USA Rare Earth
This is the archived full research. Read the story
A Brazilian heavy rare earth mine with a government-backed buyer, priced before the new shares its build still needs.
The scores
Growth3/4 ↑
Revenue is tiny today, but the mine began selling in November with 325 tonnes guided for the quarter and analysts expect about $611M in 2027.
Business quality2/4 ↑
A scarce heavy rare earth deposit sold at government floors, but no margin yet, a 5.25% royalty first, and MP and Lynas as rivals.
Financial position2/4 ↓
$1.09B of cash against $667.8M of loan and royalty, but operations use over $250M a year and the build needs about $1.55B more equity.
Execution record2/4 →
Bought a running mine and started a magnet line, but Round Top, Stillwater and Less Common Metals targets slipped and the chief executive changed.
Per share capture1/4 ↓
Shares rose 2.5 times in 2026, about 58% more are needed at today's price, and the royalty and buyer take part of the upside first.
Potential3/4 →
Magnet rare earth oxides are a $7.8B market forecast to grow fivefold, and Stage 2 alone would be about 1.6% of world mine output.
Risk profile1/4 →
One buyer, prices set by China's licensing, a Brazilian licence that expires in 2028, environmental notices and a buyer's option on the mine.
Valuation2/4 ↑
13.2 times Stage 1's sales at the floors and 5.8 times at the basket, before about 58% more shares; cheap only if record prices hold.
Evidence quality2/4 →
Cash, debt and the offtake terms are filed; tonnes, the basket and the magnet letters of intent rest on management's words.
If it works 2.2× · if it fails you keep about 16%.
The Verdict
We rate USA Rare Earth Unattractive. The business is weak for now: it owns a scarce heavy rare earth mine in Brazil whose first stage a government-backed buyer takes at floor prices, but it lost $141.4M at the operating line in the third quarter on $3.0M of sales, and its targets slipped this year. The price is full: about 13.2 times the first stage's sales at the floors, before government agreements force new shares that at today's price would add about 58% to the count. As a bet it is speculative and fairly priced. Record prices outside China holding would argue against us.
The long caseChina keeps licensing heavy rare earths while Pela Ema reaches 6,400 tonnes a year, so a government-backed buyer pays floors well above Chinese prices for every tonne.
How we weighed it
The price against our value
Against it
No fair value is drawn, since the mine has only just begun to ship. At the guaranteed floors the price is a high multiple of the first stage's sales, before the new shares.
The business
Cuts both ways
Weak
A scarce deposit and a floor-priced buyer, but no margin earned yet, a royalty taken first and the buyer sharing most of any upside.
Growth against what the price assumes
In its favour
The mine's ramp would lift sales many times over, and analysts expect hundreds of millions of dollars next year.
What could go wrong
Against it
Prices set by China's licensing, a Brazilian licence to renew, environmental notices, a buyer's option on the mine and equity milestones that force new shares.
Against competitors
Cuts both ways
MP holds its own government floor and Lynas already separates heavy elements, but heavy rare earths outside China remain scarce.
How its group is behaving
Cuts both ways
Government support for supply outside China is strong, but the listed group was priced on export-control headlines and fell hard this autumn.
The latest news and report
Against it
The last report missed on losses, revenue fell from the quarter before, targets slipped and the chief executive changed.
The evidence under this - 7 claims
The floors pay only for four elements; yttrium and the other heavy rare earths in the carbonate earn nothing until the company separates them itself.
China began issuing general export licences to selected exporters, so the controls can loosen without being lifted.
Much of the overhead rise is deal costs the finance chief calls one-time.
The chief executive says the Round Top delay buys more drilling and engineering before committing capital, which lowers building risk.
The vendor's company value of about $164M rests on a share count of 132.6M, before the placement and the Serra Verde shares, and is not used.
Up to $300M may be convertible notes, the milestones may be renegotiated, and the cash on hand covers the next year's spending.
Prices outside China are thinly traded and fall if Beijing grants more export licences.
The company
USA Rare Earth, based in Oklahoma, is building a chain from mine to magnet outside China. Rare earths are metals whose magnets drive electric motors, wind turbines and guided weapons; the heavy ones, dysprosium and terbium, keep those magnets working when hot.
