years, and pay in shares costs 0.6% of sales.

Dec 2021: 482MDec 2022: 422MDec 2023: 375MDec 2024: 353MDec 2025: 346M12 mo to Sep 2026: 338M482M338M
All the numbers

Filed figures from the company's 10-K and 10-Q, read 2026-11-10. Fiscal years end in December.

Dec 2021Dec 2022Dec 2023Dec 2024Dec 202512 mo to Sep 2026
Size and growth
Sales$12.1B$13.7B$14.8B$17.2B$17.7B$20.6B
Sales growth+5.5%+14%+7.7%+17%+3.0%+20%
Profit
Operating margin−13%−8.6%18%24%11%21%
Net margin−11%−8.9%10%15%5.3%13%
What growth costs, per sales dollar
Selling, general and admin8.6%8.7%8.9%9.3%9.7%8.4%
Pay in shares0.4%0.5%0.5%0.6%0.6%0.6%
Capital spending8.6%9.5%11%12%16%15%
Cash
Cash from operations−$206M$485M$5.45B$4.56B$4.07B$5.76B
Free cash flow−$1.24B−$816M$3.78B$2.48B$1.32B$2.61B
Balance sheet
Cash and short-term investments$1.32B$455M$3.48B$1.19B$785M$2.74B
Debt$10.7B$12.6B$14.4B$16.3B$18.8B$21.1B
Net cash−$9.41B−$12.2B−$10.9B−$15.1B−$18.1B−$18.4B
Returns and shares
Return on capital--11%16%7.0%14%
Shares (diluted)482M422M375M353M346M338M

What growth costs

Running Vistra gets no cheaper as it grows: office and selling costs rise in step with sales. Growth costs capital instead, buying plants and spending more each year upgrading them, so whether growing makes it more profitable depends on what those plants earn, which the reported figures, swung by hedging gains and losses, do not yet show.

The evidence under this - 2 claims
C43facthigh confidence
Per sales dollar, selling, general and administrative costs were 9.0 cents in 2020, 8.6 to 8.9 cents in 2021 to 2023, 9.3 in 2024, 9.7 in 2025 and 9.0 over the four quarters to June 2026, while capital spending rose from 8.6 cents in 2021 to 15.5 in 2025 and 14.9 over the four quarters, and stock pay stayed under one cent; revenue rose from $11,443M in 2020 to $17,738M in 2025.
against this
  • Revenue carries unrealized hedge marks, a $766M loss in 2025 against a $1,013M gain in 2024 (C07, C42), so every per-sales-dollar ratio moves with commodity prices as well as with costs.
  • The 2025 pay plan's total-cost metric missed its threshold, on growth projects, the Martin Lake 1 repair and integration costs (S20), so costs outside SG&A did rise faster than planned.
historical · 2020 to the four quarters to June 2026written 2026-10-04
C44inferencemedium confidence
Vistra's growth is bought with capital rather than overhead: acquisitions (Energy Harbor in 2024, Lotus in 2025, Cogentrix pending) and rising plant spending carry it while SG&A holds near nine cents per sales dollar, so whether growth widens the margin depends on what the bought and upgraded plants earn, which GAAP margins swung by hedge marks cannot show.
derivedC43's cost ratios, the acquisitions in C22, C21 and C48, and the hedge marks in C07 and C42
historical · 2020 to the four quarters to June 2026written 2026-10-04

The last report (6 Nov)

Quarter ended September 2026, filed figures.

28%
Sales growth
against the same quarter a year earlier
58.0%
Growth from the quarter before
against -28.8% the quarter before that
27¢
Operating profit
per dollar of sales

The September 2026 quarter beat on every measure we watch. Underlying profit, the company's own measure without hedge swings, rose to $2,378M from $1,581M, and reported profit was $1,140M, helped by a $559M paper gain on hedges.

Vistra raised the middle of its 2026 forecast to $7.1B to $7.5B and gave its first 2027 forecast, $7.7B to $8.5B, above the $7.4B to $7.8B aim it had held. It added $1.5B to its buyback and signed a 20-year, 207 MW power deal in Texas. On the call it said the 2027 range includes the Cogentrix plants and the Meta deal, without saying how much each adds.

What it did to the thesisIt passed the test we set, with a caveat: the higher 2027 range includes bought and newly contracted plants the old aim left out. New signed demand is small, and debt stays moderate, so the view and conviction hold.

The quarter in detail

Sales growth from the previous quarter, filed figures.

Earnings per share $3.23 against $2.98 expected.

The evidence under this - 5 claims
C50facthigh confidence
Q3 2026 Ongoing Operations Adjusted EBITDA was $2,378M versus $1,581M in Q3 2025, up 50.4%; net income was $1,140M including a $559M unrealized hedge gain, and nine-month Ongoing Operations Adjusted EBITDA was $5,639M versus $4,170M.
historical · Q3 2026written 2026-11-06
C04management claimmedium confidence
On 6 November 2026 Vistra narrowed and raised the midpoint of 2026 guidance to $7.1-7.5B Ongoing Operations Adjusted EBITDA (from $6.8-7.6B) and $4.3-4.7B Ongoing Operations Adjusted FCF before growth (from $3.925-4.725B).
against this

Nine-month Ongoing Operations Adjusted EBITDA was $5,639M, so the range implies $1,461M to $1,861M for the fourth quarter against $2,378M in the third, and the fourth quarter carries Cogentrix for two months (S24).

