Forgent Power Solutions
This is the archived full research. Read the story
A Minnesota maker of the switchgear, transformers and power skids that carry grid power into data centers, listed in February 2026.
The scores
Growth3/4 ↑
Revenue grew 89% in FY26, data center sales 161% against a market up about 40%; but the filed record is two years, partly acquired.
Business quality3/4 →
Share gains and orders at 3.3 times sales show an edge in delivering custom gear fast, resting on capacity in a shortage rivals are expanding.
Financial position3/4 ↑
About $501M of net debt, about 0.8 times FY27's guided profit, nothing due before 2032; the $338.9M tax receivable is a further claim.
Execution record3/4 →
Three beats in three quarters as a listed company and FY26 ahead of the IPO plan, but the record is too short to score higher.
Per share capture3/4 →
The offerings did not grow the share count, but 85% of certain tax savings go to the pre-IPO owners and acquisitions come first.
Potential2/4 ↑
FY27 sits in a $3.0B backlog yet to convert, and growth after it is expected, not signed, in a cycle others control.
Risk profile3/4 →
One concentration: 59% of sales go to data center builders, one customer is 11%, and a sponsor with 37% of the vote holds consent rights.
Valuation4/4 ↑
About 26% under a base-case value of about $27.66 at an 8% return: cheap, past the 20% margin, though the value is wide.
Evidence quality3/4 →
Results, backlog and the shortage are filed or measured from outside; the lead-time edge and FY27 cover rest on management's word.
The Verdict
We rate Forgent Power Solutions Attractive. It builds data-centre power gear fast in a shortage, grew sales 69% in the September quarter and raised its plan for the year, so the business is solid. We value the shares at about $27.66 against $20.57, about a quarter under our value and past our 20% cushion. The shortage will ease and orders are reported only yearly, but at this price the cushion pays for those risks.
The long caseAmerica is building data centres for AI and the grid to feed them, and Forgent builds their power gear fast; orders must keep coming once rivals add factories.
How we weighed it
The price against our value
In its favour
Price at 74% of our value
The price has fallen past the margin of safety under our value with no new fact against the business; the bear case sits far below and the bull far above.
The business
In its favour
Solid
It builds data-centre power gear fast and is winning share in a shortage.
Growth against what the price assumes
Cuts both ways
Firm orders cover this year and, management says, much of next, with orders about doubling; growth slows as rivals add capacity.
What could go wrong
Against it
The shortage will end, one kind of customer dominates, the controlling owner keeps cashing out and copper sits in fixed prices.
Against competitors
Cuts both ways
Its filed rivals have not been re-measured since the fall, so the comparison is stale.
How its group is behaving
Cuts both ways
Contractors and power gear for data centres were marked down together.
The latest news and report
In its favour
The first quarter beat the forecast and raised the year; since then the shares have fallen with no company news.
What moved it from Neutral
The shares kept falling after a report that beat and raised, with no new fact against the business, and now sit clearly past the margin of safety. The thin cushion that held the view at Neutral is now a real one.
The evidence under this - 9 claims
One quarter's bookings: the company says single orders now move a quarter, which is why it will stop reporting quarterly orders (C14).
Cancellation terms are not disclosed, and from FY27 orders and backlog are reported only once a year (C14), so neither the cover nor the 40% can be checked until September 2027.
- 2026-11-12editedthe Q1 fiscal 2027 call said backlog fully covers the raised guide and about 40% of it falls after FY27
On FY26's actual $322.9M the same value is about 25 times, so the price is cheap only on a year the backlog has yet to turn into sales (C24).
- 2026-10-23editedre-struck at the 22 October close: 13.5 times FY27's guided EBITDA, from 21.3 at $40.35
- 2026-11-09editedRe-struck at the 6 November close, 22% below the 22 October close.
- 2026-11-10editedre-struck at the 9 November close of $22.60, 16% above the 6 November close
- 2026-11-11editedre-struck at the 10 November close of $21.48, 5% below the 9 November close
- 2026-11-12editedre-struck at the 11 November close of $24.57 on the raised FY27 adjusted EBITDA midpoint of $612M and September's cash and term loan
- 2026-11-13editedre-struck at the 12 November close of $22.15, after the shares fell 9.8% on the day of the first-quarter report; guidance, cash and term loan unchanged
- 2026-11-17editedre-struck at the 16 November close of $20.57
No outside source measures Forgent's own lead times; the industry's 44-week switchgear average (C10) is the only comparison found, and Vertiv has doubled its switchgear capacity (C12).
Most of the quarter's operating cash came from customer deposits and milestone payments, which the company calls favourable timing, while inventory rose $98.8M.
The range is very wide because 69% of the value lies after year ten and the years after FY27 rest on orders the company will now report only once a year (C14); if the shortage ends and orders stop, the bear case is about $7.33.
- 2026-11-09editedRe-struck on the upgraded method: every view read at 9%, the return on new capital set by the moat, and capital per dollar of sales read from the filings.
- 2026-11-09editedRe-struck at the 8% required return the owner chose after the roll-out screen: the market priced the median name on the roster at about 7.7%, so 9% on top of a 20% margin read most of it Unattractive.
- 2026-11-09editedRe-struck on the decaying fade the owner chose on 9 November: after the stated path each year closes 30% of the gap to 4%, and an analysts' margin is cut by their gap to the filed operating profit.