Its Pela Ema mine in Brazil washes rare earths out of clay. Less Common Metals in England turns rare earth oxide into metal and alloy, and a plant in Stillwater, Oklahoma, makes magnets.
The evidence under this - 3 claims
Magnet revenue was $0.2M in the quarter and the finance chief calls current sales low-volume prototypes.
Management says its 2026 volumes passed all of 2025's by August and that legacy contracts reprice in the first half of 2027.
How it makes money
In the third quarter of 2026, $2.8M of its $3.0M of sales came from Less Common Metals and $0.2M from magnets. The work cost $22.9M to deliver, a loss before any overheads.
From the fourth quarter the mine adds sales: all its first-stage output goes to one buyer at agreed floor prices, plus most of any market price above them.
The evidence under this - 3 claims
Management blames industry-wide shortages of dysprosium oxide and samarium metal, and Serra Verde's first sales fell in November, after the quarter.
Management says its 2026 volumes passed all of 2025's by August and that legacy contracts reprice in the first half of 2027.
Magnet revenue was $0.2M in the quarter and the finance chief calls current sales low-volume prototypes.
Where the money comes from, stream by stream
| Stream | Share of sales (Q3 2026) | How it earns it |
|---|---|---|
| Less Common Metals metals and alloys | 93% | Rare earth metals and alloys made in England for magnet makers. |
| Magnets | 7% | Prototype magnet blocks from the first Stillwater line. |
Who runs it
Thras Moraitis, who ran Serra Verde, became chief executive on 1 October 2026; Rob Steele is finance chief and Michael Blitzer, whose acquisition company took the business public, is executive chair. Officers and directors owned 9.1% in April, and Serra Verde's former owners now hold about a third of the shares.
The former chief executive was paid $11.7M for 2025, almost all in shares, with bonuses at the board's discretion. The chairman bought 100,000 shares at $21.44 in January.
The evidence under this - 4 claims
A retiring executive selling is often personal, and the chairman's purchase came at three times today's price.
Why it wins, and who could beat it
Why customers come back
Heavy rare earths are mined at scale almost only in China and Burma, and since April 2025 China requires a licence to export them. From 2027 the Pentagon may not buy magnets whose supply chain runs through China, from the mine onward.
Pela Ema is one of few such mines outside China, and a buyer backed by the government takes its first stage for about 15 years at floors of $575 a kilogram for dysprosium and $2,050 for terbium.
The evidence under this - 4 claims
China began issuing general export licences to selected exporters, so the controls can loosen without being lifted.
The rule allows exceptions where no compliant supply exists at a reasonable price.
The floors pay only for four elements; yttrium and the other heavy rare earths in the carbonate earn nothing until the company separates them itself.
The threat
MP Materials, the US rival, sells under its own government price floor and is building a second magnet plant. Lynas separates dysprosium and terbium in Malaysia. Private magnet makers Noveon and VACUUMSCHMELZE run US plants, and Energy Fuels is buying a metal maker. If China eased its licences, cheaper Chinese supply would compete at every step.
The evidence under this - 4 claims
Lynas's ore is mostly light rare earths, so its heavy output is limited, and it has not published tonnages.
The figure is a forecaster's estimate a rival chose to publish, not a measured market.
The rivals: MP, MP, UUUU, and 3 more that are private, in-house or listed abroad.
Who else does this, rival by rival
| Ticker | Rival | Where it competes | How far along | Priced against it |
|---|---|---|---|---|
| MP | MP Materials, the US mine-to-magnet rivalPriced against it: Same product | The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top | On sale | Same product |
| MP Materials' metal-making | Less Common Metals: rare earth metals and alloys | On sale | ||
| Not listed | Lynas, the Australian producer separating dysprosium and terbium in MalaysiaPriced against it: Not listed | The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top | On sale | Not listed |
| Private | Noveon Magnetics and VACUUMSCHMELZE, private magnet makers with US plantsPriced against it: Private | The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top | On sale | Private |
| UUUU | Energy Fuels with KSM MetalsPriced against it: Small part of it | Less Common Metals: rare earth metals and alloys | On sale | Small part of it |
| Not listed | Chinese producers, if export licences loosenPriced against it: Not listed | The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top | On sale | Not listed |
How big it could get
How big this could get
The world mined about 390,000 tonnes of rare earths in 2025, 270,000 of it in China; Brazil mined about 2,000. A forecaster's figure in a rival's annual report puts the magnet rare earths at $7.8B in 2024. Nobody publishes the heavy rare earth market outside China, so its size cannot be counted; at the second stage's 6,400 tonnes, Pela Ema would sell about $621M a year at today's prices.
