A gas turbine burns gas to spin a generator. GE Vernova builds the biggest, plus grid equipment and wind turbines, and services the turbines it has sold.
Oracle swapped planned turbines for Bloom fuel cells.
Is it a good business? · 6 · What does its record show?
From losses to thin profit, with huge cash
Sales, $B
29.7
33.2
34.9
38.1
44.0
Dec 2022Dec 2023Dec 2024Dec 2025last 12 mo
Sales$29.7B → $44.0Bsales, 2022 to the past year
Profit−9.7% → 6.4%operating profit per $1
Cash$17.1Bfree cash, much of it deposits
Spending on new capacity grows faster than sales, paid for with customers' deposits.
Is it a good business? · 7 · How much room is there to grow?
The most gas plant orders in 25 years
130 GWgas plants ordered worldwide in 2025
29.8 GWGE Vernova's turbine orders
Roughly 23%its share
In the US alone planned gas plants add up to about 65 GW.
Is it a good business? · 8 · Who is in charge?
A turbine man running the company
Since 2021Scott Strazik has run it
Well under 1%of the shares held by insiders
January 2027a new finance chief arrives
Strazik came up through the gas turbine business before running the whole company.
The story right now · 9 · Why does AI need gas turbines?
Data centres need power faster than grids can add it
130 GWgas plants ordered in 2025
About 65 GWplanned in the US
Through 2030turbines sold out
AI data centres need large amounts of steady power quickly. Gas plants can be built faster than most alternatives, so turbine orders hit a 25-year high.
The story right now · 10 · Why is the cash flattering?
Cash paid in advance is owed back in turbines
Buyers reserve a slotNot yet a firm order.
They pay a depositCash arrives now.
GE Vernova owes a turbineYears later.
Reservations can lapseCash would reverse.
Much of this year's cash is deposits, much of the profit one-off gains, and many slots are reservations rather than firm orders.
The story right now · 11 · What changed lately?
Orders nearly doubled and deposits hit a record
$29.3Borders, up 96% before deals
$45.7Bcustomer deposits
About $9.0Bfor Trench Group, half borrowed
13 GWof reservations made firm
Strong quarter
The power business kept 21.4 cents of each sales dollar; it expects 130 GW under contract by year end.
The story right now · 12 · What is everyone arguing about?
Sold out, but already priced?
Many investors think
Sold out, prices rising, cash pouring in
We think
The demand is real and already priced
Against us: deposits keep rising while profit per $1 climbs toward 20%.
The price and our view · 13 · What is a share worth?
The price sits at our sunny case
$547what we think a share is worth · the last close is of that
$547our value
Attractive below $438
Neutral
Unattractive above $657
$257gloomy: growth halves, less kept per $1
$547our estimate: experts' path, then slowing
$770sunny: growth beats the forecast by a quarter
Value per share in three futures. None is a prediction of the share price.
We estimate what a share is worth from the cash the business should earn over many years. Our rule: buy only when the price is at least a fifth below our estimate, as a cushion for being wrong.
The price and our view · 14 · How could we be wrong?
Reservations may lapse and deposits unwind
Reservations lapseBiggest
Not firm orders.
Buyers go elsewhereShowing now
Rivals win on delivery.
Deposits unwindWatch
Cash would reverse.
Lapsed reservationsUnknown
Never disclosed.
Wind keeps losing money, and the Trench purchase added debt.
The price and our view · 15 · How will we know?
Late January shows slots turning into orders
Reservations keep turning firmGood sign
Profit per $1 climbs toward 20%We turn neutral
Deposits start fallingBad sign
JAN 202728
Fourth-quarter 2026 results and the 2027 forecast, 28 January. Companies report every three months; each report is a test of the story.
Our view also changes on price alone: if the shares fall to within a fifth of our estimate, we move to Neutral.
The price and our view · 16 · So, what do we think?
The scarcest power equipment, already priced
$547our value
Attractive below $438
Neutral
Unattractive above $657
UnattractiveMedium conviction
GE Vernova builds gas turbines and grid gear buyers queue years for, sold out through 2030. But much of this year's cash is deposits, many slots are reservations, and the price sits at our sunny case.
↑ ↓ to move · C for contents
What it does
More about the company
Who it is
When a country or a data centre needs electricity day and night, the usual answer today is a gas power plant, and its heart is a gas turbine: a machine the size of a house that burns gas to spin a generator. GE Vernova is one of the few companies building the biggest ones.
It also sells the transformers and switchgear that connect plants to the grid, services about 7,000 of its turbines already running, and builds wind turbines. Buyers now wait three years or more.
How it makes money
It sells equipment, then earns for decades servicing it. In Q3 2026 the power business kept 21.4 cents of profit before depreciation from each dollar of sales and the grid business 19.1 cents, while wind earned 2.6 cents after losing money for most of the year.
Buyers pay deposits years before delivery: customer deposits reached $45.7B in September, from $26.0B in January. That cash arrives now; the work to earn it comes later.