  1. 2026-11-06editedthe 6 November release narrowed 2026 guidance and raised its midpoint
forwardwritten 2026-09-15
C05management claimmedium confidence
On 6 November 2026 Vistra initiated 2027 guidance of $7.7-8.5B Ongoing Operations Adjusted EBITDA (midpoint $8.1B) and $4.3-5.1B Ongoing Operations Adjusted FCF before growth, above the $7.4-7.8B midpoint opportunity it had kept in August; that aim excluded Cogentrix and the Meta PPA contributions, and the CFO said on the call that the new range does include the expected Cogentrix contribution and the Meta PPA for the operating capacity at the Perry nuclear plant; neither company gave the split, so how much of the rise over the old aim is acquired is not stated.
against this

The call confirmed the higher range includes the Cogentrix plants closed on 30 October and the Meta PPA, which the old aim excluded, so some of the rise is acquired or contracted rather than a higher view of the old fleet; the 2027 interest expense in the guidance reconciliation is $1,430M, against $829M in the first nine months of 2026 (S24).

  1. 2026-11-06editedthe 6 November release initiated 2027 guidance above the $7.4-7.8B aim
  2. 2026-11-09editedThe Q3 call answered the open question: the 2027 range includes Cogentrix and the Meta Perry PPA, with no split given
forwardwritten 2026-09-15
C51facthigh confidence
On 6 November 2026 Vistra announced a 20-year, 207 MW power purchase agreement with New Era Energy and Digital at its Odessa combined-cycle gas plant in Texas, and began operating its 405 MW Pulaski solar plant (Microsoft agreement) and 100 MW Deer Creek solar and storage plant; the new signed load is small beside the several gigawatts C29 and P2 need.
historical · Q3 2026written 2026-11-06
C52management claimmedium confidence
On the Q3 2026 call management said pro forma for Cogentrix and the preferred redemption net debt to adjusted EBITDA is about 2.8 times, with investment-grade ratings from two of three agencies; that Cogentrix was bought at about $729 a kilowatt and its expected contribution has improved since announcement; that adjusted free cash flow before growth per share goes from just under $10.5 in 2025 to about $14 in 2027; that the Texas large-load audit hold is expected to lift around mid-December; that ERCOT forward prices are depressed by slower load growth, which the 2030 outlook does not assume recovers; and that Rumford, a Cogentrix plant, is to be sold.
against this

Management gave no quantified Cogentrix contribution to 2027 and no new signed load beyond the 207 MW deal, and said ERCOT forwards are depressed, so the per-share path leans on buybacks and assets not yet contracted.

forwardwritten 2026-11-09
What management did with the money

It has bought back about 30% of its shares since November 2021, at an average of about $38, and has $1.2B of authority left. It has also bought Cogentrix's 10 gas plants, closed on 30 October, for about $2.3B in cash plus shares. Debt rose to $19.6B from $17.0B in six months.

The evidence under this - 4 claims
C13facthigh confidence
Vistra has retired about 171 million shares since November 2021 at an average cost of about $38 per share, returning $6.5B to shareholders through August 3, 2026, a roughly 30% reduction in shares outstanding.
historical · November 2021 - August 2026written 2026-09-15
C14management claimmedium confidence
About $2.5B of buyback authorization remained at 2 November 2026 after the board added $1.5B on 6 November, expected to be used no later than year-end 2028; Vistra has repurchased about $6.7B of stock since November 2021 and has about 339M shares outstanding, 30% fewer than then.
against this

Management's own language - 'we expect to exhaust that no later than end of 2027' - is itself a target, not a commitment, and the same capital could instead go to additional debt paydown if the investment-grade ratings push takes priority, which management named as a live alternative use of cash.

  1. 2026-11-06editedthe 6 November release added $1.5B to the buyback authorization
forwardwritten 2026-09-15
C21facthigh confidence
Vistra completed the acquisition of Cogentrix Energy on 30 October 2026 (10 gas facilities, about 5,500 MW across PJM, ISO-NE and one ERCOT cogeneration facility, bought from Quantum Capital funds) after all regulatory approvals; the agreed price was approximately $2.3B cash net of an estimated $1.5B of assumed debt plus 5,000,000 Vistra shares.
  1. 2026-10-30editedThe acquisition closed on 30 October 2026, inside the mid-to-late 2026 window; the claim moves from forward to historical.
historical · 2026-10-30written 2026-09-15
C16facthigh confidence
Long-term debt including amounts due currently rose to $19,595M at June 30, 2026 from $17,043M at December 31, 2025.
current state · 2026-06-30written 2026-09-15
05

The price, and where we disagree

In short. Cheap. Below its own history, and about 78% of what we think the business is worth: inside our cushion, if only just.

Share price
$136.21
close,
Company value for each $1 of cash profit
21.1
rivals' middle 14.1

Most coverage calls Vistra an AI-power play, and the standard price-to-earnings figure makes it look expensive. That figure is struck on the distorted reported profit. On underlying profit the whole company cost about 9.1 times the last year's at the 6 November close, after the shares fell about 30% from 9 October while the forecast went up; they closed at $134.51 on 12 November.

The next test is the year-end results in February 2027: whether the 2027 range holds and what signed demand has been added.