The evidence under this - 3 claims
The figure is a forecaster's estimate a rival chose to publish, not a measured market.
The basket moves with dysprosium and terbium prices outside China, and Stage 2 output may not all fall under the Phase 1 offtake.
The results
The numbers
Operating margin is −16×.
Running costs take 1419¢ of each sales dollar, down from 3633¢ in the year to Dec 2025.
Shareholders' money lost 4.9% a year, up from −125% in the year to Dec 2025.
It used $463M of cash over the last twelve months, so the $1.09B it holds lasts about 2.4 years at that pace.
It holds $1.09B of cash against $668M of debt, $423M more cash than it owes.
All the numbers
Filed figures from the company's 10-K and 10-Q, read 2026-11-17. Fiscal years end in December.
| Dec 2024 | Dec 2025 | 12 mo to Sep 2026 | |
|---|---|---|---|
| Size and growth | |||
| Sales | $0 | $1.64M | $16.2M |
| Profit | |||
| Gross margin | - | 12% | −131% |
| Operating margin | - | −36× | −16× |
| Net margin | - | −181× | −717% |
| What growth costs, per sales dollar | |||
| Research and development | - | 967% | 301% |
| General and admin | - | 26× | 11× |
| Pay in shares | - | 534% | 131% |
| Capital spending | - | 23× | 13× |
| Cash | |||
| Cash from operations | −$13.0M | −$49.0M | −$256M |
| Free cash flow | −$16.1M | −$86.3M | −$463M |
| Balance sheet | |||
| Cash and short-term investments | $16.8M | $360M | $1.09B |
| Debt | $2.03M | $1.85M | $668M |
| Net cash | $14.7M | $358M | $423M |
| Returns and shares | |||
| Shares (diluted) | - | - | 286M |
What growth costs
Growth has not yet paid. In the third quarter the work cost $22.9M to deliver $3.0M of sales, and over the last four quarters the business lost $250.6M at the operating line on $16.2M of sales. Whether scale pays waits on the mine's first full quarters.
The evidence under this - 3 claims
Management blames industry-wide shortages of dysprosium oxide and samarium metal, and Serra Verde's first sales fell in November, after the quarter.
Much of the overhead rise is deal costs the finance chief calls one-time.
Serra Verde contributed for under a month and sold nothing in the period, so the trailing year predates the mine.
The last report (9 Nov)
Quarter ended September 2026, filed figures.
In the third quarter of 2026, sales fell to $3.0M from $5.8M the quarter before, as shortages of Chinese inputs held back Less Common Metals. The operating loss was $141.4M, swollen by deal costs; a gain on warrants turned it into a small net profit, and the adjusted loss was $0.44 a share.
The mine was bought in September and began selling in November, with at least 325 tonnes guided for the quarter. Several targets set in March slipped by one to three quarters.
What it did to the thesisIt moved the case from plans to a running mine, but sales fell, losses grew and targets slipped, so the view rests even more on the mine's ramp and on how the new shares are issued.
The quarter in detail
Sales growth from the previous quarter, filed figures. The company has restated its own history, so a quarter either side of the restatement may describe a different business; n/c marks one that does not compare.
Earnings per share $-0.44 against $-0.10 expected; $-0.02 as filed, the gap being what the company adds back.
The evidence under this - 5 claims
Management blames industry-wide shortages of dysprosium oxide and samarium metal, and Serra Verde's first sales fell in November, after the quarter.
Much of the overhead rise is deal costs the finance chief calls one-time.
The $97 rests on record prices for dysprosium and terbium outside China; at the floors the same oxide earns less than half.
The chief executive says the Round Top delay buys more drilling and engineering before committing capital, which lowers building risk.
What management did with the money
The company raised $1.50B by selling new shares in January 2026, then paid $300.0M of cash and 126.8M shares for Serra Verde. It agreed to buy 13.6% of Carester, a French separation plant. Operations used $228.2M of cash over nine months and building spent $182.9M more.