- 2026-11-10editedre-struck at the 9 November close of $22.60; the base case is unchanged and the price is now 79% of it
- 2026-11-10editedre-valued on the owner's rules of 10 November: the return on new capital glides to its terminal level over years six to ten
- 2026-11-11editedprice re-read at the 10 November close of $21.48; the inputs and the $27.21 base case are unchanged and the price is now about 79% of it
- 2026-11-12editedre-struck after Q1 fiscal 2027: year-one growth on the raised guide's 80% midpoint, September's cash, and the term loan plus the tax receivable payable, now $483.0M
- 2026-11-13editedprice re-read at the 12 November close of $22.15, about 80% of the unchanged base-case value
- 2026-11-17editedprice re-read at the 16 November close of $20.57, about 74% of the unchanged base case, past the 80% line
The company
Power arrives at a data center at high voltage and must be switched, protected and stepped down before servers can use it. Forgent builds the gear that does this: switchgear, which holds the breakers that cut off a fault; transformers, which lower the voltage; and the panels that carry power to the racks.
Most of it is built to one project's design. A growing share ships as a whole tested system on a skid, so the site plugs in one unit instead of wiring dozens.
The evidence under this - 4 claims
No outside source measures Forgent's own lead times; the industry's 44-week switchgear average (C10) is the only comparison found, and Vertiv has doubled its switchgear capacity (C12).
How it makes money
Forgent is paid per order, mostly for custom gear: about 70% of sales last year, with whole skids another 25%. Data centers bought about 59%, utilities 21% and factories 10%, nearly all in North America.
Profit after making the gear was 35 cents on each dollar of sales. One customer alone was 11% of sales, and bigger system orders mean fewer, larger buyers.
The evidence under this - 3 claims
Where the money comes from, stream by stream
| Stream | Share of sales (FY 2026) | How it earns it |
|---|---|---|
| Custom Products | 69.7% | Switchgear, switchboards, transformers and other gear built to one project's design. |
| Powertrain Solutions | 25.2% | Custom Products integrated into one skid or electrical house, shipped as a tested system. |
| Standard Products | 3.0% | Common designs made in volume for basic uses. |
| Services | 2.1% | Commissioning, repair and maintenance in the field. |
Who runs it
Gary Niederpruem became chief executive in May 2025 after six years at Vertiv, a rival. Ryan Fiedler, finance chief since July 2025, stepped down on 21 October 2026, citing family time; Amy Ard, head of finance since January and once Proterra's finance chief, took over.
No executive owns shares directly; their stake is in the private-equity owner's partnerships, mostly unvested. Last year's bonus paid on sales and profit. The owner, Neos Partners, holds 37% of the vote.
The evidence under this - 3 claims
- 2026-10-22editedThe 21 October 8-K replaced the finance chief; the claim named Fiedler as the current one.
- 2026-10-22editedA same-day 8-K/A stated the departure was not a disagreement over operations, accounting or reporting; the claim carried only the unconfirmed family reason.
Why it wins, and who could beat it
Why customers come back
In a shortage, being able to deliver is the advantage. Industry switchgear took about 44 weeks to arrive in 2025, and Forgent says it can design a custom unit in hours and ship it in as little as a week, because it makes its own switchgear and transformers.
That shows up as share: its data center sales grew 161% while US data center building grew about 42%. But it lasts only as long as the shortage, and nobody outside the company measures its delivery times.
The evidence under this - 6 claims
No outside source measures Forgent's own lead times; the industry's 44-week switchgear average (C10) is the only comparison found, and Vertiv has doubled its switchgear capacity (C12).
The same article reports distribution transformer supply improving, the first sign of the shortage easing.
The third-party research is not named and the 40% cannot be checked; Census measures data center construction up 41.7% (C11), close to the company's 37%.
One quarter's bookings: the company says single orders now move a quarter, which is why it will stop reporting quarterly orders (C14).
The threat
Vertiv, Schneider Electric, Eaton and Hubbell sell the same gear to the same buyers, and Vertiv has more than doubled its switchgear capacity since 2021. Forgent's own annual report warns prices could fall if the industry adds capacity faster than demand grows. NVIDIA's next rack power design names Eaton, Schneider and Vertiv as partners, not Forgent.
The evidence under this - 3 claims
The rivals: VRT, ETN, HUBB, GEV, POWL, NVT, and 2 more that are private, in-house or listed abroad.
Who else does this, rival by rival
| Ticker | Rival | Where it competes | How far along | Priced against it |
|---|---|---|---|---|
| VRT | VertivPriced against it: Yes | Forgent Power Solutions (electrical distribution equipment) | On sale | Yes |
| Schneider ElectricPriced against it: Listed abroad | Forgent Power Solutions (electrical distribution equipment) | On sale | Listed abroad | |
| ETN | Eaton, including Fibrebond and Cooper PowerPriced against it: Yes | Forgent Power Solutions (electrical distribution equipment) | On sale | Yes |
| HUBB | Hubbell (PCX and Systems Control)Priced against it: Yes | Forgent Power Solutions (electrical distribution equipment) | On sale | Yes |
| GEV | Hitachi Energy, Prolec GE and WEGPriced against it: Shown, not counted | Forgent Power Solutions (electrical distribution equipment) | On sale | Shown, not counted |
| Private | IEM and Mission Critical GroupPriced against it: Private | Forgent Power Solutions (electrical distribution equipment) | On sale | Private |
| POWL | Powell IndustriesPriced against it: Yes | Forgent Power Solutions (electrical distribution equipment) | On sale | Yes |
| NVT | nVent ElectricPriced against it: Yes | - | On sale | Yes |
How big it could get
How big this could get
US builders spent $45.2B on data centers in the first eight months of 2026, up 41.7%. Forgent's gear is a slice of that, but nobody publishes how big a slice, so the market cannot be sized precisely.