The evidence under this - 3 claims
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C11estimatemedium confidence
Implied EV/TTM Ongoing Operations Adjusted EBITDA is approximately 9.1x ($67.2B over $7,381M), about 21% below the vendor's own reported five-year prior-period median EV/EBITDA of 11.51x; the figure counts Cogentrix debt and cash but not its profit, so it is high.
derivedC09 and C10; the 11.51x prior-period median is the vendor market-tier figure (S16).
against this

The comparison leans on a vendor-reported five-year prior-period median (11.51x) that the pack itself does not fully audit the way it audits current-period figures, and on a hand-computed TTM Adjusted EBITDA (C09) rather than a single disclosed number.

  1. 2026-11-06editedre-struck on the Q3 trailing figure and the 5 November enterprise value: 10.0 became 8.6
  2. 2026-11-09editedRe-struck at the 6 November close when the fair value was added.
current state · 2026-11-06written 2026-09-15
C05management claimmedium confidence
On 6 November 2026 Vistra initiated 2027 guidance of $7.7-8.5B Ongoing Operations Adjusted EBITDA (midpoint $8.1B) and $4.3-5.1B Ongoing Operations Adjusted FCF before growth, above the $7.4-7.8B midpoint opportunity it had kept in August; that aim excluded Cogentrix and the Meta PPA contributions, and the CFO said on the call that the new range does include the expected Cogentrix contribution and the Meta PPA for the operating capacity at the Perry nuclear plant; neither company gave the split, so how much of the rise over the old aim is acquired is not stated.
against this

The call confirmed the higher range includes the Cogentrix plants closed on 30 October and the Meta PPA, which the old aim excluded, so some of the rise is acquired or contracted rather than a higher view of the old fleet; the 2027 interest expense in the guidance reconciliation is $1,430M, against $829M in the first nine months of 2026 (S24).

  1. 2026-11-06editedthe 6 November release initiated 2027 guidance above the $7.4-7.8B aim
  2. 2026-11-09editedThe Q3 call answered the open question: the 2027 range includes Cogentrix and the Meta Perry PPA, with no split given
forwardwritten 2026-09-15
How we value it
Method
Cash the business will produce, in three stages
Required return
8%
Long-run growth
4%
Moat
An average moat
BearBaseBull
Sales growth, years 1 to 323%, 0%, 0%23%, 8%, 5%23%, 12%, 8%
Normal operating margin18%27%31%
Return on new capital after year ten8%12%15%
Value a share$48.41$173$259
Price
$135
Priced on
12 Nov
Price as a share of the base value
78%
Starting growth the price pays for
3.7%
Yearly return the price offers on the base case
8.7%
Risk check: valued at 10%, the rate for a cyclical or indebted business
$91.08

Where each figure comes from

FigureSourceWhere exactly
Sales, the last full yearFiled reportAnnual report (10-K) for the period to 31 Dec 2025, filed 27 Feb 2026; the full year.
Operating margin todayFiled reportQuarterly report (10-Q) for the period to 30 Sep 2026, filed 9 Nov 2026; the four quarters to that date.
Tax rateOur judgementOur reading of the evidence.
Sales per dollar of new capitalFiled reportAnnual report (10-K) for the period to 31 Dec 2025, filed 27 Feb 2026: the year's sales over its operating capital.
SharesFiled reportQuarterly report (10-Q) for the period to 30 Sep 2026, filed 9 Nov 2026; the diluted share count.
Cash and investmentsFiled reportQuarterly report (10-Q) for the period to 30 Sep 2026, filed 9 Nov 2026; the balance sheet on that date.
DebtFiled reportQuarterly report (10-Q) for the period to 30 Sep 2026, filed 9 Nov 2026; the balance sheet on that date.
Sales growth, years 1 to 3Our judgementOur reading of the evidence, set against the analysts' forecasts and the company's guidance; the base case below says where it follows them and where it departs. FMP's consensus of 5 to 10 analysts read 12.3%, 5.5%, 2.7%.
Normal operating marginOur judgementOur reading of the evidence; each case below names it. FMP's consensus, less stock pay, read 13.9%.
Return on new capital after year tenOur method's ruleSet by our reading of the moat: the 8% rate with none, 12% with an average one, 15% with a strong one; the bear case earns the rate.
The bear and bull casesOur judgementOur reading of the evidence; each case below names it.
PriceMarket priceFMP's closing price on 6 Nov 2026.
Preferred stockFiled reportQuarterly report (10-Q) for the period to 30 Sep 2026, filed 9 Nov 2026; the balance sheet on that date.
Minority interestFiled reportRead by hand from the filed statements; the period it was read from was not recorded.

What each case rests on

Bear caseTexas power prices keep softening on batteries (C34) and only about 12-15 GW of the load queue is real (C29): sales stop growing after 2026, the margin falls to 18%, and new capital earns only 9%.

Base case2026 grows 23% to about $21.9B, the analysts' figure behind the raised $7.1-7.5B guide (C04); 2027 8%, matching the $7.7-8.5B range (C05); then 5%; the operating margin rises to 27% from 20.6% as the 20-year Meta nuclear contract (C20) and data-centre deals reprice the fleet.

Bull caseMore signed data-centre load beyond Meta lifts 2027 to 12% and 2028 to 8%, and the margin reaches 31%, about the analysts' 2030 figure of $7.9B of operating profit on $26.1B of sales.