Insiders in 2026Q3: 4 purchases and 0 sales, from their Form 4 filings.
The evidence under this - 4 claims
The finance chief says the purchase price and deal costs do not recur.
The price, and where we disagree
In short. Full. At the floors the buyer guarantees, the price is about 13 times the first stage's sales, before the new shares the build still needs.
The shares closed at $7.13 on 16 November, 78.3% below their high, and about 15.5% of them are sold short.
The next test is the fourth-quarter report, around 31 March 2027: whether the mine sold at least 325 tonnes, and how the company met or changed the equity raise its government agreements require by that date.
The evidence under this - 4 claims
The vendor's float is stale and reads 30%; against shares outstanding it is about half that.
The $97 rests on record prices for dysprosium and terbium outside China; at the floors the same oxide earns less than half.
The 10-Q says the company may instead seek to change the milestones with the Department.
How we value it
No fair value: USA Rare Earth lost $250.6M at the operating line over the last four quarters on $16.2M of revenue, and the mine that would earn a profit began selling only in November; the bet prices it instead.
How we read the multiple
With no profit to price, we compare the whole company's value with what the mine's first stage would sell.
- The whole company, netting its cash against its loan and royalty, is worth about $2.26B.
- The first stage, 4,000 tonnes a year, sells about $172M at the floors and $388M at today's prices.
- That is 13.2 times the floor sales and 5.8 times at today's prices.
- The government agreements require about $1.55B of new equity by the end of 2027.
- At today's price that is about 217M new shares, 58% more.
Against its own history. It listed in 2025 and had almost no sales before the mine, so there is no history of what buyers paid for each dollar of sales.
The evidence under this - 4 claims
The vendor's company value of about $164M rests on a share count of 132.6M, before the placement and the Serra Verde shares, and is not used.
Up to $300M may be convertible notes, the milestones may be renegotiated, and the cash on hand covers the next year's spending.
The $97 rests on record prices for dysprosium and terbium outside China; at the floors the same oxide earns less than half.
Brazil's whole rare earth mine output was about 2,000 tonnes in 2025, so the target triples it within two years.
Priced against its rivals
Only MP Materials sells the same thing to the same buyers as a large part of what it does. Energy Fuels does too, but as a small part of a much bigger company, so its price says little about this one. A price comparison needs at least two, so the price is judged against its own history instead.
Private or foreign rivals that cannot be priced: Noveon Magnetics Inc., VACUUMSCHMELZE GmbH & Co. KG, Lynas Rare Earths Ltd, KSM Metals Co., Ltd., China's state rare earth groups.
The bet: what it pays if it works
This bet is on the mine-to-magnet build. If the second stage ran at full rate with today's prices outside China, and buyers paid a generous multiple of sales, the company would be worth a little over twice today's value; after the new shares the build needs, each share gains much less.
If prices fall to the floors and the second stage stalls, the first stage alone earns too little to cover the losses, and new shares keep coming.
| The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top revenue in two to three years | Million dollars of oxide and magnet sales a year needed | At the stated multiple |
|---|---|---|
| $126.00M | about 126 at 100% kept | 0.5× |
| $621.00M (the big win) | about 621 at 100% kept | 2.2× |
| $1.48B | about 1.5K at 100% kept | 5.2× |
To pay 2× (a Fair bet) it would need about $564.01M of The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top revenue (about 564 million dollars of oxide and magnet sales a year); to pay 5× (a Cheap bet), about $1.41B of The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top revenue (about 1.4K million dollars of oxide and magnet sales a year), at the same multiple.
Each row is The mine-to-magnet build: Serra Verde, separation, Stillwater and Round Top alone, plus the rest of the company (Less Common Metals: rare earth metals and alloys) counted at about $16.00M.
The steps it has to take
- Done Serra Verde bought and Pela Ema's first stage built
- Done First magnet blocks sold from Stillwater
- In progress At least 325 tonnes sold in the fourth quarter due 2026-12
- Not started Equity milestone of $375M plus acquisition cash due 2027-03
- In progress Stage 1 at 4,000 tonnes a year due 2027-06
- In progress Stage 2 at 6,400 tonnes a year due 2027-12
The detail behind the label
The evidence under this - 4 claims
The basket moves with dysprosium and terbium prices outside China, and Stage 2 output may not all fall under the Phase 1 offtake.