Two trends help: about 40% of data centers are now built from factory-made modules, which management says outside research expects to reach 60% by 2030, and the US still imports most of its transformers.
The evidence under this - 4 claims
The third-party research is not named and the 40% cannot be checked; Census measures data center construction up 41.7% (C11), close to the company's 37%.
Some participants quoted by POWER argue there is no real shortage and that procurement practice is the bottleneck (C10).
Who has signed
Customers have placed $3.0B of orders, which management says are all firm purchase orders, though cancellation terms are not public. A frontier AI lab placed its first direct order and a hyperscaler signed a framework agreement; neither is named, sized or dated.
The evidence under this - 3 claims
One quarter's bookings: the company says single orders now move a quarter, which is why it will stop reporting quarterly orders (C14).
Cancellation terms are not disclosed, and from FY27 orders and backlog are reported only once a year (C14), so neither the cover nor the 40% can be checked until September 2027.
- 2026-11-12editedthe Q1 fiscal 2027 call said backlog fully covers the raised guide and about 40% of it falls after FY27
- Neither customer, the orders' size nor the agreements' terms is disclosed, and a product agreement commits no volume.
- The chief executive said the path from first order to programme orders is measured in quarters and with some customers may never arrive.
- 2026-11-12editedthe Q1 fiscal 2027 call reported a volume order from one AI lab, a first order from a second and two hyperscaler product agreements
The results
The numbers
Sales grew 83% over the twelve months to Sep 2026, slower than the 89% in the year to Jun 2026.
Operating margin is 14%.
Running costs take 20¢ of each sales dollar, down from 27¢ in the year to Jun 2025.
Each dollar put into the business earns 14% a year after tax, up from 6.3% in the year to Jun 2025.
It turned 7.5% of sales into free cash, $122M over the last twelve months.
It owes $381M more than the cash it holds, about 1.6 years of the cash its operations bring in.
Free cash flow was 1.0 times net income.
All the numbers
Filed figures from the company's 10-K and 10-Q, read 2026-11-12. Fiscal years end in June.
| Jun 2025 | Jun 2026 | 12 mo to Sep 2026 | |
|---|---|---|---|
| Size and growth | |||
| Sales | $753M | $1.42B | $1.62B |
| Sales growth | - | +89% | +83% |
| Profit | |||
| Gross margin | 37% | 35% | 35% |
| Operating margin | 9.6% | 13% | 14% |
| Net margin | 2.0% | 5.8% | 7.4% |
| What growth costs, per sales dollar | |||
| Selling, general and admin | 19% | 19% | 17% |
| Pay in shares | 0.2% | 0.5% | 1.0% |
| Capital spending | 11% | 8.2% | 7.3% |
| Cash | |||
| Cash from operations | $45.0M | $109M | $239M |
| Free cash flow | −$39.1M | −$6.82M | $122M |
| Balance sheet | |||
| Cash and short-term investments | $111M | $97.5M | $200M |
| Debt | $502M | $582M | $581M |
| Net cash | −$391M | −$485M | −$381M |
| Returns and shares | |||
| Return on capital | 6.3% | 15% | 14% |
| Shares (diluted) | - | - | 274M |
What growth costs
Growth has paid so far: as sales grew 89%, operating profit rose from about 10 cents to 13 cents per dollar of sales, because overheads spread over more sales. Building factories cost more cash than the business made last year; the company expects capital spending of about 3% of sales this year.
The evidence under this - 3 claims
The raise is $50M on revenue, about 2% of the midpoint, and the September quarter's 21.9% adjusted EBITDA margin is below the 23.0% of a year earlier and the about 24% the full-year guide implies.
- 2026-10-22editedThe 22 October 8-K said the September quarter's revenue and adjusted EBITDA will beat the high end of the guide and moved the report date to 12 November; the claim described the guide alone.
- 2026-11-12editedQ1 fiscal 2027 reported above the guide and the fiscal 2027 guide raised on 12 November
The last report (12 Nov)
Quarter ended September 2026, filed figures.
Sales in the first quarter of fiscal 2027 rose 69% to $478.6M, above the $445M to $465M the company had forecast. Profit before interest, tax and depreciation, as the company counts it, was $104.9M, 21.9% of sales.
Customers paid $159M more in deposits, so cash from operations reached $136M. The company raised its plan for the year to $2.45B to $2.65B of sales, which it says its orders fully cover.
On the call management said orders were about double a year earlier and about 40% of the order book falls after this year, figures the filings no longer give.
What it did to the thesisIt showed the ordered year turning into sales on time and lifted it a little. Management's order figures point to next year too, but are checked only yearly.
The quarter in detail
Sales growth from the previous quarter, filed figures.
Earnings per share $0.18 against $0.20 expected.
The evidence under this - 5 claims
Cancellation terms are not disclosed, and from FY27 orders and backlog are reported only once a year (C14), so neither the cover nor the 40% can be checked until September 2027.
- 2026-11-12editedthe Q1 fiscal 2027 call said backlog fully covers the raised guide and about 40% of it falls after FY27
The raise is $50M on revenue, about 2% of the midpoint, and the September quarter's 21.9% adjusted EBITDA margin is below the 23.0% of a year earlier and the about 24% the full-year guide implies.
- 2026-10-22editedThe 22 October 8-K said the September quarter's revenue and adjusted EBITDA will beat the high end of the guide and moved the report date to 12 November; the claim described the guide alone.
- 2026-11-12editedQ1 fiscal 2027 reported above the guide and the fiscal 2027 guide raised on 12 November
Most of the quarter's operating cash came from customer deposits and milestone payments, which the company calls favourable timing, while inventory rose $98.8M.