What moves the base value

LowerHigher
Growth in years 1 to 3, a quarter lower or higher$156$191
The normal margin, 15% lower or higher$136$210
Capital per dollar of growth, a quarter more or less$163$179
Return on new capital after year ten, at the rate or one step up$126$192
The rate, a point higher or lower$124$254
Long-run growth a point lower$150-

Value a share as growth and margin change

Normal margin ↓ · growth →50%75%100%125%150%
21.6%$100$111$124$137$151
24.3%$120$134$148$164$180
27%$140$156$173$191$210
29.7%$160$178$197$218$240
32.4%$181$200$222$245$269

Growth is shown as a share of the base case's. Green: the price is at or under 80% of that value. Red: at or over 120%.

How we read the multiple

At the 6 November close, counting its debt, the whole company cost about $67B, roughly 9.1 times the last twelve months' underlying profit before interest, tax and depreciation of about $7.4B.

Valued on that profit growing as guided and then slowing to 4% over ten years, with $24.9B of debt paid first, the shares are worth about $173. At $134.51 on 12 November the price is about 78% of that: just inside our 20% margin of safety.

Against its own history. Well below its own normal on underlying profit. The reported figure makes it look dear, but that comes from paper losses on hedges, not the business.

The evidence under this - 6 claims
C53inferencemedium confidence
On a three-stage fair value at an 8% required return Vistra is worth about $173 a share against $134.51 at the 12 November close, about 78% of it. Base case: 2025 sales of $17.74B grow 23%, 8% and 5% over three years, then move toward 4% by year ten, each year closing 30% of the gap; the operating margin moves from 20.6% to 27% over five years; each added dollar of sales needs about $1.10 of capital, the average the filings show; a 21% tax rate; then 4% growth for ever at a 12% return on new capital; less debt, preferred and minority interest at 30 June. Bear (no growth after 2026, an 18% margin, new capital earning 8%) gives about $50, bull (12% and 8%, a 31% margin) about $259. As a risk check, at the 10% return asked of a cyclical or indebted business the base case gives about $95.
against this

Trailing GAAP operating income carries hedge marks (C06), so the 20.6% starting margin is itself noisy, and the debt ahead of the shares makes the value sensitive: with no growth after 2026 and an 18% margin it is about $50. Low cash taxes from nuclear credits would lift it above the base case.

  1. 2026-11-09editedRe-struck on the upgraded method: every view read at 9%, the return on new capital set by the moat, and capital per dollar of sales read from the filings.
  2. 2026-11-09editedRe-struck at the 8% required return the owner chose after the roll-out screen: the market priced the median name on the roster at about 7.7%, so 9% on top of a 20% margin read most of it Unattractive.
  3. 2026-11-09editedRe-struck on the decaying fade the owner chose on 9 November: after the stated path each year closes 30% of the gap to 4%, and an analysts' margin is cut by their gap to the filed operating profit.
  4. 2026-11-10editedre-valued on the owner's rules of 10 November: the return on new capital glides to its terminal level over years six to ten
  5. 2026-11-13editedPrice re-read at the 12 November close of $134.51, about 78% of the unchanged base case: still inside the 20% margin of safety.
current state · 2026-11-12written 2026-11-09
C10estimatehigh confidence
Enterprise value is approximately $67.2B: market cap $42.3B (339M shares at the $124.80 close of 6 November) plus pro forma net debt of about $24.9B, being the $20,027M at 30 June plus about $3.9B for the Cogentrix purchase ($2.2B cash and $1.7B of assumed debt repaid) and $1.0B to redeem the Series A preferred.
derived10-Q balance sheet at 30 June (S02), the Q3 release's Cogentrix, preferred and share-count statements (S24) and the 6 November close; the 30 September balance sheet is not yet filed, so Q3 cash flow is not credited.
against this

Net debt is the 30 June figure moved only by the events the release names, so it takes no credit for Q3 cash flow and is likely a little high; the 10-Q will replace it.

  1. 2026-11-06editedre-struck at the 5 November close, pro forma for Cogentrix and the preferred redemption, because the Q3 balance sheet is not yet filed
  2. 2026-11-09editedRe-struck at the 6 November close when the fair value was added.
current state · 2026-11-06written 2026-09-15
C09estimatemedium confidence
TTM Ongoing Operations Adjusted EBITDA through Q3 2026 is approximately $7,381M, computed as FY2025 ongoing-ops EBITDA ($5,912M) minus nine months 2025 ($4,170M) plus nine months 2026 ($5,639M); it excludes Cogentrix, which closed on 30 October.
derivedC08 plus the nine-month 2025 ($4,170M) and 2026 ($5,639M) Ongoing Operations Adjusted EBITDA figures in the Q3 2026 release (S24).
against this

This is a hand-computed TTM figure, not a single filed number - it depends on H1 2025/H1 2026 Ongoing Operations figures being genuinely comparable across two different guidance vintages and any quarterly restatement between them would move it without a corresponding filing to flag it.

  1. 2026-11-06editedthe Q3 release lets the trailing figure roll to September 2026
current state · 2026-09-30written 2026-09-15
C11estimatemedium confidence
Implied EV/TTM Ongoing Operations Adjusted EBITDA is approximately 9.1x ($67.2B over $7,381M), about 21% below the vendor's own reported five-year prior-period median EV/EBITDA of 11.51x; the figure counts Cogentrix debt and cash but not its profit, so it is high.
derivedC09 and C10; the 11.51x prior-period median is the vendor market-tier figure (S16).
against this

The comparison leans on a vendor-reported five-year prior-period median (11.51x) that the pack itself does not fully audit the way it audits current-period figures, and on a hand-computed TTM Adjusted EBITDA (C09) rather than a single disclosed number.