Up to $300M may be convertible notes, the milestones may be renegotiated, and the cash on hand covers the next year's spending.
The vendor's company value of about $164M rests on a share count of 132.6M, before the placement and the Serra Verde shares, and is not used.
Serra Verde contributed for under a month and sold nothing in the period, so the trailing year predates the mine.
Where we disagree with the market
The only US-listed heavy rare earth producer, with a government buyer, 78% below its high.
A real mine priced at record prices, before the new shares its build still needs.
The market sees the only US-listed heavy rare earth producer, with a government buyer, after a 78% fall, and analysts expect sales of about $611M next year. We see a price that pays for the first stage at today's record prices, before more than half again as many shares.
The evidence against us: the second stage on time with prices outside China holding, or the equity raise met well above today's price, would show the price was cheap.
What analysts say, and the evidence
The evidence under this - 5 claims
The adjusted loss of $0.44 a share in Q3 2026 was over four times the $0.10 analysts expected.
MP earns most of its sales from separated oxide and a government floor, so its multiple prices a running integrated producer.
The vendor's company value of about $164M rests on a share count of 132.6M, before the placement and the Serra Verde shares, and is not used.
Up to $300M may be convertible notes, the milestones may be renegotiated, and the cash on hand covers the next year's spending.
Prices outside China are thinly traded and fall if Beijing grants more export licences.
What could go wrong, and how we would know
The risks
- New shares. About $1.55B of equity is required by the end of 2027.
- China's licences. Easier export licences would pull prices toward the floors.
- The buyer's option. If the mine stops for 60 days, the buyer may take it at a fair value.
- Licences in Brazil. The mine's licence expires in December 2028 and it carries environmental notices.
- Slipping targets. Three targets slipped one to three quarters in 2026.
The evidence under this - 5 claims
Up to $300M may be convertible notes, the milestones may be renegotiated, and the cash on hand covers the next year's spending.
China began issuing general export licences to selected exporters, so the controls can loosen without being lifted.
Stage 1 was completed and shipping began, so the notices have not stopped production.
The chief executive says the Round Top delay buys more drilling and engineering before committing capital, which lowers building risk.
What we still do not know
- What heavy rare earths actually sell for outside China, element by element.
- How much of the second stage's output falls under the floor-priced offtake.
- What Round Top would cost to build and produce, which no study has shown.
The evidence under this - 3 claims
The $97 rests on record prices for dysprosium and terbium outside China; at the floors the same oxide earns less than half.
The floors pay only for four elements; yttrium and the other heavy rare earths in the carbonate earn nothing until the company separates them itself.
Round Top has no reserve under SEC rules and no feasibility study, so its cost and output are unknown.
What would change our view
- Unattractive→NeutralA price that pays for Stage 1 at the floors
It needs:
- ○The whole company's value falls to 8 times the first stage's sales at the floors.about ≈$4.32 today, 39% below the last close
- Unattractive→NeutralStage 2 delivered with prices holding
It needs all of:
- ○Pela Ema sells at a 6,400-tonne yearly rate in a quarter of 2027 or 2028.watched as it happens
- ○Prices in that quarter stay above the floors, so the buyer pays more than the guaranteed price.watched as it happens
We would also be wrong if
- The equity raise due by 31 March 2027 is waived, deferred or met well above today's price.
- Stage 1 runs at 4,000 tonnes a year by mid-2027.
- China tightens its licences further and prices outside China rise again.
What is coming
- 1 January 2027 Pentagon's whole-chain magnet sourcing rule takes effect: Whether defence buyers turn to suppliers outside China.
Every dated event ahead
- 1 January 2027 Pentagon's whole-chain magnet sourcing rule takes effect: Whether defence buyers turn to suppliers outside China.
- 31 March 2027 Equity milestone under the Commerce agreements: How much new stock is issued, and at what price, or whether the milestone is changed.
- 31 March 2027 Q4 2026 results: Whether Serra Verde sold at least 325 tonnes and at what basket.
- 30 June 2027 Stage 1 at 4,000 tonnes a year and Stillwater's second line: Whether the mine and magnet plant ramp on the new schedule.