Growth and profit
What growth costs
Growth is making GE Vernova more profitable: office and sales costs grow far slower than sales and research spending stays small, so higher prices reach the margin. The real cost of growth is new factories, and customers' deposits are paying for them.
Its record
The numbers
Is it growing?Steady
Sales grew 17% over the twelve months to Sep 2026, faster than the 9.0% in the year to Dec 2025.
Is it profitable?Thin
Operating margin is 6.4%, up from −2.8% in the year to Dec 2023.
Does growth pay off?Pays off
Running costs take 15¢ of each sales dollar, down from 21¢ in the year to Dec 2022.
Does it earn good returns?Strong
Each dollar put into the business earns 25% a year after tax, up from 3.4% in the year to Dec 2024.
Is it making cash?Strong
It turned 39% of sales into free cash, $17.1B over the last twelve months.
How steady is it?Steady
Yearly sales growth has ranged from +5.1% to +12% over the last 3 years.
Are shares being diluted?Stable
The share count fell 2.2% in 3.8 years.
Why it wins
The evidence
Building a large gas turbine takes decades of know-how in metal parts that survive temperatures above their melting point. Three companies, GE Vernova, Siemens Energy and Mitsubishi Power, supply turbines for about two-thirds of the gas plants being built worldwide.
When demand outruns what three factories can make, they set the price: GE Vernova says new orders are priced more than 20% above late 2025's. Even Baker Hughes resells its turbines rather than building its own.
Who could beat it
The rivals in full
The shortage is sending buyers elsewhere. Doosan of Korea now has twelve big turbines to deliver in the US, sold on delivery time. Data centre builders have taken Mitsubishi and Siemens machines, Oracle swapped planned turbines for Bloom fuel cells, and a Texas site chose 42 Wärtsilä gas engines.
Each rival
Doosan Enerbility034020.KS
The heavy-duty frame itself for US data centre buyers: twelve 380MW-class units to deliver in the US, sold on delivery time where GE Vernova is sold out through 2030.
Siemens Energy and Mitsubishi PowerENR.DE7011.T
The same heavy-duty slot, sold to named US data centre power buyers - Tallgrass took Mitsubishi M501JAC units, Fermi bought Siemens SGT6-5000F frames.
On-site gas turbines at the data centre: Oracle swapped planned turbines at Project Jupiter for fuel cells, and AEP is buying up to 1 GW as a bridge.
Wärtsilä 50SG gas enginesWRT1V.HE
The aeroderivative or small frame at an off-grid data centre plant: 790 MW in Texas on 42 engines.
Hitachi Energy and Siemens Energy grid businesses6501.TENR.DE
Transformers, high-voltage direct-current links and substations on any given utility tender, where the 10-K names them first.
Vestas Wind SystemsVWS.CO
The onshore and offshore turbine order itself; Wind orders fell 40% in Q2 2026 while the 10-K names Vestas first among rivals.
How big it could get
The market and who has signed
The market
The International Energy Agency counts 130 GW of new gas power plants ordered worldwide in 2025, the most in 25 years. GE Vernova took 29.8 GW of turbine orders that year, roughly 23% of that. In the US alone, planned gas plants add up to about 65 GW through 2030. Nobody outside the makers says how long a boom this size lasts.
Who has signed
Contracted work reached $196.72B at 30 September 2026. Of the 122 GW of turbines under contract, 64 GW are firm orders and 58 GW are reservations, which the company itself says may never become orders. NRG reserved 3.6 GW; Hawaiian Electric and Israel's OPC have signed firm purchases.
Who runs it
Leaders, pay and the cash
Who runs it
Scott Strazik has run the business since 2021 and ran its gas turbine arm before that; a new finance chief arrives in January 2027. Insiders own well under 1%. Most of the bonus and half of the long-term shares pay on free cash flow and profit. Free cash flow counts customers' down payments, so last year the cash part of the bonus paid its maximum largely on deposits.
What they did with the money
It bought back 4.3M shares for $3.6B in the first half of 2026, at an average $854, and paid $5.275B in cash for Prolec. The buybacks were paid for largely with customer deposits, money it still has to earn by delivering turbines.
The last report
The latest report
GE Vernova's orders nearly doubled, deposits hit $45.7B, and it raised its forecast again
What it did to the thesis Strong quarter
It passed all three tests we set: firm turbine orders, deposits and the power margin. But the strength was already in the plan, and the new purchase adds debt for a business whose profit is not disclosed.
The report
Q3 2026 beat the bar the case set: orders $29.3B, up 96% before acquisitions, revenue up 27%, and the power business kept 21.4 cents of each sales dollar as profit. Turbines under contract rose to 122 GW, with 13 GW of reservations turning into firm orders.
Free cash flow was $5.4B, mostly from customers paying ahead, and the yearly cash forecast went to $16B-$17B. It also agreed to buy Trench Group, a grid-parts maker, for about $9.0B, half in debt, closing in late 2027.
What's happening now
The background
The shares closed at $1,174.86 on 30 June 2026 and were at $895.08 on 27 October, 23.8% lower, with the third-quarter results still to come. Those results arrived on October 28 and beat every test, and the company raised its cash forecast and its buyback authorization to $20B.
