Generac makes generators that start when the power fails
Homes
backup generators running on the gas line
Data centres
big diesel sets for whole buildings
9,700 dealers
who sell and install them
A home standby generator sits on a pad outside and starts within seconds of an outage. American homes lost power for 11 hours on average in 2024, nearly double the decade before.
The company · 2 · What exactly does it sell?
Homes over half; businesses and data centres a third
Each $1 of sales, 2025
54%35%12%
Home generators and batteriesGenerators for businessesParts, warranties, subscriptions
Each home unit sold through its dealers also brings service and repeat business.
The company · 3 · How does it make money?
The home half keeps twice as much of each dollar
About 22 centskept per $1 on home products
About 11 centskept per $1 on commercial
Growth is now coming from data centres, the half that keeps about half as much of each sales dollar.
Is it a good business? · 4 · What gives it an edge?
The dealer network protects the home business
About 9,700
dealers, nearly 400 more in a year
70 to 80 weeks
rivals' quoted waits for big sets
Home generators are quoted, permitted and installed by local electricians. A rival with a good machine still needs installers. That network does nothing for the data-centre business.
Abroad, other packagers use the same engine; Generac's exclusive deal covers only the US.
Is it a good business? · 6 · What does its record show?
Growth has been getting more expensive
Sales, $B
3.7
4.6
4.0
4.3
4.2
4.6
Dec 2021Dec 2022Dec 2023Dec 2024Dec 2025last 12 mo
Sales$3.7B → $4.6BDec 2021 to the last 12 months
Overhead15% → 29%overhead and research per $1, 2021 to 2025
Home profitAbout 22 centskept per home dollar
Research, selling and overheads rose faster than sales since 2021, and data centres need new plants first.
Is it a good business? · 7 · How much room is there to grow?
Data centres could triple their share of US power
6.7% to 12%data centres' share of US electricity by 2028, forecast
4.4%in 2023, national laboratory
Every data centre needs backup power for all its load. Nobody publishes the price of large sets.
Is it a good business? · 8 · Who is in charge?
The builder of home standby, paid partly on profit
Since 2008Aaron Jagdfeld as chief executive
2.4%of the shares owned by insiders
46%of target bonus paid for 2025; the last share award missed
Insiders bought no shares in the past year.
The story right now · 9 · Why do data centres need generators?
Every data centre needs backup power for all its load
+18%the shares on the Amazon deal
About $4.5Bunfilled data-centre orders
70 to 80 weekswaits for rivals' big sets
A data centre cannot go dark when the grid fails, so builders buy diesel sets to carry the whole building. With rivals' waits long, delivery speed wins orders.
The story right now · 10 · Can sales grow while profit lags?
Growth is moving to the half that keeps less
Home sales stallIn calm weather years.
Data-centre orders growAbout $4.5B unfilled.
They keep less per dollarAbout 11 cents against 22.
Profit grows slowerThan sales do.
Against us: commercial profit per dollar could rise as volumes grow, and more large orders could follow Amazon's.
The story right now · 11 · What changed lately?
Sales rose 16% as data-centre orders grew
$1.29Brecord quarterly sales
+28%commercial and industrial
About $4.5Bunfilled data-centre orders, from $1.6B
Solid quarter
Home sales returned to growth, and most orders ship in 2027; nothing is booked yet for 2028 from Amazon. The shares lost 23% from 9 October to 5 November with no company news.
The story right now · 12 · What is everyone arguing about?
Are data-centre orders worth what the price pays?
Many investors think
A data-centre winner with a soft home business
We think
Real orders, shifting growth to the lower-profit half
Sales shift toward data centres, which keep about half as much of each dollar. Against us: commercial profit could rise with volume.
The price and our view · 13 · What is a share worth?
The price sits close to our value
$189what we think a share is worth · the last close is of that
$189our value
Attractive below $151
Neutral
Unattractive above $227
$74.62gloomy: data-centre customers cancel or delay
$189our estimate: the orders ship on time
$307sunny: more big orders follow Amazon
Value per share in three futures. None is a prediction of the share price.