  1. 2026-11-06editedre-struck on the Q3 trailing figure and the 5 November enterprise value: 10.0 became 8.6
  2. 2026-11-09editedRe-struck at the 6 November close when the fair value was added.
current state · 2026-11-06written 2026-09-15
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C41facthigh confidence
NRG Energy, Talen Energy and Constellation Energy each describe themselves, in their own FY2025 10-Ks, as generation-plus-retail or wholesale merchant power businesses selling into the same kind of ISO markets Vistra sells into, and were identified as cohort peers on that basis since Vistra's own 10-K names only competitor classes.
current state · 2026-08-24written 2026-09-15
Priced against its rivals

The competitors its own annual report names, each confirmed against the rival's filing. Measured on company value for each $1 of cash profit, cheapest first:

TickerCompanycompany value for each $1 of cash profit
NRGNRG Energy11.3×
CEGConstellation Energy16.8×
VSTVistra21.1×
TLNTalen Energy held outnot priced

The middle of the other 2 is 14.1. Vistra Corp. is dearest of 3.

Rivals' figures come from a data provider, so read the spread of the group rather than any single pair.

The rivals' figures are struck on reported profit, which the hedges distort, so the comparison proves little either way and cannot move our view.

Where we disagree with the market

The market believes

An AI-power story, with a high price-to-earnings figure showing the market has already paid up for it.

We believe

The reported swings are mostly hedge accounting. On what the business actually earns, the market has not paid for the AI story at all.

The gap sits in a reconciliation table few people read, and even the data vendor's comparison with rivals uses the distorted figure.

The case against us: most AI demand is unsigned, Texas power prices for future delivery have softened, and data centres can build their own plants. A cut to the 2027 aim, rather than softer words, would prove us wrong.

What analysts say, and the evidence
The evidence under this - 4 claims
C12inferencemedium confidence
The vendor-reported cohort EV/EBITDA multiple for VST of 21.1x is a GAAP figure and is inflated by unrealized hedge mark-to-market losses embedded in the trailing GAAP EBITDA base it is struck on.
derivedC06 and C07 show GAAP operating results carrying large unrealized hedge marks that Ongoing Operations Adjusted EBITDA excludes; the vendor cohort figure (S16) is computed on GAAP, not Adjusted, EBITDA.
against this

The vendor's separate top-level market-tier EV/EBITDA of 10.07x (S16) is close to the hand-computed Adjusted figure (C11), so not every vendor EBITDA field is equally distorted - the cohort-specific 21.1x figure appears to draw on a different, more GAAP-exposed quarter mix than the smoothed top-level ratio.

current state · 2026-08-24written 2026-09-15
C05management claimmedium confidence
On 6 November 2026 Vistra initiated 2027 guidance of $7.7-8.5B Ongoing Operations Adjusted EBITDA (midpoint $8.1B) and $4.3-5.1B Ongoing Operations Adjusted FCF before growth, above the $7.4-7.8B midpoint opportunity it had kept in August; that aim excluded Cogentrix and the Meta PPA contributions, and the CFO said on the call that the new range does include the expected Cogentrix contribution and the Meta PPA for the operating capacity at the Perry nuclear plant; neither company gave the split, so how much of the rise over the old aim is acquired is not stated.
against this

The call confirmed the higher range includes the Cogentrix plants closed on 30 October and the Meta PPA, which the old aim excluded, so some of the rise is acquired or contracted rather than a higher view of the old fleet; the 2027 interest expense in the guidance reconciliation is $1,430M, against $829M in the first nine months of 2026 (S24).

  1. 2026-11-06editedthe 6 November release initiated 2027 guidance above the $7.4-7.8B aim
  2. 2026-11-09editedThe Q3 call answered the open question: the 2027 range includes Cogentrix and the Meta Perry PPA, with no split given
forwardwritten 2026-09-15
C35factmedium confidence
Behind-the-meter, off-grid generation for data centers is scaling: about 2 GW was online by mid-2026, the vast majority of it xAI's Colossus gas-turbine sites, with other hyperscalers including Microsoft and Oracle (via a large Bloom Energy contract) separately pursuing on-site power for new capacity.
against this

Behind-the-meter capacity (about 3 GW by year-end 2026) remains a small fraction of the 12-15 GW of realistic new ERCOT load alone (C29), and cannot serve Vistra's 5-million-customer retail book or offer investment-grade counterparty risk transfer the way a PPA does (machine.threat.not_substituted).

current state · 2026-08-24written 2026-09-15
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15
06

What could go wrong, and how we would know

The risks

  • Demand that routes around it. Data-centre owners building their own gas turbines or fuel cells never need to buy from Vistra's grid.
  • Softer Texas prices. Battery buildout and a market redesign have lowered Texas power prices, and forecasts for 2026 demand growth were cut.
  • Debt and buybacks together. Borrowing rose $2.6B in the six months to June, and the Cogentrix purchase and a $1B preferred redemption since add about $4.9B, while buybacks continue.
  • A paused connection queue. A Texas audit has paused reviews of large new users, and it has already run longer than management expected.
The evidence under this - 8 claims
C35factmedium confidence
Behind-the-meter, off-grid generation for data centers is scaling: about 2 GW was online by mid-2026, the vast majority of it xAI's Colossus gas-turbine sites, with other hyperscalers including Microsoft and Oracle (via a large Bloom Energy contract) separately pursuing on-site power for new capacity.
against this