The next answer is the fourth quarter in late January: whether turbine slots keep turning into orders toward the 130 GW the company now expects by year-end.
Where we disagree
Both sides in full
The market
The cleanest way to own the power shortage: sold out through 2030, prices rising, cash pouring in.
We believe
The demand is real and already priced; the cash is mostly deposits and the profit mostly one-off gains.
The argument
The deposits sit in the quarterly filing's cash-flow detail, and the gains in the release's footnotes; the headline cash and profit figures show neither.
The case against us: if deposits keep rising through 2027 while margins climb toward 20%, they are tracking a growing pile of orders, not a peak, and the market is right.
What it's worth
How we value it
Valued on the analysts' revenue path for three years, each later year closing 30% of the gap to 4%, on official operating profit with stock pay a cost and tax paid in full; the thesis's own evidence is the check on that path.
What the price assumes
Sales growth in the first year, then slowing as ours does, at the same profit per sale.
The price assumed
37.2%
Our estimate
18%
Measured at the close of
6 Nov 2026
The three cases
Bear case$257
Growth runs at half the analysts' path, 9%, 8% and 7%, the margin settles a fifth lower at 14.0%, and new capital earns only the 8% rate: the downturn test.
Our value$547
Revenue grows 18%, 15% and 15% over three years, the analysts' path (C78), then fades toward 4%, closing 30% of the gap each year; the margin moves to 17.4%, the analysts' year-three figure after stock pay and on the filed basis (1.1% less).
Bull case$770
Growth runs a quarter above the analysts' path, 22%, 19% and 18%, the margin reaches 19.2%, and new capital earns 15%.
The bet
Seen as a bet
The bet is on two new products: the BWRX-300, a small nuclear reactor designed with Hitachi, and a solid-state transformer, an electronic one for data centres. One reactor is being built in Ontario, the transformer is a prototype, and neither reports sales, so the rest is counted separately, at the price this thesis calls attractive.
If a few reactors are building and the first transformer order is delivering by 2028, the shares are worth less than today. If both fail, shareholders keep the rest, about three-quarters of today's value.
What could go wrong
Every risk
The risks
Reservations lapse
58 GW of slots are reservations, not orders; a rival says such deposits simply lapse if the buyer walks away.
Deposits unwind
If orders peak, the cash customers paid ahead turns into work to deliver with no new cash behind it.
Buyers go elsewhere
Doosan, Mitsubishi, Siemens, fuel cells and gas engines are all winning buyers who cannot wait.
Wind keeps losing
Wind lost $657M in the first half of 2026 and the 2028 plan needs it profitable.
A plan three years out
The price rests on a 20% margin in 2028 that the company has never earned.
A $9.0B bet on grid parts
The Trench Group purchase is half debt and closes in late 2027; the documents give no figure for what Trench earns.
What we still do not know
How big a deposit a reservation carries, and how many reserved gigawatts have ever lapsed.
GE Vernova's exact share of big turbine orders against Siemens Energy and Mitsubishi.
What a turbine costs per kilowatt, and how fast that price is rising.
Who Doosan's US data centre customer is, and whether others are following.
What changes our view
Every route to a new view
Every route to a new view
→ Neutral
The share price falls to about $657, back within 20% of what we think the business is worth.
→ Attractive
The share price falls to about $438, 80% of what we think the business is worth.
The next test
It supports the case if
Gas gigawatts under contract at or above 130 GW at year-end with backlog above the 64 GW of 30 September, contract liabilities at or above $45.67B, and Power's segment EBITDA margin at 19% or more.
It pressures the case if
Gas gigawatts under contract below 122, backlog at or below 64 GW, contract liabilities below $45.67B, or Power's margin below 19% - a sign deposits are unwinding faster than new orders refill them.
We would also be wrong if
The power business earns a margin below 17% in 2027.
Wind loses money again in the second half of 2026.
The verdict
Scores and how we weighed it
The scores
Growth
3 of 4
Business quality
3 of 4
Financial position
4 of 4
Execution record
3 of 4
Per share capture
4 of 4
Potential
3 of 4
Risk profile
3 of 4
Valuation
2 of 4
Evidence quality
3 of 4
How we weighed it
ValueNegative
The price sits above our value and at the bull case.
BusinessPositive
Turbines and grid gear sold out for years, with a strong balance sheet.
GrowthPositive
Firm turbine orders and customer deposits passed the tests we set.
RisksNegative
Reservations can lapse, deposits unwind if orders peak and rival turbine makers are winning.
RivalsMixed
No filed rival compares directly; its own past is mostly losses.
The groupMixed
Power names move together on AI power news.
Latest newsPositive
The last report passed all three tests, though the price already pays for it.
In plain words
Our estimate of value
We forecast how much cash the business can earn over the next ten years and beyond, then ask what that stream is worth today to an investor who wants an 8% yearly return. We do it three times: a gloomy future, an expected one and a sunny one. We call a share Attractive only when its price is at least 20% below the expected estimate, and Unattractive when it is 20% above.