We estimate what a share is worth from the cash the business should earn over many years. Our rule: buy only when the price is at least a fifth below our estimate, as a cushion for being wrong.
The price and our view · 14 · How could we be wrong?
Cancelled orders, calm weather and rivals
Orders cancelled or delayedBiggest
Some contracts carry cancellation rights.
Quiet weatherShowing now
Calm years stall the home half.
Rivals catch upWatch
Shorter waits end the speed edge.
Data-centre profitUnknown
What the large contracts earn.
Amazon's warrant lets it earn nearly 3% of the company as it buys.
The price and our view · 15 · How will we know?
February shows 2027's outlook and 2028 orders
Fourth-quarter sales of about $1.4B, home sales growingGood sign
$1B of 2028 data-centre orders beyond AmazonGood sign
A delayed or cancelled data-centre orderBad sign
FEB 202710
Fourth-quarter 2026 results and the 2027 outlook. Companies report every three months; each report is a test of the story.
Our view also changes on price alone: we turn positive if the shares fall a fifth below our estimate, and negative if they rise a fifth above it.
The price and our view · 16 · So, what do we think?
A home-generator leader becoming a data-centre supplier
$189our value
Attractive below $151
Neutral
Unattractive above $227
NeutralMedium conviction
Generac leads home backup generators, and its commercial arm grows fast on data centres. But those orders keep about half as much of each dollar and can be cancelled, and the price sits close to our value. Neutral.
↑ ↓ to move · C for contents
What it does
More about the company
Who it is
A home standby generator is an engine bolted on a pad outside the house, running on the gas line. When the grid fails, a switch starts it within seconds. American homes lost power for 11 hours on average in 2024, nearly double the decade before.
For data centres Generac packages large diesel engines, bought from one supplier, into generator sets that carry a whole building. Builders want backup for all their load and, with rivals quoting waits of 70 to 80 weeks, delivery speed wins orders.
How it makes money
It earns money by selling equipment. In 2025 home products were 54% of sales, commercial and industrial products 35%, and parts, warranties and subscriptions the rest.
The home business is the profitable half: in 2025 it kept about 22 cents of each sales dollar as profit before interest, tax and amortisation, against about 11 for the commercial half. Each unit sold through its 9,700 dealers also brings service and repeat business.
Growth and profit
What growth costs
Growth has been getting more expensive. Since 2021 spending on research, selling and overheads has risen much faster than sales, squeezing profit. The new growth comes from data centres, which earn about half the home margin and need new plants first.
Its record
The numbers
Is it growing?Slow
Sales grew 6.1% over the twelve months to Sep 2026, faster than the −2.0% in the year to Dec 2025.
Is it profitable?Healthy
Operating margin is 10%, about where it was (9.6%) in the year to Dec 2023.
Does growth pay off?Costly
Running costs take 30¢ of each sales dollar, up from 17¢ in the year to Dec 2021.
Does it earn good returns?Low
Each dollar put into the business earns 8.7% a year after tax, down from 21% in the year to Dec 2021.
Is it making cash?Solid
It turned 9.0% of sales into free cash, $414M over the last twelve months.
Is the balance sheet safe?Light debt
It owes $875M more than the cash it holds, about 1.5 years of the cash its operations bring in.
Are shares being diluted?Shrinking
The share count fell 7.3% in 4.8 years, and pay in shares costs 1.1% of sales.
Why it wins
The evidence
The protection is the dealer network. Home standby is quoted, permitted and installed by local electricians, and Generac has about 9,700 of them, nearly 400 more than a year ago. A rival with a good machine still needs installers in every town, and the main rivals are private firms that publish no comparable network.
The evidence it works: home standby sales still grew in mid-2026 with outages more than 30% below normal. It does nothing for the data-centre business.
Who could beat it
The rivals in full
In data centres Cummins and Caterpillar sell the same kind of generator sets and both report strong data-centre demand. Abroad, other packagers use the same engine, since Generac's exclusive deal covers only the US. In homes, batteries from Tesla and Enphase can replace a generator for short outages.