Behind-the-meter capacity (about 3 GW by year-end 2026) remains a small fraction of the 12-15 GW of realistic new ERCOT load alone (C29), and cannot serve Vistra's 5-million-customer retail book or offer investment-grade counterparty risk transfer the way a PPA does (machine.threat.not_substituted).

current state · 2026-08-24written 2026-09-15
C33factmedium confidence
ERCOT implemented its RTC+B (Real-Time Co-optimization Plus Batteries) market redesign on December 5, 2025, removing the ORDC scarcity-price adder from energy prices and replacing it with Ancillary Service Demand Curve adders, which pay only for delivered service rather than for standing by during scarcity.
historical · 2025-12-05written 2026-09-15
C34management claimmedium confidence
Management attributes softer 2026 ERCOT day-ahead pricing partly to post-2023 battery buildout, noting battery investors have realized about a fifth of expected returns and that battery interconnection queue growth is slowing as a result.
current state · 2026-08-07written 2026-09-15
C30factmedium confidence
EIA's latest outlook revised its ERCOT electricity demand growth forecast down to 5% for 2025 (from 6%) and 9.6% for 2026 (from an earlier 15.7% estimate); EIA separately expects more modest, continued demand growth in PJM over the same period.
forwardwritten 2026-09-15
C16facthigh confidence
Long-term debt including amounts due currently rose to $19,595M at June 30, 2026 from $17,043M at December 31, 2025.
current state · 2026-06-30written 2026-09-15
C14management claimmedium confidence
About $2.5B of buyback authorization remained at 2 November 2026 after the board added $1.5B on 6 November, expected to be used no later than year-end 2028; Vistra has repurchased about $6.7B of stock since November 2021 and has about 339M shares outstanding, 30% fewer than then.
against this

Management's own language - 'we expect to exhaust that no later than end of 2027' - is itself a target, not a commitment, and the same capital could instead go to additional debt paydown if the investment-grade ratings push takes priority, which management named as a live alternative use of cash.

  1. 2026-11-06editedthe 6 November release added $1.5B to the buyback authorization
forwardwritten 2026-09-15
C21facthigh confidence
Vistra completed the acquisition of Cogentrix Energy on 30 October 2026 (10 gas facilities, about 5,500 MW across PJM, ISO-NE and one ERCOT cogeneration facility, bought from Quantum Capital funds) after all regulatory approvals; the agreed price was approximately $2.3B cash net of an estimated $1.5B of assumed debt plus 5,000,000 Vistra shares.
  1. 2026-10-30editedThe acquisition closed on 30 October 2026, inside the mid-to-late 2026 window; the claim moves from forward to historical.
historical · 2026-10-30written 2026-09-15
C32management claimmedium confidence
A Texas Governor-directed audit paused PUC/ERCOT review of the large-load interconnection queue ("Batch Zero") for what management expects to be a couple of months as of August 2026; management does not expect its Comanche Peak-area project (targeted to energize end of 2027) to be affected, though nearer-term (2026) projects elsewhere could see delay.
against this

Management's own framing is self-interested - no company facing a queue audit would forecast material harm to its own timeline on the call announcing it - and the audit's scope and duration were still undefined at the time of the call.

current state · 2026-08-07written 2026-09-15
What we still do not know
  • How much Texas data-centre demand gets signed. There is no signed Texas deal of Meta's size yet.
  • What Cogentrix's existing power contracts carry. They are private and not separately disclosed.
The evidence under this - 2 claims
C20facthigh confidence
Vistra signed 20-year power purchase agreements with Meta for 2,609 MW of carbon-free power and capacity from its PJM nuclear plants (2,176 MW already operating, 433 MW from planned uprates), with operating delivery starting late 2026 and full delivery by 2027, and uprate delivery starting 2031 through 2034; the CFO described the pricing as a premium above market.
against this

This is the only publicly quantified large signed data-center commitment across Vistra's entire ERCOT/PJM footprint; there is no comparably sized signed PPA disclosed in ERCOT specifically.

forwardwritten 2026-09-15
C21facthigh confidence
Vistra completed the acquisition of Cogentrix Energy on 30 October 2026 (10 gas facilities, about 5,500 MW across PJM, ISO-NE and one ERCOT cogeneration facility, bought from Quantum Capital funds) after all regulatory approvals; the agreed price was approximately $2.3B cash net of an estimated $1.5B of assumed debt plus 5,000,000 Vistra shares.
  1. 2026-10-30editedThe acquisition closed on 30 October 2026, inside the mid-to-late 2026 window; the claim moves from forward to historical.
historical · 2026-10-30written 2026-09-15

What would change our view

  1. Attractive→NeutralThe price rises within 20% of fair value

    It needs:

    • ○The share price rises to about $138, 80% of what we think the business is worth, so it is no longer cheap enough.about ≈$136.90 today, 1% above the last close
  2. Attractive→UnattractiveThe forecast the price pays for is cut

    It needs:

    • ○The 2027 profit forecast of $7.7B to $8.5B is cut, not just talked down, because realised power prices fell.checked at the next results, due by 26 Feb
  3. Attractive→UnattractiveThe price runs 20% above fair value

    It needs:

    • ○The share price rises to about $207, 20% above what we think the business is worth.about ≈$181.69 today, 33% above the last close
We would also be wrong if
  • The Cogentrix plants or the nuclear upgrades for Meta slip or are repriced.
  • Debt grows faster than profit as buybacks and borrowing-funded growth continue together.
  • Building power on site becomes the normal way to supply a new data centre, bypassing the grid.