- Orders are no longer reported quarterly (C14), so the doubling is the chief executive's word and cannot be checked until the FY27 10-K.
- Grid orders fell back after developers pulled orders forward and paused storage projects over rules on foreign equipment.
What management did with the money
Every dollar the company raised in its share sales went to buy out part of its private-equity owner, so the company kept none. It built 1.8 million square feet of factories, plans $35M more in Tijuana, refinanced its loan more cheaply, and names acquisitions as its first use of cash.
The evidence under this - 3 claims
Capacity is not demand: FY27 guidance of about $2.5B uses half of today's stated capacity.
The price, and where we disagree
In short. Cheap. The price pays for the ordered year and buys the slower years after it at about 74% of our value.
The shares fell by nearly half from October's high after the finance chief left on 22 October, fell 9.8% to $22.15 on the day of a report that beat its forecast, and fell again to $20.57 on 16 November with no company news.
The next test is the December quarter, reported in February 2027: whether the raised plan for the year holds and the profit margin climbs toward the 24% the plan implies. Its private-equity owner has sold shares in each follow-on offering since listing and expects to sell more.
The evidence under this - 5 claims
- 2026-10-23editedre-struck at the 22 October close: the shares fell 38.2% since 2 October and 21.5% in one session
- 2026-10-23editedThe 15-minute bars put the fall at the open, minutes after the 7:00am release of the finance chief's departure; the claim said the day's filings did not explain it.
On FY26's actual $322.9M the same value is about 25 times, so the price is cheap only on a year the backlog has yet to turn into sales (C24).
- 2026-10-23editedre-struck at the 22 October close: 13.5 times FY27's guided EBITDA, from 21.3 at $40.35
- 2026-11-09editedRe-struck at the 6 November close, 22% below the 22 October close.
- 2026-11-10editedre-struck at the 9 November close of $22.60, 16% above the 6 November close
- 2026-11-11editedre-struck at the 10 November close of $21.48, 5% below the 9 November close
- 2026-11-12editedre-struck at the 11 November close of $24.57 on the raised FY27 adjusted EBITDA midpoint of $612M and September's cash and term loan
- 2026-11-13editedre-struck at the 12 November close of $22.15, after the shares fell 9.8% on the day of the first-quarter report; guidance, cash and term loan unchanged
- 2026-11-17editedre-struck at the 16 November close of $20.57
The raise is $50M on revenue, about 2% of the midpoint, and the September quarter's 21.9% adjusted EBITDA margin is below the 23.0% of a year earlier and the about 24% the full-year guide implies.
- 2026-10-22editedThe 22 October 8-K said the September quarter's revenue and adjusted EBITDA will beat the high end of the guide and moved the report date to 12 November; the claim described the guide alone.
- 2026-11-12editedQ1 fiscal 2027 reported above the guide and the fiscal 2027 guide raised on 12 November
Most of the quarter's operating cash came from customer deposits and milestone payments, which the company calls favourable timing, while inventory rose $98.8M.
How we value it
- Method
- Cash the business will produce, in three stages
- Required return
- 8%
- Long-run growth
- 4%
- Moat
- An average moat
| Bear | Base | Bull | |
|---|---|---|---|
| Sales growth, years 1 to 3 | 72%, 0%, 0% | 79.6%, 25%, 15% | 79.6%, 34%, 30% |
| Normal operating margin | 13% | 18% | 21% |
| Return on new capital after year ten | 8% | 12% | 15% |
| Value a share | $7.30 | $27.66 | $55.40 |
- Price
- $20.57
- Priced on
- 16 Nov
- Price as a share of the base value
- 74%
- Starting growth the price pays for
- 34%
- Yearly return the price offers on the base case
- 9.1%
- Risk check: valued at 10%, the rate for a cyclical or indebted business
- $16.83
Where each figure comes from
| Figure | Source | Where exactly |
|---|---|---|
| Sales, the last full year | Filed report | Annual report (10-K) for the period to 30 Jun 2026, filed 15 Sep 2026; the full year. |
| Operating margin today | Filed report | Annual report (10-K) for the period to 30 Jun 2026, filed 15 Sep 2026; the full year. |
| Tax rate | Our judgement | Our reading of the evidence. |
| Sales per dollar of new capital | Filed report | Annual report (10-K) for the period to 30 Jun 2026, filed 15 Sep 2026: the year's sales over its operating capital. |
| Shares | Filed report | Read by hand from the filed statements; the period it was read from was not recorded. |
| Cash and investments | Filed report | Annual report (10-K) for the period to 30 Jun 2026, filed 15 Sep 2026; the balance sheet on that date. |
| Debt | Filed report | Read by hand from the filed statements; the period it was read from was not recorded. |
| Sales growth, years 1 to 3 | Our judgement | Our reading of the evidence, set against the analysts' forecasts and the company's guidance; the base case below says where it follows them and where it departs. FMP's consensus of 6 to 9 analysts read 60%, 34%, 29.7%. |
| Normal operating margin | Our judgement | Our reading of the evidence, set against the company's guidance; the base case below says where it follows it and where it departs. FMP's consensus, less stock pay, read 21%. |
| Return on new capital after year ten | Our method's rule | Set by our reading of the moat: the 8% rate with none, 12% with an average one, 15% with a strong one; the bear case earns the rate. |
| The bear and bull cases | Our judgement | Our reading of the evidence; each case below names it. |
| Price | Market price | FMP's closing price on 10 Nov 2026. |
What each case rests on
Bear caseOrders stop once the shortage ends (C12): FY27 lands a little under the raised guide at 72%, then no growth, the margin falls back to FY26's 12.8%, and new capital earns only 8%.