Each rival
Rehlko, Briggs & Stratton and Champion, private makers of home standby and portable generatorsprivate
a homeowner buys a rival standby or portable generator from another dealer or a store
a homeowner rides out short outages on a battery, often paired with solar, instead of a generator
Google's Nest and Resideo's thermostatsGOOGLREZI
a homeowner or a utility programme picks a rival thermostat instead of ecobee
Cummins and Caterpillar, which sell the same large generator sets to data centresCMICAT
a data-centre builder orders its backup generators from Cummins or Caterpillar
MTU, the generator business of Rolls-RoyceRR.L
a data-centre builder orders MTU generator sets
Other packagers abroad using the same engine, such as Atlas Copco, Himoinsa and AKSAnot listed
outside the US a buyer orders the same engine packaged by a rival, since Generac's engine exclusivity is US-only
How big it could get
The market and who has signed
The market
American data centres used about 4.4% of the country's electricity in 2023; a national laboratory expects 6.7% to 12% by 2028. That means roughly 17 to 46 gigawatts of new average load, and each gigawatt needs at least as much backup.
Nobody publishes the price of large backup sets or how much new load will use batteries instead, so the market cannot be put in dollars.
Who has signed
Amazon expects $2.4B of deliveries in 2027 and 2028, and holds a warrant that vests as it pays. Unfilled data-centre orders were about $4.5B at the end of September, up from $1.6B in June, with no split by customer or year. A third operator signed a framework with no volume yet. Some contracts carry cancellation rights.
Who runs it
Leaders, pay and the cash
Who runs it
Aaron Jagdfeld has been chief executive since 2008 and chairman since 2016; he built the home standby business and led the move into data centres. York Ragen has been finance chief as long.
Insiders own 2.4%. Half of the executives' share awards pay on sales growth, profit margin and cash, and the last three-year award missed its sales and margin goals. Insiders bought no shares in the past year.
The last report
The latest report
Generac's third-quarter sales rose 16% as data-centre orders grew to about $4.5B
What it did to the thesis Solid quarter
It supported the data-centre half: orders grew sharply, most of them ship in 2027 and home sales returned to growth. Nothing is booked yet for 2028 from the first large customer, so our view holds.
The report
The quarter to September 2026 was a record: sales rose 16% to $1.29B. Commercial and industrial sales rose 28% on data-centre generators, and home sales rose 9%, a return to growth after a 2% fall in the spring. Profit before interest, tax and amortisation reached 19.8% of sales, and the release names no tariff refund this time.
Management said unfilled data-centre orders have grown to about $4.5B, kept its sales forecast and raised the low end of its margin forecast. Sales came in about 2% under expectations, though adjusted earnings per share beat by 7%. On the call, the chief executive said over half of those orders ship in 2027.
What's happening now
The background
The shares fell by a third from June's peak to September, jumped 18% when the Amazon deal was announced, then fell 23% between 9 October and 5 November, to the lowest close since the deal, with no company news behind the latest drop.
The next test is the fourth-quarter report, expected around 10 February with 2027 guidance: the forecast implies sales near $1.4B, and investors want orders for 2028 beyond Amazon's.
Where we disagree
Both sides in full
The market
A data-centre winner with a temporarily soft home business, worth paying up for.
We believe
The data-centre orders are real, but growth is moving to the lower-margin half while the richer half stalls.
The argument
Bulls count the orders and bears point to the margin. The segment figures show both at once: sales shift toward data centres, which keep about half as much of each dollar.
The evidence against us: if commercial margins rise as volumes grow and 2028 orders arrive, profit could beat what analysts expect.
What it's worth
How we value it
A home-generator leader turning into a data-centre supplier is valued on analysts' 2026 and 2027 sales, which need the backlog to ship, and a GAAP margin after stock pay and amortisation, slowing toward 4% by year ten, each year closing 30% of the gap.
What the price assumes
Sales growth in the first year, then slowing as ours does, at the same profit per sale.
The price assumed
20.6%
Our estimate
16%
Measured at the close of
6 Nov 2026
The three cases
Bear case$74.62
Data-centre customers use their cancellation rights or defer (C16): 2027 grows only 10% and 2028 is flat, the lower-margin commercial mix holds the margin at 11% (C07), and new capital earns only its 9% cost.