Since we wrote this
- 17 NovThesis writtenUnattractive, medium convictionWritten a week after the Q3 2026 results, with the shares 78% below their 52-week high.
Sources 15
Sources - 15
Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.
- S01primarycompany filing2026-03-30the business, Round Top's heavy rare earth basket and flowsheet, Less Common Metals' capacity, Stillwater's lines, the named competitors, 2025 results and headcountbacksC01C18C20C21C30C43C45
- S02primarycompany filing2026-11-12revenue by business and region, customer concentration, the Serra Verde purchase, the offtake terms and floor prices, the call option, the development-bank loan and royalty, the Commerce agreements and equity milestones, cash flows, share count, the Brazilian licence and the liquidity statementbacksC01C02C03C05C06C07C08C09C10C11C14C15C17C20C21C23C31C34C36C37C39C43C46
- S03primarycompany release2026-11-09the quarter's results, the fourth-quarter Serra Verde outlook and basket values, the 2027 operating targets, Blacksburg, Carester, the TMRC purchase and the chief executive changebacksC01C03C04C10C12C13C18C22C23C44
- S04primarytranscript2026-11-09magnet letters of intent, Stage 2 progress, the Round Top decision timing, raw-material shortages, the cash plan against the equity milestones and the basket explained
We have signed letters of intent and MOUs covering approximately 2500 tons of magnets, and secured purchase orders across the industrial mobility, aerospace, and defense sectors.
backsC04C12C13C16C18C19C20C21C23C36 - S05primarycompany filing2026-04-23the board, the chairman's background, beneficial ownership and 2025 executive paybacksC36C37C38
- S06primarygovernment data2026-02-01China's export controls on the heavy rare earths and their status
In April 2025, China tightened its export controls on rare-earth elements, adding specific controls on alloys, compounds, metals, and oxides of samarium, gadolinium, terbium, dysprosium, lutetium, scandium, and yttrium.
backsC25 - S07primarygovernment data2026-02-012025 mine production: world about 390,000 tonnes of oxide, China 270,000, the United States 51,000 and Brazil 2,000, up from 560 in 2024; US net import reliance on compounds and metals of 67%
World Mine Production and Reserves: Significant revisions were made to the 2024 production for Australia, Brazil, Burma, Madagascar, Nigeria, and Vietnam based on Government and industry reports.
backsC24 - S08primaryregulator2026-09-01the Pentagon's rule barring magnets whose supply chain runs through a covered country, from mining onward, from 2027
Effective January 1, 2027, for neodymium-iron-boron magnets, this restriction includes the entire supply chain from mining of neodymium, iron, and boron through production of finished magnets
backsC26 - S09primarycompany filing2026-02-26MP's Department of War price floor on NdPr and its second magnet plant, the 10X Facility, to begin commissioning in 2028
the Company entered into the Price Protection Agreement, which provides a price floor of $110 per kilogram
backsC27 - S10primarycompany filing2026-02-26Adamas Intelligence's size of the magnet rare earth oxide market as a rival reports it, and Energy Fuels' own separation capacity and planned purchase of Australian Strategic Materials
The total market for magnet rare earth oxides is forecasted to increase five-fold, from $7.8 billion in 2024 to $44.1 billion by 2040
backsC29 - S11secondarynews2025-06-18Lynas's first separated dysprosium oxide in May 2025 and terbium oxide in June 2025 in Malaysia, quoting its chief executive
Lynas can now supply customers with the two heavy rare earths required for rare earth permanent magnets used in electric motors.
backsC28 - S12secondaryvendor data2026-11-17Research pack (FMP market tier and FINRA short interest), frozen 2026-11-17content/USAR/research-pack.jsonthe close, the 252-session high and low, returns, the analyst split and estimates, earnings history and short interestbacksC02C31C33C34
- S13primarycompany filing2026-10-02each open-market purchase and sale, its price and whether it was made under a pre-set planbacksC35
- S14secondaryvendor data2026-09-30MP Materials research pack, frozen with its thesis (FMP market tier)content/MP/research-pack.jsonMP's company value against its trailing salesbacksC42
- S15primarycompany release2026-03-30the 2025 operating loss and capital spending, and the targets then set for Stillwater, Less Common Metals and Round TopbacksC22C45