Base caseFY27 grows the raised guide's 80% midpoint, which management says backlog fully covers (C23); FY28 25% and FY29 15%, below the analysts' 34%, as Vertiv and others add capacity (C12); the operating margin settles at 18%, under the shortage's guided EBITDA margin (C20), once the shortage pricing fades.
Bull caseDirect orders from an AI lab and a hyperscaler (C15) keep growth near the analysts' 34% and 30%, and the margin holds at 21% as modular builds rise toward 60% of data centres (C16).
What moves the base value
| Lower | Higher | |
|---|---|---|
| Growth in years 1 to 3, a quarter lower or higher | $21.06 | $35.60 |
| The normal margin, 15% lower or higher | $22.94 | $32.39 |
| Capital per dollar of growth, a quarter more or less | $26.76 | $28.21 |
| Return on new capital after year ten, at the rate or one step up | $21.17 | $30.26 |
| The rate, a point higher or lower | $21.16 | $38.52 |
| Long-run growth a point lower | $24.52 | - |
Value a share as growth and margin change
| Normal margin ↓ · growth → | 50% | 75% | 100% | 125% | 150% |
|---|---|---|---|---|---|
| 14.4% | $11.92 | $16.19 | $21.36 | $27.56 | $34.95 |
| 16.2% | $13.76 | $18.62 | $24.51 | $31.58 | $40.00 |
| 18% | $15.60 | $21.06 | $27.66 | $35.60 | $45.05 |
| 19.8% | $17.44 | $23.49 | $30.81 | $39.61 | $50.10 |
| 21.6% | $19.28 | $25.92 | $33.97 | $43.63 | $55.15 |
Growth is shown as a share of the base case's. Green: the price is at or under 80% of that value. Red: at or over 120%.
How we read the multiple
A buyer pays for the whole company, about $6.7B including debt, against the profit it expects this year before interest, tax and depreciation.
1. The company expects about $612M of that profit in the year to June 2027. 2. Today's price is about 10.9 times that figure. 3. Valued on growth that slows to 4% over ten years and a margin below the shortage's peak, the shares are worth about $27.66.
So the price is about 74% of that value, past our 20% margin of safety.
Against its own history. It has traded for only eight months, so its own normal is short; the price is now far below any level it has traded at since the listing's first weeks.
The evidence under this - 6 claims
The range is very wide because 69% of the value lies after year ten and the years after FY27 rest on orders the company will now report only once a year (C14); if the shortage ends and orders stop, the bear case is about $7.33.
- 2026-11-09editedRe-struck on the upgraded method: every view read at 9%, the return on new capital set by the moat, and capital per dollar of sales read from the filings.
- 2026-11-09editedRe-struck at the 8% required return the owner chose after the roll-out screen: the market priced the median name on the roster at about 7.7%, so 9% on top of a 20% margin read most of it Unattractive.
- 2026-11-09editedRe-struck on the decaying fade the owner chose on 9 November: after the stated path each year closes 30% of the gap to 4%, and an analysts' margin is cut by their gap to the filed operating profit.
- 2026-11-10editedre-struck at the 9 November close of $22.60; the base case is unchanged and the price is now 79% of it
- 2026-11-10editedre-valued on the owner's rules of 10 November: the return on new capital glides to its terminal level over years six to ten
- 2026-11-11editedprice re-read at the 10 November close of $21.48; the inputs and the $27.21 base case are unchanged and the price is now about 79% of it
- 2026-11-12editedre-struck after Q1 fiscal 2027: year-one growth on the raised guide's 80% midpoint, September's cash, and the term loan plus the tax receivable payable, now $483.0M
- 2026-11-13editedprice re-read at the 12 November close of $22.15, about 80% of the unchanged base-case value
- 2026-11-17editedprice re-read at the 16 November close of $20.57, about 74% of the unchanged base case, past the 80% line
On FY26's actual $322.9M the same value is about 25 times, so the price is cheap only on a year the backlog has yet to turn into sales (C24).
- 2026-10-23editedre-struck at the 22 October close: 13.5 times FY27's guided EBITDA, from 21.3 at $40.35
- 2026-11-09editedRe-struck at the 6 November close, 22% below the 22 October close.
- 2026-11-10editedre-struck at the 9 November close of $22.60, 16% above the 6 November close
- 2026-11-11editedre-struck at the 10 November close of $21.48, 5% below the 9 November close
- 2026-11-12editedre-struck at the 11 November close of $24.57 on the raised FY27 adjusted EBITDA midpoint of $612M and September's cash and term loan
- 2026-11-13editedre-struck at the 12 November close of $22.15, after the shares fell 9.8% on the day of the first-quarter report; guidance, cash and term loan unchanged
- 2026-11-17editedre-struck at the 16 November close of $20.57
The raise is $50M on revenue, about 2% of the midpoint, and the September quarter's 21.9% adjusted EBITDA margin is below the 23.0% of a year earlier and the about 24% the full-year guide implies.
- 2026-10-22editedThe 22 October 8-K said the September quarter's revenue and adjusted EBITDA will beat the high end of the guide and moved the report date to 12 November; the claim described the guide alone.
- 2026-11-12editedQ1 fiscal 2027 reported above the guide and the fiscal 2027 guide raised on 12 November
FY28 has no backlog behind it yet beyond the less than 10% of the book scheduled past FY27 (C05), and quarterly orders will not be reported (C14).
- 2026-10-23editedre-struck at the 22 October close: 9.9 times FY28 at consensus, from 15.7
Trailing figures miss a year in which revenue grew 89%: on FY27 guidance the multiple was about 21.3 on 2 October and is about 13.5 at the 22 October close (C20).