What is coming

  • 15 December 2026 Series B preferred first reset date: Whether the second $1.0B of preferred is redeemed, completing the swap of preferred for junior notes.
Every dated event ahead
  • 15 December 2026 Series B preferred first reset date: Whether the second $1.0B of preferred is redeemed, completing the swap of preferred for junior notes.
  • 26 February 2027 Q4 2026 results and 2027 guidance update: Whether the 2027 Adjusted EBITDA range of $7.7-8.5B holds, how much of it is Cogentrix, Batch Zero timing, and signed load beyond Meta and the 207 MW New Era deal.
Since we wrote this
Written
24 Aug
Price the thesis read
$136.21
21 Aug
  • 13 NovPrice moveStill Attractive: the rise left the price at 78% of valueThe shares rose about 8% on no news. Counting debt, which does not move with the price, they are about 78% of our $173 value, still inside the cushion; the view turns Neutral near $138.
  • 9 NovEarningsThe call said the 2027 range includes Cogentrix and MetaThe raise over the old aim is partly bought and contracted plants, not a higher view of the old fleet. Leverage is 2.8 times and the range was not cut, so Attractive and Medium hold.
  • 9 NovThesis reviewStill Attractive: priced at 71% of a value near $177Re-valued in three stages at an 8% return, the method now drawn on every thesis: the price sits more than 20% under the base case.
  • 6 NovEarningsAttractive: forecasts raised, shares at 8.6 times profitQ3 underlying profit rose 50% and the first 2027 range sat above the old aim, while the shares fell 30% in a month; conviction stays Medium until the call is read.
  • 31 OctThesis reviewThe page re-said from NeutralThe 12 October move to Neutral had left the verdict and the routes arguing from Attractive.
  • 30 OctNewsCogentrix acquisition closed on scheduleThe 5,500 MW gas purchase closed on 30 October inside the expected window; the view holds pending the early-November results.
  • 15 OctNewsVistra redeems its $1.0B 8.0% Series A preferred stock, as the September notes signalled. View heldVistra redeems all $1.0B of its 8.0% Series A preferred stock on the 15 October reset date.
  • 12 OctThesis reviewView moved from Attractive to NeutralThe price discount that made up most of the case has nearly gone and the business has not changed.
  • 6 OctNewsEnergy Department offers Vistra a conditional loan of up to $4.2B for nuclear plants. View heldEnergy Department said to offer Vistra a conditional loan commitment of up to $4.2B for nuclear uprates.
  • 5 OctThesis reviewThe long case now sits under the verdictAfter the five-name pilot, the owner asked for the long case on every thesis.
  • 4 OctThesis reviewOwner's checklist: revenue streams, cost of growth, management, catalystsThe owner's checklist found the method silent on who runs the company, what growth costs, where the money comes from and what is dated ahead; this pass fills those four blocks from the proxy and filings.
  • 15 SepThesis reviewTwo open questions turned out stale. View heldThe grid rule filings had been made months earlier, and the Texas queue audit ran past its expected two months. Nothing was read to a primary source, so no claim moved.
  • 24 AugThesis writtenAttractive, medium convictionTwo weeks after a quarter whose reported earnings missed by 52.8% on paper hedge losses while underlying profit grew over 30%.

Also checked 22 times with nothing new to act on.

Sources 25

Where this came from

Sources - 25

Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.