Our value$189
2026 grows about 16%, analysts' $4.94B (C42) after Q3 sales rose 16%; 2027 grows 30% to their $6.52B as the $4.5B data-centre backlog and Amazon's deliveries ship (C62, C15); 2028 slows to 12%; the GAAP operating margin, after stock pay and about $120M of acquisition amortisation, rises from 10.4% to 14%.
Bull case$307
The backlog ships on time and more hyperscale orders follow the Amazon deal (C15, C62): 2027 grows 38% and 2028 20%, and scale lifts the GAAP margin to 16%, near 2024's 12.5% plus the refunds-free home margin.
The bet
Seen as a bet
This bet is on one small line: utilities paying ecobee, Generac's thermostat maker, to turn enrolled thermostats down for a few hours when the grid is short of power. Generac does not report what it earns from this.
Everything else Generac makes is counted separately, at the price its expected profit already supports, and on its own it covers today's price. So the thermostat line comes free, but even a good outcome adds very little, which makes it an expensive bet. A rival platform already enrols every brand.
What could go wrong
Every risk
The risks
Orders cancelled or delayed
Some data-centre contracts carry cancellation rights, and a large operator delaying its sites would leave 2027 short.
Quiet weather
Home sales depend on outages; a run of calm years leaves the higher-margin half stalling.
Rivals catch up
Cummins and Caterpillar are adding capacity; if their waits shorten, Generac's speed stops winning orders.
One engine supplier
Its large generators rely on one engine maker, exclusive only in the US.
Lawsuits and regulators
Injury claims, a home-generator defect class action and an emissions inquiry into portable generators cost $142.3M of provisions in 2025.
Amazon's warrant
Amazon can earn nearly 3% of the company as it buys, so part of the gain goes to the customer.
What we still do not know
Whether orders beyond Amazon's reach $1B for 2028, and what margin the large data-centre contracts earn; the call said more than half of the $4.5B ships in 2027.
What margin the large data-centre contracts earn, and how much a customer can cancel.
How much new data-centre load will use diesel backup rather than batteries or on-site power.
What changes our view
Every route to a new view
Every route to a new view
→ Unattractive
The share price rises to about $227, 20% above what we think the business is worth.
→ Attractive
The share price falls to about $151, 20% below what we think the business is worth.
The next test
It supports the case if
Sales of about $1.4B or more, Residential up on the year again, the data-centre backlog holding near $4.5B or higher with 2028 orders beyond Amazon's at $1B, and Commercial and Industrial margin before refunds at 12.5% or more.
It pressures the case if
Sales short of $1.3B, Residential down on the year, the backlog falling or a customer deferring, or Commercial and Industrial margin before refunds below 12.5%.
We would also be wrong if
Data-centre deliveries lift 2027 sales above analysts' $6.52B with the commercial margin holding.
The verdict
Scores and how we weighed it
The scores
Growth
3 of 4
Business quality
3 of 4
Financial position
3 of 4
Execution record
2 of 4
Per share capture
3 of 4
Potential
3 of 4
Risk profile
3 of 4
Valuation
3 of 4
Evidence quality
3 of 4
How we weighed it
ValueMixed
The price is about nine-tenths of our value, with the bear case far below.
BusinessPositive
It leads home backup generators through its dealer network.
GrowthMixed
Data-centre orders grow fast at about half the home margin.
RisksNegative
Orders may be cancelled, calm weather stalls home sales, rivals are adding capacity and it relies on one engine supplier.
RivalsMixed
It sits between its two large rivals, priced like them.
The groupMixed
It sits in none of our ranked groups; outages and data-centre building move it.
Latest newsPositive
Orders grew sharply and home sales returned to growth.
In plain words
Our estimate of value
We forecast how much cash the business can earn over the next ten years and beyond, then ask what that stream is worth today to an investor who wants an 8% yearly return. We do it three times: a gloomy future, an expected one and a sunny one. We call a share Attractive only when its price is at least 20% below the expected estimate, and Unattractive when it is 20% above.