- 2026-10-23editedcounter-evidence re-struck at the 22 October close; the cohort figures are 2 October's and are re-measured at the next full review
Priced against its rivals
The competitors its own annual report names, each confirmed against the rival's filing. Measured on company value for each $1 of cash profit, cheapest first:
| Ticker | Company | company value for each $1 of cash profit |
|---|---|---|
| HUBB | Hubbell Incorporated | 20.4× |
| POWL | Powell Industries | 27.7× |
| NVT | nVent Electric | 28.7× |
| ETN | Eaton | 29.3× |
| VRT | Vertiv Holdings | 37.8× |
| FPS | Forgent Power Solutions | 42.4× |
| GEV | GE Vernova not in the median | 98.8× |
The middle of the other 5 is 28.7. GE Vernova Inc. competes with it in one product line inside a much bigger company, so its price says little about this business and it is not counted in the middle. Forgent Power Solutions, Inc. is dearest of 6.
Rivals' figures come from a data provider, so read the spread of the group rather than any single pair.
On last year's profit it looked dearest among its filed rivals before the fall; the rivals have not been re-measured since.
Private or foreign rivals that cannot be priced: Schneider Electric SE, Hitachi Energy Ltd. and WEG S.A., IEM Holdings Group, Inc. and Mission Critical Group.
Where we disagree with the market
A fast AI power winner growing far faster than its market, which has now been marked down 62% from its high.
The year ahead is bought and the next is nearly free at this price; the years after depend on orders outlasting a shortage everyone is adding capacity to end.
The orders are real, but they are this year's sales, not growth still to come, and the price already counts them. What is not counted is the next year, which depends on orders arriving after rivals add capacity, and those orders will be reported only once a year. At the lower price that risk is mostly paid for.
Against us: the company beat forecasts in each of its three quarters as a listed company, and orders ran at 3.3 times sales in the latest one.
What analysts say, and the evidence
The evidence under this - 7 claims
- 2026-10-23editedre-struck at the 22 October close: the shares fell 38.2% since 2 October and 21.5% in one session
- 2026-10-23editedThe 15-minute bars put the fall at the open, minutes after the 7:00am release of the finance chief's departure; the claim said the day's filings did not explain it.
On FY26's actual $322.9M the same value is about 25 times, so the price is cheap only on a year the backlog has yet to turn into sales (C24).
- 2026-10-23editedre-struck at the 22 October close: 13.5 times FY27's guided EBITDA, from 21.3 at $40.35
- 2026-11-09editedRe-struck at the 6 November close, 22% below the 22 October close.
- 2026-11-10editedre-struck at the 9 November close of $22.60, 16% above the 6 November close
- 2026-11-11editedre-struck at the 10 November close of $21.48, 5% below the 9 November close
- 2026-11-12editedre-struck at the 11 November close of $24.57 on the raised FY27 adjusted EBITDA midpoint of $612M and September's cash and term loan
- 2026-11-13editedre-struck at the 12 November close of $22.15, after the shares fell 9.8% on the day of the first-quarter report; guidance, cash and term loan unchanged
- 2026-11-17editedre-struck at the 16 November close of $20.57
Cancellation terms are not disclosed, and from FY27 orders and backlog are reported only once a year (C14), so neither the cover nor the 40% can be checked until September 2027.
- 2026-11-12editedthe Q1 fiscal 2027 call said backlog fully covers the raised guide and about 40% of it falls after FY27
One quarter's bookings: the company says single orders now move a quarter, which is why it will stop reporting quarterly orders (C14).
What could go wrong, and how we would know
The risks
- The shortage ends Prices rose because supply fell short; as Vertiv, Eaton and Forgent itself add factories, prices and orders could fall together.
- One kind of customer Data centers are 59% of sales and one customer 11%; a pause in AI building hits most of the company at once.
- An owner who keeps selling Neos holds 37% of the vote, can block major decisions, and has sold in every offering since February.
- Copper in fixed prices Many orders carry no clause passing on metal costs, and copper rose last year and again this quarter.
- Less to see Orders will be reported once a year, so a slowdown could show first in a missed quarterly forecast.
The evidence under this - 7 claims
- 2026-11-12editedre-read in the Q1 fiscal 2027 10-Q, whose raw-material passage names copper's volatility and gives no update on escalators
What we still do not know
- How Forgent's delivery times compare with rivals' product by product, measured by a buyer rather than by the company.
- What a customer can do to cancel or delay an order in the $3.0B backlog, and at what cost.
- How much of last year's margin came from shortage pricing that would reverse when delivery times return to normal.
- Why the finance chief left seven months after listing, without severance, weeks before the first quarter's report; the company says family time and no disagreement.
The evidence under this - 5 claims
No outside source measures Forgent's own lead times; the industry's 44-week switchgear average (C10) is the only comparison found, and Vertiv has doubled its switchgear capacity (C12).
Cancellation terms are not disclosed, and from FY27 orders and backlog are reported only once a year (C14), so neither the cover nor the 40% can be checked until September 2027.
- 2026-11-12editedthe Q1 fiscal 2027 call said backlog fully covers the raised guide and about 40% of it falls after FY27
- 2026-10-23editedre-struck at the 22 October close: the shares fell 38.2% since 2 October and 21.5% in one session
- 2026-10-23editedThe 15-minute bars put the fall at the open, minutes after the 7:00am release of the finance chief's departure; the claim said the day's filings did not explain it.
- 2026-10-22editedThe 21 October 8-K replaced the finance chief; the claim named Fiedler as the current one.