  1. S01primarycompany filing2026-02-27
    fleet composition, segments, nuclear PTC, Meta PPA, Cogentrix and Lotus transaction terms, competition section, risk factors
    backsC01C02C07C08C18C19C20C21C22C26C27C42C43C48C49
  2. S02primarycompany filing2026-08-10
    balance sheet, debt schedule, share count, EPS, liquidity as of 2026-06-30
    backsC16C17C43C53
  3. S03primarycompany filing2026-08-07
    Adjusted EBITDA by segment, guidance ranges, hedging loss detail, buyback and liquidity figures, Cogentrix FERC approval, Helix announcement
    backsC03C04C05C06C13C14C15C21C24C39
  4. S04primarytranscript2026-08-07
    Vistra Q2 2026 earnings call transcript
    management's ERCOT/PJM load-growth framing, Batch Zero audit color, Helix detail, capital allocation and leverage targets, RTC+B/battery commentary
    we put out a load forecast a little over two years ago in May of 2024 with an expectation of 115 to 120 gigawatts of load in ERCOT in 2030 ... we think is somewhere in the 12 GW to 15 GW by 2030. When you have numbers overstated by more than 20x, it causes problems for policy makers.
    backsC13C14C17C20C23C24C25C26C27C29C32C34C37C38
  5. S05primarycompany filing2026-02-24
    confirmation of integrated generation-plus-retail model as a cohort peer
    backsC41
  6. S06primarycompany filing2026-02-26
    confirmation of pure-play PJM merchant generation as a cohort peer
    backsC41
  7. S07primarycompany filing2026-02-24
    confirmation of generation-plus-retail model as a cohort peer, nuclear-heavy asset mix
    backsC41
  8. S08secondarynews2026-08-24
    Utility Dive - EIA cuts 2026 power generation forecast, ERCOT/PJM demand growth EIA (via Utility Dive)
    independent EIA-sourced ERCOT and PJM electricity demand growth rates
    the EIA revised its forecast of ERCOT growth rates, shrinking its projections from 6% to 5% growth in 2025 and 15.7% to 9.6% growth in 2026
    backsC30
  9. S09secondarynews2026-08-24
    Latitude Media / RTO Insider / Utility Dive - ERCOT large-load interconnection queue ERCOT (via trade press)
    independent size of the ERCOT large-load speculative queue
    ERCOT's large load interconnection queue sits at 410 GW, about 87% of which are data centers
    backsC28
  10. S10secondarynews2026-08-24
    Utility Dive - ERCOT 2030 load growth planning projections ERCOT (via trade press)
    independent ERCOT-sourced systemwide 2030 peak demand estimate
    ERCOT anticipates about 152 GW of new load on its system by 2030
    backsC31
  11. S11secondaryindustry data2026
    Cleanview - Bypassing the Grid: How Data Center Developers Are Building Their Own Power Plants Cleanview
    independent tracking of behind-the-meter/off-grid data-center generation capacity
    approximately 2 GW of behind-the-meter generation capacity is online across four projects, with the vast majority belonging to xAI
    backsC35
  12. S12secondarygovernment data2025-12-05
    ERCOT RTC+B go-live market notices and trade coverage (GridBeyond, ercot.com) ERCOT
    confirmation and date of ERCOT's scarcity-pricing market redesign
    Under the RTC+B regime, the ORDC adder to the energy prices is removed, and replaced by adders to real time ancillary service prices, known as ASDC
    backsC33
  13. S13secondarygovernment data2026
    EIA - Plant Vogtle Unit 4 begins commercial operation / US nuclear construction status EIA
    independent confirmation that no new large nuclear capacity is being added, supporting the scarcity of Vistra's existing licensed fleet
    No nuclear reactors are under construction now in the United States.
    backsC36
  14. S14secondarynews2026-08-23
    The Motley Fool - Vistra Is the Quietest Big Winner of the AI Power Boom
    evidence of the consensus AI-power framing of the stock
    read, but no claim rests on it
  15. S15secondarynews2026-08-07
    Reuters - Vistra quarterly profit slips on hedging losses despite strong power demand
    independent read on the Q2 2026 GAAP miss and its hedging-loss driver
    read, but no claim rests on it
  16. S16secondaryvendor data2026-08-24
    Portfolio-management research pack (market tier: price, insiders, analysts, congressional, peer valuation)
    content/VST/research-pack.json
    price/volatility snapshot, insider Form 4 aggregation, analyst consensus, congressional disclosures, cohort valuation multiples
    backsC39C40
  17. S17primarycompany filing2026-08-24
    data/reference/competitors.json - VST filed-competitor-class cohort review
    data/reference/competitors.json
    the research-tier cohort build (NRG, TLN, CEG) and each peer's confirming quote
    backsC41
  18. S18primarycompany filing2026-02-26
    the original 2026 guidance ranges and the agreements announced alongside full-year 2025 results
    read, but no claim rests on it
  19. S19primarycompany filing2026-05-07
    Q1 2026 buyback pace and Adjusted EBITDA progress, corroborating the full-year buyback and guidance trend
    backsC13C14
  20. S20primarycompany filing2026-03-18
    executive officer and director biographies, beneficial ownership as of March 3, 2026, the 2025 annual incentive scorecard and payout, the PSU design and the 2023 PSU result
    backsC45C46C47
  21. S21primarycompany filing2026-09-24
    $850M 7.000% Series A and $650M 7.250% Series B junior subordinated notes due 2057, issued by Vistra Operations and guaranteed by Vistra
    backsC49
  22. S22primarycompany filing2026-09-10
    use of proceeds: general corporate purposes including redeeming some or all of the Series A and Series B preferred stock at or after their October and December 2026 reset dates
    backsC49
  23. S23primarycompany release2026-10-30
    Vistra Corp. today announced it has completed the acquisition of Cogentrix Energy, consisting of 10 modern natural gas generation facilities totaling approximately 5,500 MW of capacity, from funds managed by Quantum Capital Group. The transaction closing follows receipt of all required regulatory approvals.
    backsC21
  24. S24primarycompany filing2026-11-06
    Q3 Ongoing Operations Adjusted EBITDA by segment, narrowed 2026 and first 2027 guidance, buyback authorization, liquidity, Cogentrix cash and debt repaid, New Era agreement
    backsC04C05C14C15C50C51C53
  25. S25primarytranscript2026-11-06
    what the 2027 range includes, leverage and ratings, Cogentrix economics, Batch Zero audit timing, the per-share free cash flow path, ERCOT forwards, buyback pace
    We are introducing guidance ranges for 2027 adjusted EBITDA of $7.7 billion to $8.5 billion and 2027 adjusted free cash flow before growth of $4.3 billion to $5.1 billion, including the expected contribution from the Cogentrix acquisition and the power purchase agreement with Meta for the operating capacity at our Perry nuclear plant.
    backsC05C52