- 2026-10-22editedA same-day 8-K/A stated the departure was not a disagreement over operations, accounting or reporting; the claim carried only the unconfirmed family reason.
What would change our view
- Attractive→NeutralThe price rises back within 20% of fair value
It needs:
- ○The share price rises back to about $22.13, 80% of what we think the business is worth.about ≈$22.00 today, -45% above the last close
- Attractive→UnattractiveThe plan behind the year weakens
It needs any of:
- ○The company cuts its fiscal 2027 sales forecast below $2.4B.watched as it happens
- ○Orders taken in the year to June 2027 come in below that year's sales.watched as it happens
- Attractive→UnattractiveThe accounts are in doubt
It needs:
- ○A filing restates past results, reports a weakness in its accounting controls, or the auditor leaves.watched as it happens
- Attractive→UnattractiveThe price runs 20% above fair value
It needs:
- ○The share price rises to about $33.19, 20% above what we think the business is worth.about ≈$32.48 today, -20% above the last close
We would also be wrong if
- The company cuts its fiscal 2027 sales forecast below $2.4B.
- The profit margin stays below 21% after the first quarter of fiscal 2027.
- Industry switchgear delivery times fall below six months while Forgent's prices fall.
What is coming
- 28 January 2027 Annual meeting: The first proxy statement and the board Neos nominates.
Every dated event ahead
- 28 January 2027 Annual meeting: The first proxy statement and the board Neos nominates.
- 15 February 2027 Q2 FY27 results: Whether the raised FY27 guide holds and the margin climbs toward the year's implied 24%, with copper costs inside fixed-price orders.
- June 2027 Tijuana Powertrain expansion online: Whether capacity reaches about $5.8B of revenue as planned.
- 15 September 2027 FY27 results with annual bookings and backlog: Whether a year of orders at least matches a year of revenue, the one test of FY28 the company still publishes.
Since we wrote this
- 17 NovPrice moveMoved to Attractive: the price fell past 80% of our valueWith no new fact against the business the shares fell to about 74% of our value; the bear case is far below and orders are reported yearly, but the cushion now pays for those risks.
- 13 NovPrice moveShares fell to the edge of our cushion; Neutral heldThe shares fell 9.8% to $22.15 on the report day, about 80% of our value of about $27.66, a few cents above the line where the view would turn Attractive.
- 12 NovEarningsBeat the quarter's forecast and raised the year; Neutral heldSales of $478.6M beat the $465M top of the forecast and the year's plan rose $50M; on the call orders about doubled, by management's count. The price sits at about 89% of our value.
- 11 NovPrice moveNeutral held at 79% of our value, a day before resultsThe shares slipped past our 80% line by about a point. That cushion is too thin for a value spread this wide, so the view holds; it moves to Attractive near $20.41, or as the report tests the year.
- 10 NovPrice moveShares rose 16% to $22.60; still inside our cheap lineThe re-struck price is 79% of our $28.58 value, 1% of value inside the 80% line at $22.86, so the view held.
- 10 NovThesis reviewMoved to Neutral: priced at 83% of a value near $27.21Re-valued on the owner's rules of 10 November, with the return on new capital gliding to its long-run level.
- 9 NovThesis reviewStill Attractive: priced at 68% of a value near $28.58Re-valued in three stages at an 8% return, the method now drawn on every thesis: the price sits more than 20% under the base case.
- 23 OctPrice moveShares fell 38% in three weeks; view moved to AttractiveAt 13.5 times FY27's guided profit the year in backlog is paid for and FY28 is nearly free; the 12 November report tests the beat.
- 23 OctThesis reviewThe 22 October fall traced to the finance chief's exitThe shares opened 14% lower minutes after his departure was released; the view holds, and a restatement or control weakness would now make it unattractive.
- 22 OctNewsFinance chief leaves; quarter to beat guide, report 12 NovemberAn internal successor and a stated beat with no figures leave the case as it was; the 12 November print is the first under the new finance chief.
- 5 OctThesis writtenNeutral, medium convictionWritten three weeks after the first annual report as a listed company, with the shares 39% below their June high.
- 5 OctThesis reviewThe long case now sits under the verdictAfter the five-name pilot, the owner asked for the long case on every thesis.
Also checked 1 time with nothing new to act on.
Sources 23
Sources - 23
Every claim above cites one of these, or states the reasoning that derived it. The quote is frozen at the date it was read: a link can rot, and an agent fetch returns a reading of a page rather than the page. Backs counts the whole claim ledger, so it can name a claim this page does not surface.
- S01primarycompany filing2026-09-15products, campuses, competitors, end-market and product mix, customer concentration, the risk factors on pricing, capacity and copper, the Up-C structure, the tax receivable agreement, debt, ownership and executive paybacksC01C02C06C07C08C12C13C17C18C19C24C25C26C28C31C32C33
- S02primarycompany release2026-09-15Q4 and full-year results by product type, bookings, backlog, adjusted EBITDA and EPS reconciliations, and fiscal 2027 and Q1 guidancebacksC02C03C04C06C14C23C25
- S03primarytranscript2026-09-15Forgent Q4 fiscal 2026 earnings call transcript (FMP), held 15 September 2026backlog quality and FY27 cover, lead times, growth by end market against the market, the first AI-lab order and hyperscaler MSA, the Tijuana expansion, the move to annual order reporting, and M&A as the first use of cash
So anything in our backlog is a firm purchase order. So there's no LOIs.
backsC03C04C05C08C14C15C16C23C27 - S04primaryindustry data2025-08-13Wood Mackenzie press release: power and distribution transformers will face supply deficits of 30% and 10% in 2025 Wood Mackenziethe transformer supply deficit and the import share of US supply
In 2025, imports will account for an estimated 80% of US power transformer supply and 50% of the distribution transformer supply.
backsC09 - S05secondarynews2026-01-02industry switchgear and transformer lead times, and the view that procurement rather than capacity is the bottleneck
Lead times reflect the pressure: switchgear averaged 44 weeks in Q2 2025
backsC10 - S06primarygovernment data2026-10-01U.S. Census Bureau, Value of Private Construction Put in Place, not seasonally adjusted (C30, August 2026) U.S. Census BureauUS data center construction spending, monthly and year to date
Data center | 7535 | 6898 | 6244 | 5627 | 5198 | 4312 | 45226 | 31920 | 41.7
backsC11 - S07primarycompany filing2026-02-13Vertiv Holdings Form 10-K for the fiscal year ended 31 December 2025 Vertiv Holdings CoVertiv's switchgear, busbar and modular power offering and its capacity additions since 2021backsC12
- S08primarycompany filing2026-07-02the offering's size and price, the shares sold by the selling stockholders, the use of the company's proceeds to buy units from the continuing owners, and the lock-upbacksC18
- S09primarycompany filing2026-06-26the $600M term loan refinanced at a lower margin and the revolver repricedbacksC19
- S10primaryindustry data2026-07-07Dell'Oro Group press release: Data Center Physical Infrastructure market expands 28 percent Y/Y in 1Q 2026 Dell'Oro Groupthe size and growth of data center power and cooling equipment, and that North America is more than half of it
the worldwide Data Center Physical Infrastructure (DCPI) market grew 28 percent year-over-year to $12 billion in manufacturer revenue in 1Q 2026
backsC29 - S11primarycompany release2025-05-20NVIDIA technical blog: NVIDIA 800 V HVDC architecture will power the next generation of AI factories NVIDIAthe 800 VDC rack power design, its 2027 timing and the power partners NVIDIA names
By converting 13.8 kV AC grid power directly to 800 VDC at the data center perimeter using industrial-grade rectifiers, most intermediate conversion steps are eliminated
backsC30 - S12secondaryvendor data2026-10-05Research pack (FMP market data, FINRA, SEC filed figures), frozen as research-pack.jsonprice and range, peer prices, the analyst series and estimates, price target drift, short interest, insider trades, the earnings history and the cohort multiplesbacksC21C22C24C33
- S13primarycompany filing2025-11-19Powell Industries Form 10-K for the fiscal year ended 30 September 2025 Powell IndustriesPowell's engineered-to-order switchgear and electrical houses, the closest listed product matchread, but no claim rests on it
- S14primarycompany filing2026-10-22the change of finance chief: who left, who replaced him, the terms, and the company's stated reasonbacksC21C31
- S15primarycompany filing2026-10-22that September-quarter revenue and adjusted EBITDA will exceed the high end of guidance, with no figures, and the report datebacksC21C23
- S16primarycompany filing2026-10-22the clarification that the finance chief's departure was not the result of any disagreement on operations, policies, practices, financial condition, accounting or reportingbacksC21C31
- S17secondaryvendor data2026-10-22Daily closes to 22 October 2026 (FMP end-of-day prices): FPS, Vertiv, EatonFPS close of $24.92 on 22 October 2026, 21.5% below $31.76 the day before, on 44.4M shares against 7.1M; Vertiv down 7.8% and Eaton down 6.3% the same daybacksC21
- S18secondaryvendor data2026-10-22FMP 15-minute bars, FPS, 21 and 22 October 2026FPS closed 21 October at $31.75; on 22 October it opened at $27.18, traded as low as $25.05 in the first 15 minutes on 2.6M shares, reached $23.16 by 3:15pm and closed at $24.92 after rising from $23.19 in the last 45 minutesbacksC21
- S19primarycompany filing2026-11-12Forgent Q1 fiscal 2027 results release (Exhibit 99.1 to the Form 8-K of 12 November 2026), SEC EDGARQ1 fiscal 2027 revenue, profit, adjusted EBITDA, cash flow, balance sheet and the raised fiscal 2027 guidancebacksC23C35C36
- S20primarycompany filing2026-11-12revenue by offering, the tax receivable agreement payable, the raw-material passage and the controls conclusionbacksC28C36
- S21secondaryvendor data2026-11-13the 12 November 2026 close of $22.15backsC35
- S22primarytranscript2026-11-12Forgent Power Solutions Q1 fiscal 2027 earnings call transcript (FMP)order growth in the quarter, the share of backlog beyond FY27 and with neoclouds, customer concentration, book-and-ship capacity, AI-lab and hyperscaler progress, grid order softness, the Q2 guide and the free-cash-flow outlook; questions from JPMorgan, Wolfe, Bernstein, KeyBanc, Wells Fargo, Jefferies, Bank of America, Oppenheimer, Goldman Sachs, Morgan Stanley and ROTH
Q1 orders in '27 were just about 2x what they were in Q1 of '26 ... there's probably somewhere around 40% of that, that sits outside of '27, the majority of that being obviously therefore in '28 ... right around 15% of our backlog is with the neoclouds and any intermediary serving that ... in Q1, no one customer made up more than 10% of our revenue ... we came into '27 with about a $250 million book and ship capability ... that $250 million is pretty much exhausted at this point ... we secured a volume order from one AI lab and an initial order from a second ... 2 customers have moved beyond the MSA stage and signed specific product agreements
backsC05C15C37 - S23secondaryvendor data2026-11-17the 13 and 16 November closesbacksC35